Report by Wahyu Adi Triono

2026-06-12
463-2K1
Problem: Reactivation automatic filling water
Action: see detail...
Status: done
2026-06-12
443-PH1
Problem: Cross Check Lamp Area PH 2 and 3 floor
Action: see detail...
Status: done
2026-06-11
443-WB2-M1
Problem: Issue unbalance ampere motor
Action: see detail...
Status: done
2026-06-12
WORK-SHOP
Problem: Completely electrical Drawing 443-2K2
Action: see detail...
Status: done
2026-06-11
463-2K1
Problem: issue leakage O2
Action: see detail...
Status: done
2026-06-11
FEED-BIN
Problem: Issue level Tonnage Limestone Sensor error (Load Cell)
Action: see detail...
Status: done
2026-06-10
483-BU1&-363-HS2
Problem: Relocation sensor flow to calciner. Stop Local
Action: see detail...
Status: done
2026-06-10
L1C-TR1
Problem: Modification roof SW L1 BC4, repare all safety device-test safety device
Action: see detail...
Status: done
2026-06-10
443-2K2
Problem: Activation lamp for collective fault
Action: see detail...
Status: done
2026-06-09
443-2K2
Problem: Continue electrical drawing and test signal
Action: see detail...
Status: done
2026-06-09
L3C-TR1
Problem: PMR Inspection Motor Area Tripper ( L1C_BC1 to BC7 ) and TLS
Action: see detail...
Status: done
2026-06-08
483-FA2
Problem: Check vibration-noise of FS and LS
Action: see detail...
Status: done
2026-06-08
443-2K2
Problem: Make programe off delay at LOGO around 2s for input 1-2-3
Action: see detail...
Status: done
2026-06-08
443-2K2
Problem: activation proximity level sensor signal N-M input to LOGO 110 VAC for output DC and labelling push button signal reset at 443 2K2-C1-ACK
Action: see detail...
Status: done
2026-06-08
WORK-SHOP
Problem: 443 2K2 re electric drawing upload to server manual book server
Action: see detail...
Status: done
2026-06-08
463-KL1-
Problem: Support feed on for KILN
Action: see detail...
Status: done
2026-06-08
ROOM-DIESEL-PUMP
Problem: Issue lighting lamp off
Action: see detail...
Status: done
2026-06-08
363-MD1-&-363-FA2
Problem: clean up CB room-filter motor 363 FA2-measure all CB replace if needed
Action: see detail...
Status: done
2026-06-07
423-BF1-&-L63-HS1-&-443-2K2-&-483-PF1-&-453-PF1
Problem: Issue zero value is big around 2.2 mbar. Recalibration for zero adjust-issue sump pump area many water or sump pump not working-rewiring cable for reset continue test function reset and alarm humidity-calibration zero and span
Action: see detail...
Status: done
2026-06-07
423-BF1-PDT-2002-&-L63-HS1
Problem: Issue zero value is big around 2.2 mbar. Recalibration for zero adjust. Sump pump area many water or sump pump not working
Action: see detail...
Status: done
2026-06-04
L63-SX1
Problem: Repare coupling Motor
Action: see detail...
Status: done
2026-06-04
L63-3B1
Problem: Issue indication often not accurate
Action: see detail...
Status: done
2026-06-03
423-BF1-&-443-2K1
Problem: Service JB 19 no 6 issue leakage & check addresing from CCR and create alarm to CCR
Action: see detail...
Status: done
2026-06-03
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-06-03
483-BL5-&-483-BL9
Problem: Add grease motor
Action: see detail...
Status: done
2026-06-02
WORK-SHOP
Problem: Make notification for job rewinding motor shell of kiln
Action: see detail...
Status: done
2026-06-02
BURNER-FLOOR
Problem: Reposition camera for view of fire
Action: see detail...
Status: done
2026-06-02
L63-RM1-&-473-CC1-&-463-KL1
Problem: PMR Critical Motor Area KL + CM + CC
Action: see detail...
Status: done
2026-06-02
363-RM1-&-443-PH1
Problem: PMR Critical Motor Area RM
Action: see detail...
Status: done
2026-05-29
463-KL1
Problem: Check motor shell cooling fan
Action: see detail...
Status: done
2026-05-29
443-FN1
Problem: Install cable power for Power Point
Action: see detail...
Status: done
2026-05-29
WORK-SHOP
Problem: TPM Assessment & Report
Action: see detail...
Status: done
2026-05-29
L63-RM1
Problem: Check indication temperature roller of west side
Action: see detail...
Status: done
2026-05-28
363-RM1-&-443-PH1-&-L63-RM1
Problem: Install AUTO grease pump
Action: see detail...
Status: done
2026-05-28
393-FA5
Problem: Replace bearing motor issue high noise
Action: see detail...
Status: done
2026-05-28
IDO-TANK-&-L1C-BC1-&-L1C-BC4
Problem: WBI Elect & Ins & Check I/O CM,Sump T&T
Action: see detail...
Status: done
2026-05-26
393-BE1
Problem: Issue speed failure at CCR operator
Action: see detail...
Status: done
2026-05-26
443-PH1
Problem: Cross Check temperature Cyclone 4 north and south (Gas Material)
Action: see detail...
Status: done
2026-05-26
333-MS1
Problem: Optional installation MS
Action: see detail...
Status: done
2026-05-25
443-PH1-&-463-2K1
Problem: Certification Flow Diesel Calciner & Travelling probe not smooth
Action: see detail...
Status: done
2026-05-25
WORK-SHOP
Problem: Prepare AUTO Grease tank
Action: see detail...
Status: done
2026-05-25
L63-RM1-&-473-CC1-&-463-KL1
Problem: PMR Critical Motor Area KL + CM
Action: see detail...
Status: done
2026-05-25
363-RM1-&-443-PH1
Problem: PMR Critical Motor Area RM
Action: see detail...
Status: done
2026-05-22
483-FA2
Problem: Recondition motor
Action: see detail...
Status: done
2026-05-23
483-FA2
Problem: High vibration and noise motor
Action: see detail...
Status: done
2026-05-23
363-CV2
Problem: Issue speed failure
Action: see detail...
Status: done
2026-05-23
LA3-VA1
Problem: Install and fabrication vessel air tank
Action: see detail...
Status: done
2026-05-23
L1C-BC4
Problem: Pulling cable powerpoint from L1C BC4 to L1C BC5. Install power point
Action: see detail...
Status: done
2026-05-22
463-2K1
Problem: Support sample Line broken
Action: see detail...
Status: done
2026-05-21
483-FA2-M1
Problem: Ddismantle motor issue vibration motor high
Action: see detail...
Status: done
2026-05-21
453-PF1
Problem: Adjusment CF to 3 t/h Decrease
Action: see detail...
Status: done
2026-05-21
WP3-WF1
Problem: Install lighting lamp
Action: see detail...
Status: done
2026-05-20
L63-RM1-&-443-CT1
Problem: PMR service analyzer & issue high temperature
Action: see detail...
Status: done
2026-05-19
423-BF1
Problem: Issue JB03 No 9 abnormal
Action: see detail...
Status: done
2026-05-19
463-2K1-&-443-2K1-&-463-KR2-T2
Problem: PMR service analyzer Cross check or replace
Action: see detail...
Status: done
2026-05-19
493-AC2-&-493-AC3
Problem: Check AUTO Grease motor and replace if needed
Action: see detail...
Status: done
2026-05-18
363-BE1-M2
Problem: Install motor
Action: see detail...
Status: done
2026-05-18
423-2K1
Problem: PMR service CEMS and issue flame off at FIDOR
Action: see detail...
Status: done
2026-05-18
CAMERA-BURNER
Problem: Issue Abnormal
Action: see detail...
Status: done
2026-05-18
L63-RM1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-05-11
BIN-SHALE
Problem: Calibration bin shale
Action: see detail...
Status: done
2026-05-11
WORK-SHOP
Problem: Complete data calibration RTD area RM-CC-Kiln-CM
Action: see detail...
Status: done
2026-05-11
333-MS1
Problem: Issue motor abnormal function
Action: see detail...
Status: done
2026-05-11
443-PH1-&-393-RF6
Problem: Install sensor temperature at location. Issue oil come inside motor
Action: see detail...
Status: done
2026-05-11
443-PH1&-393-RF6
Problem: Install sensor temperature at location. Issue oil come inside motor at 393 RF6
Action: see detail...
Status: done
2026-05-10
393-BE1---473-FA6--473-FA7
Problem: Connected cable motor
Action: see detail...
Status: done
2026-05-10
CCR-&-443-CT1
Problem: Cleaning all PC unit operator and replace s/v gun no 14 of air issue air leakage, check function gun 4 for water not function
Action: see detail...
Status: done
2026-05-10
473-CC1
Problem: Pulling cable RTD of 473 FA5-473 FA3-473 FA6
Action: see detail...
Status: done
2026-05-10
443-CX1
Problem: Pulling cable indication ( 120 m ) issue pressure low indication and activation I/O
Action: see detail...
Status: done
2026-05-10
453-PF1
Problem: Mechanical reposition slide gate make normal indication. Cleaning ventury cooler
Action: see detail...
Status: done
2026-05-09
ER5
Problem: Replace ampere meter - prepare replace battery of ER5 and connection cable
Action: see detail...
Status: done
2026-05-09
423-VA2
Problem: continue fabrication and test gate - ML
Action: see detail...
Status: done
2026-05-09
473-CC1
Problem: Prepare pulling cable and re-installation cable RTD
Action: see detail...
Status: done
2026-05-09
473-HC1-&-443-FN1-&-473-FA6
Problem: Issue motor trip - connected sensor motor
Action: see detail...
Status: done
2026-05-09
473-CC1-&-463-KL1-&-L63-RM1
Problem: Calibration temperature RTD
Action: see detail...
Status: done
2026-05-09
ER3-&-ER4-&-ER5
Problem: Black out support process
Action: see detail...
Status: done
2026-05-08
RM-CC-CM
Problem: Calibration temperature RTD area RM-Cooler-CM
Action: see detail...
Status: done
2026-05-07
443-PH1-&-L63-RM1
Problem: Install motor and connect cable- alignment motor
Action: see detail...
Status: done
2026-05-07
WEST-AND-EAST-BLENDING
Problem: Replace terminal unit at panel I/O
Action: see detail...
Status: done
2026-05-06
WORK-SHOP
Problem: Complete data calibration pressure transmitter OH Nr1
Action: see detail...
Status: done
2026-05-06
473-FN7-&-MAIN-GATE-ACCESS-CONTROL
Problem: Rrecheck connection cable power motor and add silicone for outside panel cable motor & Inspection electrical and welding tools
Action: see detail...
Status: done
2026-05-04
WORK-SHOP
Problem: Calibration pressure transmitter area RM-CM-PH-CC for zero and span
Action: see detail...
Status: done
2026-05-04
MAIN-GATE-ACCES-CONTROL-&-WORK-SHOP
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-05-03
WORK-SHOP
Problem: Calibration pressure transmitter for zero and span area Cooler
Action: see detail...
Status: done
2026-05-03
ER3-&-ER4
Problem: Support black out process. Measure MV-clean up VCB-VCS-DS. Regreasing VCB-VCS-DS
Action: see detail...
Status: done
2026-05-01
WORK-SHOP
Problem: Calibration pressure transmitter area PH-RM-CC-CM
Action: see detail...
Status: done
2026-05-01
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools for contractor
Action: see detail...
Status: done
2026-04-29
WORK-SHOP
Problem: Calibration pressure transmitter area Cooler - Pre heater - Coal mill for zero and span process
Action: see detail...
Status: done
2026-04-29
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-28
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-27
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-26
MAIN-GATE-ACCES-CONTROL--&-473-CC1
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-24
TENT-OH
Problem: Install lighting lamp
Action: see detail...
Status: done
2026-04-24
463-2K1
Problem: Issue O2 Abnormal. Replace O2 sensor
Action: see detail...
Status: done
2026-04-24
443-WP5-M1
Problem: Issue high noise replace bearing
Action: see detail...
Status: done
2026-04-24
MAIN-GATE-AND-WORK-SHOP
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-23
443-WP5-M1
Problem: Issue high noise up 2 gE
Action: see detail...
Status: done
2026-04-23
TENT-OH
Problem: Install lighting lamp
Action: see detail...
Status: done
2026-04-23
SUPRA-&-TRUBA-JAGA-CITA
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-22
WORK-SHOP
Problem: Completly data TPM ER3
Action: see detail...
Status: done
2026-04-22
443-PH1-&-473-CC1
Problem: Repare-Replace lighting lamp
Action: see detail...
Status: done
2026-04-22
AFR-WORK-SHOP-&-TPE
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-21
443-PH1-&-L63-RM1
Problem: Repare-Replace Lamp
Action: see detail...
Status: done
2026-04-21
FLOW-METER-DIESEL
Problem: Support Calibration Flow meter diesel
Action: see detail...
Status: done
2026-04-21
INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Mechanic 2 & Truba Jaga Cita & CBM
Action: see detail...
Status: done
2026-04-20
PYROMETER
Problem: Issue often retract
Action: see detail...
Status: done
2026-04-20
MAIN-GATE-ACCES-CONTROL-&-NECHANIC-2
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-20
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-20
L63-RM1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-04-20
363-RM1-&-443-PH1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2026-04-17
WF-LIMESTONE-&-W83-WF1
Problem: Activation power point front & Pulling cable power +Tagging Labeling
Action: see detail...
Status: done
2026-04-17
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-17
493-AC1
Problem: Repare slink position
Action: see detail...
Status: done
2026-04-17
ER5
Problem: Ware house ER5 cleaning area inside room
Action: see detail...
Status: done
2026-04-17
ER3
Problem: GEMBA TPM ER3
Action: see detail...
Status: done
2026-04-16
WORK-SHOP
Problem: Activation power point front of WF Limestone
Action: see detail...
Status: done
2026-04-17
WORK-SHOP
Problem: Continue fabrication and prepare welding point out position L1C RE1
Action: see detail...
Status: done
2026-04-16
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2026-04-16
WORK-SHOP-PPUP
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-15
L1C-RE1
Problem: Fabrication + prepare welding point outside
Action: see detail...
Status: done
2026-04-15
WORK-SHOP
Problem: Report PMR and WBI
Action: see detail...
Status: done
2026-04-15
443-CT1-&-WINCI-IDO
Problem: Check SV abnormal no 4 & 14 & issue failure
Action: see detail...
Status: done
2026-04-14
443-2K1
Problem: Issue low flow indication
Action: see detail...
Status: done
2026-04-14
443-CT1
Problem: Issue Kiln Down from Temp High
Action: see detail...
Status: done
2026-04-14
363-MD1
Problem: Support Motor recondition 363 MD1
Action: see detail...
Status: done
2026-04-14
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-14
W83-WF1-
Problem: Fabrication cable power and LCS
Action: see detail...
Status: done
2026-04-13
L1C-TR1
Problem: Repare Breake Motor ( Dismalting, fabrication, Setting )
Action: see detail...
Status: done
2026-04-13
363-RM1-&-443-PH1,L63-RM1,473-CC1
Problem: PMR service critical motor LSR RM-CM & PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-04-10
ER6
Problem: Fabrication cable ladder and cover tunnel ER6
Action: see detail...
Status: done
2026-04-10
453-PW2-&-4D3-SC4
Problem: Issue temperature Motor alarm & fabrication cover motor also install at site
Action: see detail...
Status: done
2026-04-09
CKD-MOTOR
Problem: Painting Area CKD Motor
Action: see detail...
Status: done
2026-04-09
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-09
WORK-SHOP-&-443-FN1
Problem: Continue Wiring control W83-WF1 & install panel power point
Action: see detail...
Status: done
2026-04-09
WORK-SHOP
Problem: Report PMR and WBI 30 Maret- 9 April 2026 (Re-Check)
Action: see detail...
Status: done
2026-04-08
WORK-SHOP
Problem: Report PMR and WBI 30 March - 8 April 2026
Action: see detail...
Status: done
2026-04-06
WORK-SHOP
Problem: Prepare Wiring control FABA
Action: see detail...
Status: done
2026-04-07
483-BL1
Problem: Issue LS vibration 11 mm/s continue replace bearing and install motor
Action: see detail...
Status: done
2026-04-07
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-07
TRUBA-JAGA-CITA;
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-04-06
363-RM1-&-443-PH1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-04-06
L63-RM1-&-473-CC1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2026-04-06
PT-PINCURAN-MAS
Problem: Inspection Tools Pincuran Mas
Action: see detail...
Status: done
2026-04-03
WF-FABA
Problem: Support upgrade WF FABA
Action: see detail...
Status: done
2026-04-02
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-04-02
ER6
Problem: Cleaning ER6 and MCC panel
Action: see detail...
Status: done
2026-04-02
WORK-SHOP
Problem: Continue Prepare Upgrade fabrication Control WF FABA & Report Bearing Support recondition motor
Action: see detail...
Status: done
2026-04-02
CIVIL-BUILDING-WORKSHOP
Problem: Check Tool Civil Building
Action: see detail...
Status: done
2026-04-01
CKD
Problem: Fabrication cover motor for area CKD - Continue Painting Yellow
Action: see detail...
Status: done
2026-04-01
WORK-SHOP
Problem: Continue Prepare Upgrade fabrication Control WF FABA
Action: see detail...
Status: done
2026-04-01
L1C-BC4
Problem: Issue sump pump abnormal condition
Action: see detail...
Status: done
2026-04-01
L1C-BC4
Problem: Issue sump pump abnormal condition
Action: see detail...
Status: done
2026-04-01
ER4
Problem: Clean up ER and MCC panel
Action: see detail...
Status: done
2026-04-01
WORK-SHOP
Problem: Complete form recondition motor by SBI and vendor and bearing support
Action: see detail...
Status: done
2026-04-01
L1C-TR1-&-L3C-RE1
Problem: Clean Up Panel Control L1C-TR1, Radio Link, L3C-RE1
Action: see detail...
Status: done
2026-04-01
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-03-31
363-MD1
Problem: Issue Temp Winding T6 high > 128 Deg
Action: see detail...
Status: done
2026-03-31
WORK-SHOP
Problem: Prepare and fabrication control FABA ( info control at Mr.Yunus )
Action: see detail...
Status: done
2026-03-31
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-03-31
413-3B1-&-3B2-&-473-CC1-&-463-KL1
Problem: WBI Elec & Ins & Check I/O & S Pump Blending, Cooler Area Kiln
Action: see detail...
Status: done
2026-03-30
WF-FABA
Problem: Observation power for weigh feeder
Action: see detail...
Status: done
2026-03-30
463-KL1
Problem: T Scanner Abnormal
Action: see detail...
Status: done
2026-03-30
463-FXB-M1
Problem: Issue Stop Local
Action: see detail...
Status: done
2026-03-30
CKD-MOTOR
Problem: Fabrication cover motor for area CKD
Action: see detail...
Status: done
2026-03-30
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2026-03-30
L63-RM1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-03-30
363-RM1-&-443-PH1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2026-03-27
ER5-&-423-2K1
Problem: Clean up ER5 and Cleaning Area Cems ( Report ALL ER period 26 Febuary and 27 March 2026)
Action: see detail...
Status: done
2026-03-27
493-3B1
Problem: Cleaning and Greasing Motor Area Clinker Silo
Action: see detail...
Status: done
2026-03-27
443-EL1
Problem: Issue door of elevator 5th abnormal
Action: see detail...
Status: done
2026-03-27
HRG
Problem: Y43-1G1 Increase Setpoint to 75 %
Action: see detail...
Status: done
2026-03-27
FEED-BIN
Problem: Observation relocation station area WF ( project upgrade WF FABA)
Action: see detail...
Status: done
2026-03-26
HRG
Problem: Y43-1G1 ( HRG Purifier (ELGA 2) , Issue Abnormal Level
Action: see detail...
Status: done
2026-03-26
WORK-SHOP
Problem: Prepare panel power point
Action: see detail...
Status: done
2026-03-26
473-FA1
Problem: Issue grease outside tank
Action: see detail...
Status: done
2026-03-26
L63-2K1&-L63-2K2-&-L63-2K3-&-483-2K1-&-463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-03-26
363-RM1-&-463-KL1-&-L63-RM1
Problem: WBI Switchgear, Cap & Trafo RM, KL & CM1
Action: see detail...
Status: done
2026-03-26
WORK-SHOP
Problem: Complete data check sheet for WBI Elec & Ins & Check I/O GCT, EP,PH&KL (Report 24-3-26) & PMR CCTV, IR TAD & Kiln Scanner NAR1 (Report 23-3-26)
Action: see detail...
Status: done
2026-03-17
WORK-SHOP
Problem: Prepare fabrication support portable power point
Action: see detail...
Status: done
2026-03-16
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2026-03-16
WORK-SHOP
Problem: Report PMR /WBI periode 9- 13 March 2026
Action: see detail...
Status: done
2026-03-13
MULTICYCLONE-RAW-MILL
Problem: Panel welding multicyclone raw mill tapping power
Action: see detail...
Status: done
2026-03-13
363-MD1
Problem: Continue Power point at 363-MD1 ( Tapping Power )
Action: see detail...
Status: done
2026-03-13
363-FA2-&-363--MD1
Problem: clean up CB room and check all CB of long carbon brush and clean up 363 FA2 filter motor
Action: see detail...
Status: done
2026-03-13
HRG-&-T-SCANNER-&-463-2K1
Problem: Y43-1G1 Prepare Running + Prepare Install-Cleaning ELGA unit (Continue)- Issue T scanner abnormal - Cooling system failure
Action: see detail...
Status: done
2026-03-12
WORK-SHOP
Problem: Continue Prepare Upgrade Control
Action: see detail...
Status: done
2026-03-12
363-MD1
Problem: Continue Power point at 363-MD1 ( Pulling cable and fabrication cable route )
Action: see detail...
Status: done
2026-03-12
473-FA9
Problem: Issue value draft abnormal
Action: see detail...
Status: done
2026-03-11
WORK-SHOP
Problem: Continue Prepare Upgrade Control 443 2K1
Action: see detail...
Status: done
2026-03-10
483-3B1
Problem: Issue signal proximity often bad. Replace proximity of gate bin
Action: see detail...
Status: done
2026-03-11
443-2K1
Problem: Continue upgrade control
Action: see detail...
Status: done
2026-03-11
443-2K1
Problem: Cleaning and painting room of analyzer
Action: see detail...
Status: done
2026-03-11
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-03-10
363-FN1-&-363-FN2
Problem: Cleaning Filter Issue Dirty - Control Alarm temperature
Action: see detail...
Status: done
2026-03-10
WORK-SHOP
Problem: Continue Prepare Upgrade Control 443 2K1
Action: see detail...
Status: done
2026-03-10
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2026-03-10
483-FA2-&-483-BL7
Problem: Issue high noise up 2 gE
Action: see detail...
Status: done
2026-03-10
473-GQ1
Problem: Issue lighting lamp off at south side
Action: see detail...
Status: done
2026-03-09
WORK-SHOP
Problem: Continue Prepare Upgrade Control 443 2K1
Action: see detail...
Status: done
2026-03-09
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-03-09
463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR
Action: see detail...
Status: done
2026-03-09
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR
Action: see detail...
Status: done
2026-03-06
WORK-SHOP
Problem: Continue Prepare Upgrade Control
Action: see detail...
Status: done
2026-03-06
L63-BF1
Problem: Observation replace diaphragm
Action: see detail...
Status: done
2026-03-06
473-DB1&-473-FA4
Problem: Repare cable Connection safety device and repare cable Connection Thermocouple
Action: see detail...
Status: done
2026-03-06
ER3-&-ER4-&-ER5-&-ER6
Problem: PMR Load MCC and UPS
Action: see detail...
Status: done
2026-03-05
433-BE1-&-443-2K1
Problem: Issue D5 Warning and Failure and observation due contamination of water
Action: see detail...
Status: done
2026-03-05
393-SC5
Problem: Observation issue Abnormal (Signal S dan Speed Monitor)
Action: see detail...
Status: done
2026-03-05
CIVIL-BUILDING-WORKSHOP
Problem: Repare lighting lamp off
Action: see detail...
Status: done
2026-03-04
463-KL1
Problem: Support Heating up + Feeding
Action: see detail...
Status: done
2026-03-04
WORK-SHOP
Problem: Prepare Audit API 2026
Action: see detail...
Status: done
2026-03-04
443-2K1
Problem: Line Purging broken and issue reading O2 high
Action: see detail...
Status: done
2026-03-04
ER3
Problem: Prepare Panel IO station N31 (Dismantling Panel ER 3 bottom )
Action: see detail...
Status: done
2026-03-04
363-FN1
Problem: Prepare power point
Action: see detail...
Status: done
2026-03-02
L93-3B1
Problem: Issue level abnormal
Action: see detail...
Status: done
2026-03-02
BURNER-FLOOR
Problem: Prepare and calibration of flow diesel
Action: see detail...
Status: done
2026-03-02
393-SC8
Problem: Prepare and install indication ampere
Action: see detail...
Status: done
2026-02-27
433-BE1-&-393-BE1
Problem: Fabrication and install cover motor
Action: see detail...
Status: done
2026-02-27
463-KL1
Problem: Issue shell cooling failure
Action: see detail...
Status: done
2026-02-27
WORK-SHOP
Problem: Prepare document for AUDIT API
Action: see detail...
Status: done
2026-02-27
ER6
Problem: TPM Gemba 5R
Action: see detail...
Status: done
2026-02-27
313-3B1
Problem: Continue level silo east blending error
Action: see detail...
Status: done
2026-02-26
393-3S1
Problem: Issue level blending silo error
Action: see detail...
Status: done
2026-02-26
WORK-SHOP-MECHANIC-1
Problem: Prepare TPM ER6 report
Action: see detail...
Status: done
2026-02-26
L63-MD1-AND-MOTOR-20-KW
Problem: Issue noise at L63 MD1
Action: see detail...
Status: done
2026-02-26
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2026-02-26
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-02-25
363-FN1
Problem: Temperature T6 , issue High indication
Action: see detail...
Status: done
2026-02-26
WORK-SHOP-MECHANIC-1
Problem: Prepare TPM Assesment
Action: see detail...
Status: done
2026-02-25
ER3
Problem: Issue AC Robicon issue hot around 36 degree C
Action: see detail...
Status: done
2026-02-26
393-SC3
Problem: Prepare installation indication of ampere
Action: see detail...
Status: done
2026-02-25
443-BE1-&-393-BE1
Problem: Add grease motor
Action: see detail...
Status: done
2026-02-25
463-FA-E
Problem: Issue motor ground replace position motor fan of stand by
Action: see detail...
Status: done
2026-02-25
443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-02-24
443-CT1-T2
Problem: Indication temperature low
Action: see detail...
Status: done
2026-02-25
CAMERA-BURNER
Problem: Issue view is not available at CCR operator
Action: see detail...
Status: done
2026-02-25
T-SCANNER
Problem: Dotted line view at CCR operator
Action: see detail...
Status: done
2026-02-24
3B1-W.PV-
Problem: Issue level indication error
Action: see detail...
Status: done
2026-02-24
WORK-SHOP
Problem: Ex 393-FA6 Service motor replace bearing
Action: see detail...
Status: done
2026-02-24
463-2K1
Problem: , Service analyser Unit
Action: see detail...
Status: done
2026-02-24
LA3-VA1
Problem: Proportional Valve Error
Action: see detail...
Status: done
2026-02-24
363-SR1
Problem: Issue indication temperature low at CCR
Action: see detail...
Status: done
2026-02-23
463-KL1-
Problem: Support heating up process
Action: see detail...
Status: done
2026-02-23
393-FA6
Problem: Replace motor
Action: see detail...
Status: done
2026-02-23
413-BF2
Problem: Replace PLC Siemens issue failure of PLC
Action: see detail...
Status: done
2026-02-23
363-MD1
Problem: Clean up carbon brush and measure actual condition of carbon brush
Action: see detail...
Status: done
2026-02-20
393-SGD-393-SGE-393-SGF
Problem: Dismantling solenoid valve
Action: see detail...
Status: done
2026-02-20
443-FN1
Problem: Tidy up cable power of blower fan
Action: see detail...
Status: done
2026-02-20
463-KL1
Problem: Continue relocation or repare shell kiln fan (Test Motor)
Action: see detail...
Status: done
2026-02-20
453-AE1-&-483-AE1
Problem: Check function aeration
Action: see detail...
Status: done
2026-02-20
473-FA3
Problem: Dismantling ex cable power
Action: see detail...
Status: done
2026-02-19
473-HD1
Problem: Relocation power stop contact
Action: see detail...
Status: done
2026-02-19
463-KL1
Problem: Continue relocation or repare shell kiln fan
Action: see detail...
Status: done
2026-02-19
L1C-BC1-TO-L1C-BC7
Problem: check actual KW motor-voltage-ampere motor
Action: see detail...
Status: done
2026-02-19
4W3-1NF
Problem: Replace ELCB di 4W3-1NE (Cooler Area)-- 2 EA broken
Action: see detail...
Status: done
2026-02-19
WORK-SHOP-MECHANIC-1
Problem: Prepare Data AUDIT API
Action: see detail...
Status: done
2026-02-17
483-FA2
Problem: Test Run
Action: see detail...
Status: done
2026-02-17
413-BL2
Problem: Replace breaker of local isolation
Action: see detail...
Status: done
2026-02-17
493-AC2
Problem: Issue speed failure
Action: see detail...
Status: done
2026-02-17
HEAT-EXCHANGER
Problem: Activation hoist crane
Action: see detail...
Status: done
2026-02-17
443-CT1-&-463-2K1
Problem: Activation flow meter and replace RTD of IKGA
Action: see detail...
Status: done
2026-02-17
443-PH1-473-CC1-413-3S1-413-3S2
Problem: Clean up panel I/O
Action: see detail...
Status: done
2026-02-13
CKD
Problem: Observation, cable needed of part electronic support project CKD
Action: see detail...
Status: done
2026-02-13
CKD
Problem: Observation cable way and prepare part needed rail cable project CKD
Action: see detail...
Status: done
2026-02-12
TOP-BLENDING-&-443-PH1
Problem: Clean up also check up LCS and motor
Action: see detail...
Status: done
2026-02-12
443-CT1
Problem: Support replace flow sensor
Action: see detail...
Status: done
2026-02-12
4D3-SC6
Problem: Activation indication ampere
Action: see detail...
Status: done
2026-02-12
EAST-BLEANDING-&-393-PP1
Problem: Clean up and check LCS - motor area blower blending east - 393 PP1
Action: see detail...
Status: done
2026-02-12
483-RF2
Problem: Connected cable power
Action: see detail...
Status: done
2026-02-11
483-RF1-&-483-BV1
Problem: Connect motor and BV
Action: see detail...
Status: done
2026-02-11
463-SC6
Problem: Install indication ampere unit
Action: see detail...
Status: done
2026-02-11
ER6
Problem: Clean up inside and outside from dirty of dust
Action: see detail...
Status: done
2026-02-11
363-FN1
Problem: Replace vibration sensor at free and fix side
Action: see detail...
Status: done
2026-02-11
ER3
Problem: install cover concrete at AC ROBICON
Action: see detail...
Status: done
2026-02-10
363-FN1
Problem: Support CBM for reposition FAN needed
Action: see detail...
Status: done
2026-02-10
493-AC2
Problem: Pull Cord damage
Action: see detail...
Status: done
2026-02-10
483-LD3
Problem: Dismantling damper and set gate at 100%
Action: see detail...
Status: done
2026-02-09
ER3
Problem: Dismanlting scraft Piping (Robicon AC ER-3)
Action: see detail...
Status: done
2026-02-09
483-FA2
Problem: Scaling VSD of motor (Speed -Amp)
Action: see detail...
Status: done
2026-02-09
363-FN1
Problem: Install Main Power and All Sensor
Action: see detail...
Status: done
2026-02-08
363-FN1
Problem: Install motor spare
Action: see detail...
Status: done
2026-02-08
483-FA2
Problem: Activation VSD of motor
Action: see detail...
Status: done
2026-02-06
BURNER-FLOOR
Problem: Tidy Up cable area burner
Action: see detail...
Status: done
2026-02-06
483-FA2
Problem: Disconnect power damper and indication
Action: see detail...
Status: done
2026-02-06
483-BU1
Problem: Install-Wiring Flow meter 483-BU1 + Commissioning
Action: see detail...
Status: done
2026-02-06
363-FN1
Problem: Support job at 363 FN1 ( disconnect cable sensor and Motor)
Action: see detail...
Status: done
2026-02-05
363-FN1
Problem: Support job at 363 FN1
Action: see detail...
Status: done
2026-02-05
443-2K1
Problem: Install sensor temperature Honey Well
Action: see detail...
Status: done
2026-02-05
483-RF1
Problem: install seal motor
Action: see detail...
Status: done
2026-02-05
443-PH1-&-TOP-BLENDING
Problem: Clean Up and Check LCS + Motor
Action: see detail...
Status: done
2026-02-04
FM-OF-DIESEL
Problem: Make flange at workshop plant
Action: see detail...
Status: done
2026-02-04
483-RF1
Problem: Install seal motor
Action: see detail...
Status: done
2026-02-04
433-FM2
Problem: Repare or fabrication way of load cell
Action: see detail...
Status: done
2026-02-03
IDO-TANK-&-L1C-BC1-&-L1C-BC4
Problem: Check function sump pump
Action: see detail...
Status: done
2026-02-03
443-Z4A-T3
Problem: Replace Thermocouple
Action: see detail...
Status: done
2026-02-03
463-FX1
Problem: Relocation LCS
Action: see detail...
Status: done
2026-02-03
473-FAC-M1
Problem: Clean up LCS and area motor (Area Burner )
Action: see detail...
Status: done
2026-02-03
393-SC3
Problem: Support and fabrication new control upgrade
Action: see detail...
Status: done
2026-02-03
423-BF1
Problem: Repare control safety valve issue cable not right position
Action: see detail...
Status: done
2026-02-02
493-AC1
Problem: Replace or repare cable burn
Action: see detail...
Status: done
2026-02-02
483-RF1
Problem: Issue seal reducer to motor leakage
Action: see detail...
Status: done
2026-02-02
423-BF1
Problem: Relocation pressure senso
Action: see detail...
Status: done
2026-02-02
393-SC3-M2
Problem: Disconnect motor
Action: see detail...
Status: done
2026-02-02
WORK-SHOP
Problem: SOT of febuary 2026
Action: see detail...
Status: done
2026-02-02
473-HS1
Problem: Replace / repare -Pulling and install cable burn area 473-HS1
Action: see detail...
Status: done
2026-01-30
ER5
Problem: Continue activation and connected VSD 483 FA2 and create module DCS
Action: see detail...
Status: done
2026-01-30
WORK-SHOP
Problem: Make report data safety for TPM ER6 4 file
Action: see detail...
Status: done
2026-01-29
ER5-483-FA2
Problem: Continue activation and connected VSD 483 FA2
Action: see detail...
Status: done
2026-01-29
WORK-SHOP
Problem: TPM Activity ER6
Action: see detail...
Status: done
2026-01-29
WORK-SHOP
Problem: Scanning data or complete calibration 2025-2026
Action: see detail...
Status: done
2026-01-28
ER6
Problem: Gemba TPM ER6
Action: see detail...
Status: done
2026-01-27
453-PW1
Problem: Wrapping unit to protect from production activity
Action: see detail...
Status: done
2026-01-27
363-RM1
Problem: Wiring and install support welding panel of cyclone 363 RM1
Action: see detail...
Status: done
2026-01-27
ER5
Problem: Activation and connected VSD of 483 fA2
Action: see detail...
Status: done
2026-01-27
SUMP-PUMP
Problem: Check function of sump pump all area
Action: see detail...
Status: done
2026-01-26
MAIN-GATE-ACCES-CONTROL
Problem: Inpsection electrical and welding tools of PT Indoporlen
Action: see detail...
Status: done
2026-01-26
473-FA3-&-473-FA4
Problem: Fabrication cover motor
Action: see detail...
Status: done
2026-01-26
ER3
Problem: Activation CCTV ER3 - office way
Action: see detail...
Status: done
2026-01-26
EAST-BLEANDING-&-WEST-BLENDING-&-CT-TRANSPORT
Problem: Clean up welding panel - I/O panel - area motor from dirty of dust
Action: see detail...
Status: done
2026-01-23
473-HS1
Problem: Issue cable burn area 473 HS1
Action: see detail...
Status: done
2026-01-23
453-GA1-&-453-GA2
Problem: Disconnected cable 453-GA1/2
Action: see detail...
Status: done
2026-01-23
ER3
Problem: Prepare set of CCTV for ER3 2 unit
Action: see detail...
Status: done
2026-01-23
FEED-BIN
Problem: Extention module I/O at feed bin support upgrade weight feeder FABA
Action: see detail...
Status: done
2026-01-23
WORK-SHOP
Problem: Prepare fabrication power point area L1C BC5
Action: see detail...
Status: done
2026-01-22
463-KL1
Problem: Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) and Install Point Port (Continue) - Connect port FX
Action: see detail...
Status: done
2026-01-22
ER2
Problem: Continue activation remote VCS at ER3
Action: see detail...
Status: done
2026-01-22
453-PF1-483RF1-483-RF2-483-AG1-453-AG1
Problem: Wrapping part because production activity
Action: see detail...
Status: done
2026-01-22
443-FN1-&-473-FAA
Problem: Repare handle LOTOTO ID Fan and handle LCS 473 FAA
Action: see detail...
Status: done
2026-01-22
483-RF3
Problem: Disconnect motor rotary feeder
Action: see detail...
Status: done
2026-01-22
L1C-BC1
Problem: Issue sump pump failure
Action: see detail...
Status: done
2026-01-22
473-CC1-&-463-KL1
Problem: Clean Up and Check LCS and motor cooler and Kiln Bottom
Action: see detail...
Status: done
2026-01-21
463-KL1
Problem: Fabrication cable tray and connected FX Kiln (Shell Fan Kiln) + Install Point Port (Continue) - Connect port FX
Action: see detail...
Status: done
2026-01-21
ER3
Problem: Prepare-Rewiring LAN Install Converter-POE unit and office way
Action: see detail...
Status: done
2026-01-21
ER3-&-ER4-&-ER5
Problem: Install SOP of MICOM P122 and P225
Action: see detail...
Status: done
2026-01-19
ER3-&-MAIN-GATE
Problem: Inspection electrical and welding tools of PT Civacon and PT RMP
Action: see detail...
Status: done
2026-01-20
463KL1-&-BURNER-FLOOR
Problem: Clean Up dan Check LCS Area Burner + Kiln + Heat Exchanger
Action: see detail...
Status: done
2026-01-19
463-KL1
Problem: Fabrication cable tray and connected FX Kiln (Sheal Fan Kiln)
Action: see detail...
Status: done
2026-01-15
L1C-RE1
Problem: Cleaning MCC and PLC
Action: see detail...
Status: done
2026-01-15
443-PH1-&-473-CC1
Problem: Inspection electrical and welding tools of PT TRUBA JAGA CITA
Action: see detail...
Status: done
2026-01-15
443-PH1
Problem: Activation I/O 2nd floor 443 PH1 ( project upgrade 443 2K1 & 463 2K1) and addressing
Action: see detail...
Status: done
2026-01-15
423-BF1
Problem: Activation I/O module, migitation solenoid failure
Action: see detail...
Status: done
2026-01-14
HRG
Problem: HRG shutdown ( long time idle )
Action: see detail...
Status: done
2026-01-14
L1C-TR1
Problem: Continue fabrication welding panel area truck lift
Action: see detail...
Status: done
2026-01-13
L1C-TR1
Problem: Fabrication welding point area truck lift
Action: see detail...
Status: done
2026-01-13
473-CC1-AND-BURNER-FLOOR
Problem: Activation welding panel area burner and cooler
Action: see detail...
Status: done
2026-01-12
463-KL1
Problem: 463 KL1 T1 issue reading temperature at CCR low
Action: see detail...
Status: done
2026-01-12
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-01-12
L63-RM1-&-473-CC1
Problem: PMR Service Critical Motor & LSR CM & CC
Action: see detail...
Status: done
2026-01-12
363-RM1-&-443-PH1
Problem: PMR service critical motor LSR RM-PH
Action: see detail...
Status: done
2026-01-09
363-MD1
Problem: replace CB no 6-8-9
Action: see detail...
Status: done
2026-01-09
WORK-SHOP
Problem: Install camera WS electric
Action: see detail...
Status: done
2026-01-09
WORK-SHOP
Problem: Complete data check sheet inspection electrical tools of PT Pincuran Mas
Action: see detail...
Status: done
2026-01-09
493-AC2
Problem: Replace Box hagger + Accecories
Action: see detail...
Status: done
2026-01-09
L93-SC4
Problem: Issue speed failure
Action: see detail...
Status: done
2026-01-09
443-PH1
Problem: Replace spray pump
Action: see detail...
Status: done
2026-01-08
ER5
Problem: Support take sample oil trafo
Action: see detail...
Status: done
2026-01-08
463-2K1
Problem: Issue O2 High and repare chain tention
Action: see detail...
Status: done
2026-01-08
363-RM1
Problem: Prepare part Cover Motor
Action: see detail...
Status: done
2026-01-08
L1C-BC1
Problem: Install welding point and issue sump pump failure
Action: see detail...
Status: done
2026-01-07
363-RM1-CN
Problem: Prepare Welding Point RM Cyclone
Action: see detail...
Status: done
2026-01-07
WORK-SHOP
Problem: L1C BC1-BC2-BC3 prepare welding panel
Action: see detail...
Status: done
2026-01-07
PINCURAN-MAS-WORK-SHOP
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2026-01-07
L1C-BC1
Problem: Lighting lamp off near welding panel
Action: see detail...
Status: done
2026-01-07
423-BF1
Problem: Issue JB 21 No 7 Abnormal
Action: see detail...
Status: done
2026-01-06
L1C-TR1
Problem: Install selector AUTO-MAN for signal START-STOP activated vibrator from CCR
Action: see detail...
Status: done
2026-01-06
L1C-TR1
Problem: Prepare cable for sensor position minimal 2 pair around 15 m x 3
Action: see detail...
Status: done
2026-01-06
L1C-TR1
Problem: Pulling cable and connection sensor to terminal & commissioning ML indication
Action: see detail...
Status: done
2026-01-06
WORK-SHOP
Problem: Fabrication tray cable to sensor ML 3 point
Action: see detail...
Status: done
2026-01-06
ER6
Problem: wiring I/O 24 VDC and signal
Action: see detail...
Status: done
2026-01-05
363-FA2
Problem: Cooling Fan Failure
Action: see detail...
Status: done
2026-01-05
FEED-BIN
Problem: Observation upgrade control WF feed bin
Action: see detail...
Status: done
2026-01-05
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2026-01-05
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2026-01-05
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2026-01-02
WORK-SHOP
Problem: Make sign for 493 AC2 and 493 AC3
Action: see detail...
Status: done
2026-01-02
ER6
Problem: Pulling cable control L1C BC1-BC2-BC3
Action: see detail...
Status: done
2026-01-02
433-BF2
Problem: Replace or upgrade module. Issue error at process
Action: see detail...
Status: done
2025-12-31
443-FN1
Problem: Observation blower at 443 FN1
Action: see detail...
Status: done
2025-12-31
463-2K1-&-443-2K1
Problem: PMR Service analyzer Preheater & IKGA N1 + completing part for upgrade 443 2K1 at SAP
Action: see detail...
Status: done
2025-12-31
EP--PH--GCT-PH-KL
Problem: WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Action: see detail...
Status: done
2025-12-31
FEED-BIN--RAWMILL-CT--DUST-TRASNPORT---BAG-FILTER
Problem: WBI Electric & Ins & Check I/O Feed Bin-RM-CT-Dust Transport-Bag Filter
Action: see detail...
Status: done
2025-12-31
BURNER-FLOOR
Problem: Dismalting Welding Point Burner+ Clean Up + relocation power lubrication exchanger point
Action: see detail...
Status: done
2025-12-30
463-KL1
Problem: Monitoring Heating Up
Action: see detail...
Status: done
2025-12-30
BURNER-FLOOR
Problem: Activation panel welding of burner floor
Action: see detail...
Status: done
2025-12-30
463-KL1
Problem: Relocation and replace end point hydraulic cooling fan and blower tyer
Action: see detail...
Status: done
2025-12-30
L63-BF1
Problem: Install Auto Drain
Action: see detail...
Status: done
2025-12-30
443-PH1
Problem: Activation panel welding 8th floor
Action: see detail...
Status: done
2025-12-30
L63-BF1
Problem: observation all solenoid valve and installation of L63 BF1 and check relay
Action: see detail...
Status: done
2025-12-30
ER4
Problem: Prepare Test Drive (Pulling cable ) + Support Instalation
Action: see detail...
Status: done
2025-12-29
463-2K1
Problem: Analyzer Failure (Issue failure of cable)
Action: see detail...
Status: done
2025-12-29
443-2K1
Problem: Prepare instalation analyzer DownComer (New Instalation)
Action: see detail...
Status: done
2025-12-29
363-RM1-&-L63-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-12-29
463-KL1-&-473-CC1
Problem: PMR service critical motor
Action: see detail...
Status: done
2025-12-26
473-FA6
Problem: Issue high up 2gE for FS and LS
Action: see detail...
Status: done
2025-12-26
WORK-SHOP
Problem: Repare thermowell ex 463 KL1 T1
Action: see detail...
Status: done
2025-12-26
WORK-SHOP
Problem: Assembling panel welding area cyclone raw mill
Action: see detail...
Status: done
2025-12-26
HRG-ROOM-
Problem: Clean up area and turn off AC
Action: see detail...
Status: done
2025-12-26
TPM-423-2K1-&-ER3
Problem: Prepare garbage tank 2 color green and yellow of 423 2 K1 & prepare garbage tank 3 color: green - yellow-red of ER3
Action: see detail...
Status: done
2025-12-24
L63-MD1
Problem: Install guarding fan
Action: see detail...
Status: done
2025-12-24
463-2K1
Problem: Issue high O2 reading
Action: see detail...
Status: done
2025-12-24
463-KL1-T1
Problem: Issue reading temperature abnormal
Action: see detail...
Status: done
2025-12-24
WORK-SHOP
Problem: TPM activity form
Action: see detail...
Status: done
2025-12-24
AUTO-DRAIN-OF-CM
Problem: Install cover of solenoid AUTO drain at L63 2K1
Action: see detail...
Status: done
2025-12-24
363-SR1&-363-FN2
Problem: Issue high vibration ( add greasing )
Action: see detail...
Status: done
2025-12-23
IDO-TANK
Problem: IDO pump can not loading diesel to tank
Action: see detail...
Status: done
2025-12-23
ER6-&-ER5
Problem: Cleaning ER NAR 1
Action: see detail...
Status: done
2025-12-23
WORK-SHOP
Problem: Final Drawing 443-2K2 + Drawing Remote VCS RM
Action: see detail...
Status: done
2025-12-23
L1C-TL1
Problem: Activation alarm Ready to Start - Failure
Action: see detail...
Status: done
2025-12-23
363-FN2
Problem: Issue high noise for LS motor
Action: see detail...
Status: done
2025-12-23
L63-RM1
Problem: Issue AUTO drain abnormal
Action: see detail...
Status: done
2025-12-22
TSCANNER
Problem: Issue problem view at CCR
Action: see detail...
Status: done
2025-12-22
CO2-SYSTEM-TANK-
Problem: Observation safety valve CO ( issue energize )
Action: see detail...
Status: done
2025-12-22
L63-BF1
Problem: Observation solenoid purging L63 BF1 issue high draff
Action: see detail...
Status: done
2025-12-22
463-KL1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR Kiln & Cooler 1
Action: see detail...
Status: done
2025-12-22
363-RM1-&-443-PH1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-12-19
T-SCANNER
Problem: Issue problem view at CCR
Action: see detail...
Status: done
2025-12-19
443-2K1
Problem: Prepare Support Cable of 443-2K1
Action: see detail...
Status: done
2025-12-19
WORK-SHOP
Problem: Scanning PMR dan WBI period July-December 2025
Action: see detail...
Status: done
2025-12-18
WORK-SHOP
Problem: Observation recondition motor OH 2026
Action: see detail...
Status: done
2025-12-18
TSCANNER
Problem: Issue error
Action: see detail...
Status: done
2025-12-18
WORK-SHOP
Problem: Fabrication or prepare level sensor L1C TL1
Action: see detail...
Status: done
2025-12-18
WORK-SHOP
Problem: Scanning PMR dan WBI periode July-December 2025
Action: see detail...
Status: done
2025-12-17
SOLAR-TANK
Problem: Check function of sump pump
Action: see detail...
Status: done
2025-12-17
WORK-SHOP
Problem: Observation recondition motor OH 2026
Action: see detail...
Status: done
2025-12-17
473-FA3
Problem: Issue Pressure zero
Action: see detail...
Status: done
2025-12-17
433-FM2
Problem: Issue Error LC
Action: see detail...
Status: done
2025-12-17
WORK-SHOP
Problem: fabrication sensor material level L1C TR1
Action: see detail...
Status: done
2025-12-17
473-CC1-&-483-BL7
Problem: GREASING-MOTOR->-200-KW
Action: see detail...
Status: done
2025-12-17
473-FA6
Problem: Issue high vibration motor at FS and LS
Action: see detail...
Status: done
2025-12-16
443-FN1
Problem: Issue AUTOBALANCER problem
Action: see detail...
Status: done
2025-12-16
ER3
Problem: Observation part needed piping AC robicon ER3 ( compare item number at WH )
Action: see detail...
Status: done
2025-12-16
363-RM1-&-443-PH1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-12-16
463-KL1-&-473-CC1
Problem: PMR service critical motor LSR KL-CM
Action: see detail...
Status: done
2025-12-16
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-12-12
WORK-SHOP
Problem: Observation recondition motor for over haul 2026
Action: see detail...
Status: done
2025-12-12
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-12-12
HRG
Problem: Replace and configuration CCTV at outside of HRG
Action: see detail...
Status: done
2025-12-11
WORK-SHOP
Problem: Setting MICOM with actual temperature
Action: see detail...
Status: done
2025-12-11
HRG-ROOM-
Problem: Cleaning area HRG
Action: see detail...
Status: done
2025-12-11
WORK-SHOP
Problem: Fabrication additional HRG filter
Action: see detail...
Status: done
2025-12-11
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-12-10
363-RM1
Problem: Clean up panel I/O
Action: see detail...
Status: done
2025-12-10
363-FN1-&-363-FN2
Problem: Cleaning motor and filter motor
Action: see detail...
Status: done
2025-12-10
483-PF1
Problem: Panel HMI issue error communication
Action: see detail...
Status: done
2025-12-10
363-MD1
Problem: Cleaning and check motor also CB and connection
Action: see detail...
Status: done
2025-12-10
363-CV1
Problem: Issue oil come to motor check and install oil CPME to motor
Action: see detail...
Status: done
2025-12-15
363-SR1
Problem: Issue high noise 7 gE
Action: see detail...
Status: done
2025-12-09
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-12-09
WORK-SHOP
Problem: Prepare presentation TPM
Action: see detail...
Status: done
2025-12-15
463-KL1-&-BURNER-FLOOR
Problem: Connect welding point
Action: see detail...
Status: done
2025-12-15
413-3B1-&-3B2-&-463-KL1-&-473-CC1-&-443-PH1
Problem: clean up panel I/O
Action: see detail...
Status: done
2025-12-15
443-FN1
Problem: AUTO Balancer support Mr. Eko Juan observation problem
Action: see detail...
Status: done
2025-12-08
WORK-SHOP
Problem: Complete also scan WBI & PMR support for AUDIT
Action: see detail...
Status: done
2025-12-08
443-PH1
Problem: Cross check temperature preheater
Action: see detail...
Status: done
2025-12-08
363-RM1-&-443-PH1
Problem: PMR Service Critical Motor MD + FN (Raw Mill) + check RTD Motor ( special T6 )
Action: see detail...
Status: done
2025-12-08
463-KL1-&-L63-RM1
Problem: PMR Service Critical Motor Kiln + CM
Action: see detail...
Status: done
2025-12-05
WF-LIMESTONE
Problem: Observation issue activation weigh feeder limestone high grade
Action: see detail...
Status: done
2025-12-05
WORK-SHOP
Problem: Prepare Motor Rewinding (Blower Fan)
Action: see detail...
Status: done
2025-12-05
ER#-&-ER4-&-ER5-&-ER6
Problem: Cleaning MCC room
Action: see detail...
Status: done
2025-12-05
L1C-TR1
Problem: Prepare part project CCTV truck lift
Action: see detail...
Status: done
2025-12-05
L1C-TR1
Problem: Reposition probe sensor material level
Action: see detail...
Status: done
2025-12-05
443-EL1
Problem: PMR Serv. Elevator PH NAR1 & WBI Sump El
Action: see detail...
Status: done
2025-12-05
413-3B1&-3B2-&-473-CC1
Problem: WBI Elec & Ins & Check I/O & S Pump Blending and Cooler
Action: see detail...
Status: done
2025-12-04
363-MD1
Problem: PMS Raw Mill
Action: see detail...
Status: done
2025-12-04
WORK-SHOP
Problem: Prepare Motor Blower Rewinding
Action: see detail...
Status: done
2025-12-04
L1C-TR1
Problem: Prepare part project CCTV truck lift
Action: see detail...
Status: done
2025-12-04
L1C-TR1-&-L3C-RE1
Problem: Cleaning panel of coal ( PM )
Action: see detail...
Status: done
2025-12-04
443-PH1-&-463-KL1-
Problem: WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Action: see detail...
Status: done
2025-12-04
363-RM1-&-423-BF1-&-FEED-BIN
Problem: WBI Electric & Ins & Check I/O Feed Bin
Action: see detail...
Status: done
2025-12-03
393-FN3
Problem: Issue motor burned
Action: see detail...
Status: done
2025-12-03
L1C-TR1
Problem: Observation part needed for installation CCTV
Action: see detail...
Status: done
2025-12-03
L1C-TR1
Problem: Install sensor material level and Cleaning radio link and Control
Action: see detail...
Status: done
2025-12-03
463-FX6
Problem: Issue motor burned
Action: see detail...
Status: done
2025-12-01
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-12-01
463-KL1-T1
Problem: Issue reading temperature abnormal
Action: see detail...
Status: done
2025-12-01
463-KL1-&-473-CC1
Problem: PMR Critical Motor Area Kiln
Action: see detail...
Status: done
2025-11-28
363-MD1-&-423-FN1-&-L63-MD1
Problem: Issue high noise information from CBM Mr. Najib
Action: see detail...
Status: done
2025-11-28
443-PH1
Problem: Continue repare lighting lamp area preheater 7th floor
Action: see detail...
Status: done
2025-11-28
WORK-SHOP
Problem: Continue fabrication filter HRG
Action: see detail...
Status: done
2025-11-28
423-FN1
Problem: Support AutoBalancer Test
Action: see detail...
Status: done
2025-11-28
WORK-SHOP
Problem: Complete data check sheet WBI and PMR 2025
Action: see detail...
Status: done
2025-11-27
L1C-TR1
Problem: Prepare CCTV for Truck lift (2 each)
Action: see detail...
Status: done
2025-11-27
443-PH1
Problem: Continue repare lighting lamp area preheater
Action: see detail...
Status: done
2025-11-27
443-FN1
Problem: AutoBalancer Info Error (Check all sensor)
Action: see detail...
Status: done
2025-11-27
393-SG9
Problem: Issue indication abnormal for open and closed
Action: see detail...
Status: done
2025-11-26
ELECTRIC-ROOM
Problem: Inspection electrci room ( make sure there is keys replace if there is no inspection all electric room )
Action: see detail...
Status: done
2025-11-26
L1C-TL1
Problem: Prepare CCTV for Truck lift ( 2 each )
Action: see detail...
Status: done
2025-11-26
443-PH1
Problem: Inspection lighting area 443 PH1 4th floor - 6th- 7th - 8th floor
Action: see detail...
Status: done
2025-11-26
463-2K1-&-443-2K1
Problem: PMR service analyzer also replace 3 way valve
Action: see detail...
Status: done
2025-11-26
423-2K1
Problem: YM CEMS support MCAL
Action: see detail...
Status: done
2025-11-25
423-2K1
Problem: Issue problem at FIDOR
Action: see detail...
Status: done
2025-11-25
363-MD1
Problem: Issue high winding temperature information from CBM Mr. Najib
Action: see detail...
Status: done
2025-11-25
463-MD1
Problem: Issue high noise information from CBM Mr.Najib
Action: see detail...
Status: done
2025-11-25
393-SC3
Problem: Fabrication cable rel and make position of cable and install terminal of 393 SC3 SGD-SGE-SGF
Action: see detail...
Status: done
2025-11-25
WORK-SHOP
Problem: Prepare CCTV for truck lift 2 each
Action: see detail...
Status: done
2025-11-25
463-2K1
Problem: Front Cover probe broken
Action: see detail...
Status: done
2025-11-24
HRG
Problem: Issue pump clorine abnormal function
Action: see detail...
Status: done
2025-11-24
L63-BF1
Problem: Issue leakage compartement 2 & 8
Action: see detail...
Status: done
2025-11-24
363-RM1-L63-CM1-463-KL1-473-CC1
Problem: PMR service critical motor RM-KL-CC
Action: see detail...
Status: done
2025-11-22
393-SC3-&-ER3
Problem: Pulling cable KDRT, also pulling cable SGD - SGE - SGF; fabrication speed motion for 393 SC3; ER3: pulling cable remote VCS, signal S & G
Action: see detail...
Status: done
2025-11-21
33-WF1
Problem: Calibration zero and span
Action: see detail...
Status: done
2025-11-21
363-CV1
Problem: Issue oil come inside motor
Action: see detail...
Status: done
2025-11-21
ER3;-ER4;-ER5;-ER6
Problem: Inspection ALL ER
Action: see detail...
Status: done
2025-11-21
ER3
Problem: Observation extend DI at 363 FN1
Action: see detail...
Status: done
2025-11-21
473-FA1;-473-FA3;-473-FA4;-473-FA6
Problem: Add grease motor issue high noise motor up to 2 gE information from CBM Mr. Najib
Action: see detail...
Status: done
2025-11-21
L1C-TL1
Problem: Repare Short cable
Action: see detail...
Status: done
2025-11-21
L1C-BC1-&-L1C-BC2-&-L1C-BC3
Problem: Repare / instal lighting lamp tail L1C-BC1-3
Action: see detail...
Status: done
2025-11-20
WORK-SHOP
Problem: Complete data check sheet PMR and WBI month of november 2025
Action: see detail...
Status: done
2025-11-20
L1C-TL1
Problem: Trucklift PM ( repair support for LCS BC1-3, observation safety device BD-ML, relocation cable BD of tripper )
Action: see detail...
Status: done
2025-11-19
L1C-BC4
Problem: Replace lighting lamp off
Action: see detail...
Status: done
2025-11-19
483-FN1-M1
Problem: install motor
Action: see detail...
Status: done
2025-11-19
L63-MD1-&-483-BL5-&-493-FN5
Problem: Issue high vibration up 24 mm/s and high noise up 6 gE
Action: see detail...
Status: done
2025-11-19
363-FA2
Problem: V-belt motor are cracked bad condition
Action: see detail...
Status: done
2025-11-18
ANALYZER-ROOM
Problem: Cleaning up room analyzer
Action: see detail...
Status: done
2025-11-18
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-11-18
483-FN1-M1-&-483-FN1-M2
Problem: Issue motor noise for M1 and trip OCR also breaker. Observation motor
Action: see detail...
Status: done
2025-11-17
L1C-TR1
Problem: Resetting position of material level and timer ML from 10 s to 5 s
Action: see detail...
Status: done
2025-11-17
L1C-BC4
Problem: Activated horn at L1C BC4
Action: see detail...
Status: done
2025-11-17
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-11-17
463-KL1-&-L63-RM1
Problem: PMR critical motor area KILN & CM
Action: see detail...
Status: done
2025-11-17
363-RM-&-463-KL1
Problem: PMR critical motor area RM & KILN
Action: see detail...
Status: done
2025-11-14
HRG
Problem: Prepare subtitution and fabrication filter substitution HRG
Action: see detail...
Status: done
2025-11-14
463-KH1-P1
Problem: Issue indication pressure low at operator CCR
Action: see detail...
Status: done
2025-11-14
423-FN1-&-473-FA6
Problem: Issue high noise motor 6.3 gE for 423 FN1 & 13.6 gE also 5.6 gE for 473 FA6
Action: see detail...
Status: done
2025-11-14
WORKSHOP-ELECTRIC-1
Problem: Prepare take plat cable 12 core from NR2
Action: see detail...
Status: done
2025-11-14
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-11-14
483-BL7
Problem: Issue cooling fan off
Action: see detail...
Status: done
2025-11-14
HOIST-L1C-TR1
Problem: Hoist L1C TR1 issue can not start at local ( support for certification hoist by 3rd party )
Action: see detail...
Status: done
2025-11-13
L1C-TR1
Problem: Install senso material level and power supply 220 VAC
Action: see detail...
Status: done
2025-11-13
ER4-&-ER5
Problem: Issue sealing trafo room bad condition information finding from CBM
Action: see detail...
Status: done
2025-11-13
483-BL7
Problem: Issue noise high 5.6 gE and high vibration 4.5 mm/s
Action: see detail...
Status: done
2025-11-13
473-FA6
Problem: Cross check pressure point
Action: see detail...
Status: done
2025-11-13
423-2K1
Problem: CEMS problem board abnormal
Action: see detail...
Status: done
2025-11-13
483-BL7
Problem: Issue noise high 5.6 gE and vibration 4.5 mm/s
Action: see detail...
Status: done
2025-11-12
473-SC3
Problem: Issue pulse motion bad condition
Action: see detail...
Status: done
2025-11-12
WORK-SHOP
Problem: Complete data check sheet report PMR and WBI month november 2025
Action: see detail...
Status: done
2025-11-12
393-CP1
Problem: Install lighting lamp
Action: see detail...
Status: done
2025-11-12
463-KL1-&-473-CC1
Problem: Continue PMR service critical motor are KL & CM
Action: see detail...
Status: done
2025-11-12
L63-BF1
Problem: Issue problem at compartemen 4 & compartemen 11
Action: see detail...
Status: done
2025-11-11
HRG
Problem: Issue chiller problem
Action: see detail...
Status: done
2025-11-11
363-RM1-&-463-KL1
Problem: PMR Service Critical Motor & LSR RM & CM1 & KL
Action: see detail...
Status: done
2025-11-10
L1C-TR1
Problem: Continue pending Job
Action: see detail...
Status: done
2025-11-10
L63-BF1
Problem: Issue compartemen 10 Abnormal
Action: see detail...
Status: done
2025-11-10
MAIN-GATE-ACCES-CONTROL
Problem: Inspection welding and electrical tools of PT Indoporlen and PT RMP
Action: see detail...
Status: done
2025-11-07
473-GQ1
Problem: Prepare fabrication re-position Sensor Pressure 473-GQ1
Action: see detail...
Status: done
2025-11-07
363-RM1-&-463-KL1-&-L63-RM1
Problem: WBI Switchgear, Cap & Trafo RM, KL & CM1
Action: see detail...
Status: done
2025-11-07
BOTTOME-BLENDING--473-CC1-493-3S1
Problem: WBI Elec & Ins & Check I/O & S Pump Bl,C
Action: see detail...
Status: done
2025-11-07
PPUP-WORKSHOP
Problem: Check Tools Area PPUP
Action: see detail...
Status: done
2025-11-06
L1C-TR1
Problem: Issue for L1C BC6 can not start and tidy up cable PLC
Action: see detail...
Status: done
2025-11-06
473-FA4
Problem: Issue indication abnormal
Action: see detail...
Status: done
2025-11-05
L1C-TR1
Problem: Continue Project L1C-TR1
Action: see detail...
Status: done
2025-11-04
L1C-TR1
Problem: PROJECT L1C-TR1
Action: see detail...
Status: done
2025-11-04
363-BF1
Problem: Issue purging abnormal
Action: see detail...
Status: done
2025-11-03
HRG
Problem: Replace clorine pump issue pump performance pump already decrase
Action: see detail...
Status: done
2025-11-03
363-RM1
Problem: Indication temperature outlet fluctuation
Action: see detail...
Status: done
2025-11-03
WORK-SHOP
Problem: Final Drawing Upgrade L1C-TR1
Action: see detail...
Status: done
2025-11-03
363-RM1-&-463-KL1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-11-03
463-KL1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR Kiln & Cooler 1
Action: see detail...
Status: done
2025-11-03
L93-3S1
Problem: Issue Temp Bottom Bin increase- Check Solenoid Purging
Action: see detail...
Status: done
2025-10-31
363-MD1
Problem: 363 MD1 check - clean up - replace carbon brush
Action: see detail...
Status: done
2025-10-31
Y43-1G1
Problem: Service / replace pump antscalant
Action: see detail...
Status: done
2025-10-31
463-2K1
Problem: IKGA probe Support
Action: see detail...
Status: done
2025-10-31
ER6
Problem: Labelling cable ER6 - Tripper (L1C-TR1) + scun cable
Action: see detail...
Status: done
2025-10-30
L1C-TR1
Problem: Observation add 3 Modul DO PLC
Action: see detail...
Status: done
2025-10-29
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-29
423-BF1
Problem: Install lighting lamp
Action: see detail...
Status: done
2025-10-29
WORK-SHOP
Problem: Completing data PMR and WBI month october 2025
Action: see detail...
Status: done
2025-10-29
443-EL1
Problem: lighting lamp inside elevator room off
Action: see detail...
Status: done
2025-10-29
ER5
Problem: Lighting lamp issue off at ER5 outside
Action: see detail...
Status: done
2025-10-28
KILN-SCANNER
Problem: Kiln Scanner (View Abnormal)
Action: see detail...
Status: done
2025-10-28
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM & CM1
Action: see detail...
Status: done
2025-10-28
BURNER-FLOOR
Problem: Connect Motor Hoist Area Burner
Action: see detail...
Status: done
2025-10-28
363-SR1
Problem: Cleaning Finishing room trafo 363-SR1
Action: see detail...
Status: done
2025-10-28
L63-BF1
Problem: Solenoid compartement 8 issue purging but no air supply
Action: see detail...
Status: done
2025-10-28
WORK-SHOP
Problem: Complete check sheet PMR or WBI month of october 2025
Action: see detail...
Status: done
2025-10-27
463-2K1
Problem: fabrication and installation rel also rooler
Action: see detail...
Status: done
2025-10-27
363-SR1
Problem: Cleaning trafo room 363-SR 1
Action: see detail...
Status: done
2025-10-24
WORK-SHOP
Problem: Wiring panel welding of burner floor
Action: see detail...
Status: done
2025-10-24
423-BF1
Problem: Pulling cable power solenoid valve and install solenoid valve 2 groups
Action: see detail...
Status: done
2025-10-24
423-2K1-GEMBA-TPM-
Problem: Clean up area outside CEMS shelter
Action: see detail...
Status: done
2025-10-23
L63-MD1
Problem: Pulling cable power at L63-MD1
Action: see detail...
Status: done
2025-10-23
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-23
ER6-&-ER5
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-10-23
443-PH1-&-473-FA3
Problem: Install lighting lamp 4th floor 443 PH1 and fix also dismantling stop contact area cooler ex 473 FA3
Action: see detail...
Status: done
2025-10-22
WORK-SHOP
Problem: Sort it out and 5R part work shop
Action: see detail...
Status: done
2025-10-22
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-22
423-2K1
Problem: Support Yearly Maintenance CEMS
Action: see detail...
Status: done
2025-10-21
HRG
Problem: Lamp of HRG blinking
Action: see detail...
Status: done
2025-10-21
443-PH1
Problem: IR TAD issue indication temperature low
Action: see detail...
Status: done
2025-10-21
493-AC1
Problem: Prepare and connection welding point burner
Action: see detail...
Status: done
2025-10-21
423-2K1
Problem: YM CEMS
Action: see detail...
Status: done
2025-10-21
HRG
Problem: Failure start
Action: see detail...
Status: done
2025-10-20
463-KL1
Problem: Observation instalation blower sheel kiln
Action: see detail...
Status: done
2025-10-20
463-KL1-&--L63-RM1
Problem: PMR Service Critical Motor area Kiln & CM1
Action: see detail...
Status: done
2025-10-20
363-RM1-&-443-PH1
Problem: PMR Service Critical Motor area RM
Action: see detail...
Status: done
2025-10-18
443-PH1-;-473-CC1;-L63-RM1;-FEED-BIN
Problem: Clean panel I/O
Action: see detail...
Status: done
2025-10-18
473-FA3
Problem: Pulling cable motor from local to ER5
Action: see detail...
Status: done
2025-10-17
493-AC2
Problem: Prepare & Pulling Cable welding point Cooler
Action: see detail...
Status: done
2025-10-17
393-SC3
Problem: Installation and wiring 393-SC3 ( MCC part + LCS+ Motion )
Action: see detail...
Status: done
2025-10-17
423-2K1
Problem: TPM Area CEMS
Action: see detail...
Status: done
2025-10-16
493-AC2
Problem: Relocation welding point
Action: see detail...
Status: done
2025-10-16
493-3B1
Problem: Check Greasing and Cleaning Area Clinker Silo
Action: see detail...
Status: done
2025-10-16
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-16
CIVIL-BUILDING-WORKSHOP
Problem: Inspection electrical and welding tools of Civil Building
Action: see detail...
Status: done
2025-10-15
493-AC2
Problem: Observation cable welding point area 493 AC2 and planning tap power
Action: see detail...
Status: done
2025-10-15
393-SC3-&-3-SG
Problem: Prepare part needed for new installation 393-SC3 + 3 Slide Gate (MCC part + LCS+ Motion)
Action: see detail...
Status: done
2025-10-15
L1C-TR1
Problem: Cleaning Area L1C-TR1 (MCC + Radio Link)
Action: see detail...
Status: done
2025-10-15
WORK-SHOP
Problem: Finishing Fabrication I/O additional 2nd floor
Action: see detail...
Status: done
2025-10-15
CIVIL-BUILDING-WORKSHOP
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-10-14
393-SC3-&-3-SG
Problem: Observation part needed new installation 393 SC3 and 3 slide gate
Action: see detail...
Status: done
2025-10-14
443-PH1
Problem: Fabrication I/O additional 2nd floor
Action: see detail...
Status: done
2025-10-14
PT-TRUBA-JAGA-CITA
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-10-13
473-CC1
Problem: 473 FA Cooler refill easylube + greasing
Action: see detail...
Status: done
2025-10-13
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-13
393-BF3
Problem: Replace & Service PLC
Action: see detail...
Status: done
2025-10-13
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM & CM1
Action: see detail...
Status: done
2025-10-10
363-RM1
Problem: Measure mV OZD
Action: see detail...
Status: done
2025-10-10
363-MD1-&-363-FN1
Problem: Check and cleaning carbon brush
Action: see detail...
Status: done
2025-10-09
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-10-09
443-PH1
Problem: Observation power pump fire protection 5th floor
Action: see detail...
Status: done
2025-10-09
WORK-SHOP
Problem: Continue fabrication Welding Point
Action: see detail...
Status: done
2025-10-09
393-FA3
Problem: Observation cable signal S-G Observation cable signal S-G
Action: see detail...
Status: done
2025-10-08
483-BL1
Problem: Replace Handle LCS failure
Action: see detail...
Status: done
2025-10-08
PT-PINCURAN-MAS
Problem: Check Tool Pincuran Work Shop
Action: see detail...
Status: done
2025-10-07
443-PH1
Problem: Repare Welding Point 6th floor and dismantling Box ( ex-cable sensor 7th floor)
Action: see detail...
Status: done
2025-10-07
ER4
Problem: Istall platform bottom ER4
Action: see detail...
Status: done
2025-10-07
L63-RF1
Problem: Reposition speed sensor
Action: see detail...
Status: done
2025-10-07
HRG
Problem: Repare Emergency Door HRG-WTP
Action: see detail...
Status: done
2025-10-07
443-EL1
Problem: PMR Serv. Elevator PH NAR1 & WBI Sump El
Action: see detail...
Status: done
2025-10-07
443-PH1;-L63-RM1;-463-KL1
Problem: PMR CCTV, IR TAD & Kiln Scanner
Action: see detail...
Status: done
2025-10-06
L63-MD-&-453-BL1-&-483-BL5-&-483-BL9
Problem: Add greasing motor for FS and LS
Action: see detail...
Status: done
2025-10-06
WORK-SHOP
Problem: Fabrication plat form at bottom ER4
Action: see detail...
Status: done
2025-10-06
L63-BF1
Problem: Compartement 1 south side leakage
Action: see detail...
Status: done
2025-10-06
463-KL1
Problem: PMR Critical motor Area Kiln
Action: see detail...
Status: done
2025-10-06
363-RM1
Problem: PMR Critical motor Area RM
Action: see detail...
Status: done
2025-10-03
423-FN1-&-CEMS-ROOM-&-ER3
Problem: TPM Area 423 FN1 & CEMS Room & ER3
Action: see detail...
Status: done
2025-10-03
WORK-SHOP
Problem: Fabrication plat form at bottom ER4
Action: see detail...
Status: done
2025-10-03
393-RF6
Problem: Install Motor
Action: see detail...
Status: done
2025-10-03
393-SC1
Problem: Issue motor oil gear leakage
Action: see detail...
Status: done
2025-10-02
393-SC1
Problem: Check motor oil gear leakage
Action: see detail...
Status: done
2025-10-02
BURNER-FLOOR
Problem: Lighting burner check and install new lighting
Action: see detail...
Status: done
2025-10-02
WORK-SHOP
Problem: Continue fabrication plat form at bottom ER4
Action: see detail...
Status: done
2025-10-02
L63-BF1
Problem: Check purging not function
Action: see detail...
Status: done
2025-10-02
443-PH1;-L63-RM1;-463-KL1
Problem: PMR IR TAD- T Scanner- CCTV - Camera Burner
Action: see detail...
Status: done
2025-10-01
WORK-SHOP
Problem: Fabrication plat form at bottom ER4
Action: see detail...
Status: done
2025-10-01
WORK-SHOP
Problem: Continue TPM report FI
Action: see detail...
Status: done
2025-10-01
ANALYZER-ROOM
Problem: Clean up area analyzer room
Action: see detail...
Status: done
2025-10-01
BURNER-FLOOR-AND-CLINKER-SILO
Problem: WBI hoist and crane
Action: see detail...
Status: done
2025-10-01
473-CC1
Problem: Observation area cooler ( issue Ground F ) from M33-WP4 with measurement result normal related other suspected
Action: see detail...
Status: done
2025-09-30
393-FN3
Problem: Signal cable S I/O is failure
Action: see detail...
Status: done
2025-09-30
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-09-30
463-KL1-AND-BURNER-FLOOR
Problem: Continue relocation welding point and prepare cable connection burner point + Kiln
Action: see detail...
Status: done
2025-09-30
443-FN1
Problem: Replace sensor vibration with IFM
Action: see detail...
Status: done
2025-09-29
463-KL1-AND-BURNER-FLOOR
Problem: Continue relocation welding point and prepare cable connection burner point and Kiln
Action: see detail...
Status: done
2025-09-29
363-RM1-&-463-KL1
Problem: PMR Service Critical Motor & LSR RM & CM1
Action: see detail...
Status: done
2025-09-29
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-09-29
WORK-SHOP
Problem: Report also complete PMR and WBI September 2025
Action: see detail...
Status: done
2025-09-29
ER4
Problem: TPM ER4 repainting green color for floor
Action: see detail...
Status: done
2025-09-26
WORK-SHOP
Problem: Complete data check sheet PMR and WBI month of september 2025
Action: see detail...
Status: done
2025-09-26
ER4
Problem: Gemba TPM ER4
Action: see detail...
Status: done
2025-09-26
ELGA-2
Problem: Observation leaked ELGA 2
Action: see detail...
Status: done
2025-09-26
WORK-SHOP
Problem: Continue observation and wiring project L1C-TR1
Action: see detail...
Status: done
2025-09-26
BURNER-FLOOR
Problem: Continue relocation welding point and prepare cable connection burner point
Action: see detail...
Status: done
2025-09-26
ER4
Problem: Gemba TPM ER4
Action: see detail...
Status: done
2025-09-25
463-KL1
Problem: Continue Welding Point + put panel welding near 463 MD1 + Prepare Cable connection
Action: see detail...
Status: done
2025-09-25
L1C-TR1
Problem: Continue observation and wiring project L1C-TR1
Action: see detail...
Status: done
2025-09-25
WORK-SHOP
Problem: Complete data check sheet PMR and WBI month of september 2025
Action: see detail...
Status: done
2025-09-25
WORK-SHOP
Problem: Upload description L1C-TR1
Action: see detail...
Status: done
2025-09-24
CLINKER-SILO
Problem: Check + Add greasing + Clean up Motor Area Clinker
Action: see detail...
Status: done
2025-09-24
L63-RM1
Problem: PMR service analyser
Action: see detail...
Status: done
2025-09-24
473-FN7
Problem: Support take motor 473-FN7 from vendor
Action: see detail...
Status: done
2025-09-24
423-2K1
Problem: PMR analyzer CEMS
Action: see detail...
Status: done
2025-09-24
L1C-TR1
Problem: Continue observation and wiring project L1C-TR1
Action: see detail...
Status: done
2025-09-23
L1C-TR1
Problem: Continue Observation Project L1C-TR1
Action: see detail...
Status: done
2025-09-23
WORK-SHOP-&-463-KL1
Problem: Fabrication support lamp + Welding panel and install lighting lamp area kiln
Action: see detail...
Status: done
2025-09-23
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-09-22
WORK-SHOP
Problem: Continue wiring control Radio Link
Action: see detail...
Status: done
2025-09-22
463-KL1
Problem: Observation replacement lamp without cover area kiln
Action: see detail...
Status: done
2025-09-22
463-KL1-&-473-CC1
Problem: PMR Critical motor Kiln and Cooler
Action: see detail...
Status: done
2025-09-22
363-RM1-&-L63-RM1
Problem: PMR Critical motor Raw Mill and Coal Mill
Action: see detail...
Status: done
2025-09-22
L3A-BC1
Problem: Lighting lamp off 2 each
Action: see detail...
Status: done
2025-09-20
L1C-TR1
Problem: Pulling cable 6P x 1.5 mm 3 line from tripper to I/O ER6
Action: see detail...
Status: done
2025-09-19
IDO-TANK
Problem: Instalation pump
Action: see detail...
Status: done
2025-09-19
WORK-SHOP
Problem: Prepare + Wiring RD for L1C-TR1
Action: see detail...
Status: done
2025-09-19
WORK-SHOP
Problem: Install Support Welding point
Action: see detail...
Status: done
2025-09-19
L1C-TR1
Problem: Obsevation / prepare for pulling cable
Action: see detail...
Status: done
2025-09-18
443-PH1-CYCLONE-4
Problem: Add tubing cone C4A
Action: see detail...
Status: done
2025-09-18
ER3-&-ER4-
Problem: PMR Clean Up MCC ER
Action: see detail...
Status: done
2025-09-18
393-FV9
Problem: Check / install double tipping valve new control
Action: see detail...
Status: done
2025-09-17
473-HC1
Problem: Service pipe lighting back of HC
Action: see detail...
Status: done
2025-09-17
473-GQ1
Problem: Install lighting lamp north side
Action: see detail...
Status: done
2025-09-17
WORK-SHOP
Problem: Prepare box and PS 12 VDC 20A
Action: see detail...
Status: done
2025-09-17
463-2K1-&-443-2K1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-09-16
363-MD1
Problem: Clean up and check carbon brush
Action: see detail...
Status: done
2025-09-16
363-SR1
Problem: Observation cracked at base plate motor
Action: see detail...
Status: done
2025-09-16
WORK-SHOP
Problem: Closing WO Electric 1
Action: see detail...
Status: done
2025-09-16
L63-RM1-&-L1C-TR1-&-L1C-TL1
Problem: WBI Elect & Ins & Check I/O CM, Sump T&T
Action: see detail...
Status: done
2025-09-16
483-BL7-AND-473-FA2
Problem: Install lighting lamp
Action: see detail...
Status: done
2025-09-16
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-09-15
483-BL5
Problem: Replace Motor & Cek Structure P
Action: see detail...
Status: done
2025-09-15
L1C-TR1
Problem: Re-check cycle mode and survey way pulling cable
Action: see detail...
Status: done
2025-09-15
L63-MD1
Problem: Greasing bearing motor LS
Action: see detail...
Status: done
2025-09-15
483-FN1
Problem: Check recondition motor
Action: see detail...
Status: done
2025-09-15
393-RF6
Problem: Service speed motor
Action: see detail...
Status: done
2025-09-15
363-RM1-L63-CM1-463-KL1-473-CC1
Problem: PMR Service Critical Motor & LSR
Action: see detail...
Status: done
2025-09-12
WORK-SHOP
Problem: Install motor CKD test run motor
Action: see detail...
Status: done
2025-09-12
L63-MD1
Problem: Observation heat at winding
Action: see detail...
Status: done
2025-09-12
L3C-TR1
Problem: Prepare Cable (6P x 1,5 mm) for project tripper
Action: see detail...
Status: done
2025-09-12
463-2K1-&-443-2K1
Problem: PMR Analizer IKGA & Pre heater
Action: see detail...
Status: done
2025-09-12
WORK-SHOP
Problem: Update wiring L1C-TR1
Action: see detail...
Status: done
2025-09-11
WORK-SHOP
Problem: Replace bearing motor CKD
Action: see detail...
Status: done
2025-09-11
WORK-SHOP
Problem: Prepare Audit Safety (SWP-HIRAC)
Action: see detail...
Status: done
2025-09-11
PANEL-INPUT-OUTPUT
Problem: Repare handle I/O fail
Action: see detail...
Status: done
2025-09-11
PANEL-INPUT-OUTPUT
Problem: Replace CI830 to CI801
Action: see detail...
Status: done
2025-09-11
473-FN4
Problem: Test run after re-position blade
Action: see detail...
Status: done
2025-09-11
HRG
Problem: Replace pump of HRG
Action: see detail...
Status: done
2025-09-11
PLANT-NR1
Problem: Support area NAR1 and concern feeding
Action: see detail...
Status: done
2025-09-10
443-BE1
Problem: Replace limit switch of bottom side for L2 and issue speed failure
Action: see detail...
Status: done
2025-09-10
443-PH1-WINCI-8THFLOOR
Problem: Decrease break
Action: see detail...
Status: done
2025-09-10
443-Z2B-P1-&-443-Z4A-&-443-Z4B-
Problem: Repare tubing and extend pipe draft
Action: see detail...
Status: done
2025-09-10
483-BF1
Problem: Replace membran 6 each
Action: see detail...
Status: done
2025-09-10
473-FN4
Problem: Test Run
Action: see detail...
Status: done
2025-09-10
PINCURAN-MAS-WORK-SHOP
Problem: Inspection electrical and welding
Action: see detail...
Status: done
2025-09-09
WORK-SHOP
Problem: Inspection electrical tools of PT Pincuran Mas
Action: see detail...
Status: done
2025-09-09
WORK-SHOP
Problem: Complete check sheet PMR & WBI for 1st week of september 2025
Action: see detail...
Status: done
2025-09-09
CKD
Problem: Check and service motor CKD
Action: see detail...
Status: done
2025-09-09
483-FN1
Problem: Install motor, check function motor and bag filter
Action: see detail...
Status: done
2025-09-08
L1C-TR1
Problem: issue can not AUTO
Action: see detail...
Status: done
2025-09-08
483-FN1
Problem: Issue motor noise
Action: see detail...
Status: done
2025-09-08
L63-RM1-&-473-CC1
Problem: Clean up panel I/O
Action: see detail...
Status: done
2025-09-05
CKD
Problem: Issue motor burned at hoist
Action: see detail...
Status: done
2025-09-05
ER4
Problem: Install Battery UPS
Action: see detail...
Status: done
2025-09-05
ER3
Problem: Pulling cable data 6P x 0.75 x 3 ER 3 ( @25m ) + Install Module DI
Action: see detail...
Status: done
2025-09-05
ER3-&-ER4-&-ER5
Problem: Manuver Power ( format and procedure same with 1st manuver)
Action: see detail...
Status: done
2025-09-04
L63-RM1-&-ER4
Problem: Pulling cable Sensor Winding (L63-MD1 --- ER5) 2 X 6P X0,75 mm ( @70 m)
Action: see detail...
Status: done
2025-09-04
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-09-04
AUTOMATION-NL1.1.2-&-3
Problem: Replace PS dan CI830, di NL1.1. 3 , add module AI830
Action: see detail...
Status: done
2025-09-04
463-MD1
Problem: Observation / Replace CB
Action: see detail...
Status: done
2025-09-03
BLENDING-SILO-&-FEED-BIN-&-PH-&-CM
Problem: Cleaning panel I/O
Action: see detail...
Status: done
2025-09-03
PANEL-I_O-AREA-N41-&-N31
Problem: Replace CI 801 --2 Each di N31 + Replace Modul IO di N41 Bus A
Action: see detail...
Status: done
2025-09-03
483-BL5
Problem: Prepare & Replace Motor
Action: see detail...
Status: done
2025-09-03
ER3-&-ER4-&-ER5
Problem: Manuver Black Out
Action: see detail...
Status: done
2025-09-02
WORK-SHOP
Problem: Data spare part work shop electric1 ( Choose spare part for CEMS and MC )
Action: see detail...
Status: done
2025-09-02
L1C-TR1
Problem: Final Elec Drawing + observation posibility pulling cable L1C TR1 to ER6
Action: see detail...
Status: done
2025-09-02
L63-RM1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-09-02
463-2K1-&-443-2K1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-09-01
WORK-SHOP
Problem: Data spare part work shop electric 1
Action: see detail...
Status: done
2025-09-01
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
Problem: PMR critical motor
Action: see detail...
Status: done
2025-09-01
L1C-TR1
Problem: Motor Travel Brake failure
Action: see detail...
Status: done
2025-09-01
WORK-SHOP
Problem: Complete data TPM
Action: see detail...
Status: done
2025-08-29
L63-RM1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-08-29
ER6
Problem: Continue Project L1C-TR1 (Labeling SX, MS, MX) + Test signal
Action: see detail...
Status: done
2025-08-29
ER3-&-ER4-
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-08-29
WORK-SHOP
Problem: Data spare part work shop electric 1 + complete data check sheet PMR and WBI month of August 2025, template TPM ER4 for safety
Action: see detail...
Status: done
2025-08-28
WORK-SHOP
Problem: Data spare part work shop electric 1 + complete data check sheet PMR and WBI month of August 2025
Action: see detail...
Status: done
2025-08-28
WORK-SHOP
Problem: Continue Cover motor Area 393
Action: see detail...
Status: done
2025-08-28
ER6
Problem: Continue Project L1C-TR1 (Labeling SX, MS, MX)
Action: see detail...
Status: done
2025-08-28
463-2K1-&-443-2K1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-08-27
WORK-SHOP
Problem: Data spare part work shop electric 1
Action: see detail...
Status: done
2025-08-26
HRG
Problem: Y43-1G1 HRG ELGA 2 Abnormal
Action: see detail...
Status: done
2025-08-26
393-BE1-& 433 BE1
Problem: Replace battery AUTO Grease
Action: see detail...
Status: done
2025-08-27
ER6
Problem: Continue Project L1C-TR1
Action: see detail...
Status: done
2025-08-27
L1C-BC6-
Problem: Install lighting lamp at tail pulley
Action: see detail...
Status: done
2025-08-27
WORK-SHOP
Problem: Check Motor Bogie (Replace Bearing) for L1C-RE1,
Action: see detail...
Status: done
2025-08-26
WORK-SHOP
Problem: Data spare part work shop electric 1
Action: see detail...
Status: done
2025-08-26
TPM-ER4
Problem: Install sign safety and cleaning tool
Action: see detail...
Status: done
2025-08-26
WORK-SHOP
Problem: Prepare Cover Motor Area 393
Action: see detail...
Status: done
2025-08-26
443-2K1
Problem: Relay Purging Probe 1 abnormal
Action: see detail...
Status: done
2025-08-26
443-PH1-8TH-FLOOR
Problem: Washer Motor can not start
Action: see detail...
Status: done
2025-08-26
AREA-DRIVE-NORTH-SIDE
Problem: Repare lighting lamp off
Action: see detail...
Status: done
2025-08-25
L63-FN1
Problem: Issue reading high vibration
Action: see detail...
Status: done
2025-08-25
WORK-SHOP
Problem: Data spare part work shop electric 1
Action: see detail...
Status: done
2025-08-25
363-RM1-&-463-KL1
Problem: PMR Service Critical Motor Area RM dan KL
Action: see detail...
Status: done
2025-08-25
443-2K1
Problem: Check Service analyser
Action: see detail...
Status: done
2025-08-25
HRG-&-ER6
Problem: Observation all safety device
Action: see detail...
Status: done
2025-08-25
363-RM1-&-463-KL1
Problem: PMR Service Critical Motor Area RM dan KL
Action: see detail...
Status: done
2025-08-22
393-SCB
Problem: Resetting PPM at miltronic card
Action: see detail...
Status: done
2025-08-22
WORK-SHOP-&-L1C-TR1
Problem: Prepare Print HAC L1C-TR1
Action: see detail...
Status: done
2025-08-22
WORK-SHOP
Problem: Fabrication 4 Motor Cover Area 393-RF1
Action: see detail...
Status: done
2025-08-22
463-2K1
Problem: indication O2 often spike at10 minutes
Action: see detail...
Status: done
2025-08-22
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-22
ER4
Problem: GEMBA TPM ER4
Action: see detail...
Status: done
2025-08-21
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-21
WORK-SHOP
Problem: List comsumable part (Item number )
Action: see detail...
Status: done
2025-08-21
393-SCB
Problem: info often speed failure
Action: see detail...
Status: done
2025-08-21
L33-BF1
Problem: Service indication local stop
Action: see detail...
Status: done
2025-08-21
L63-RM1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-08-20
WORK-SHOP
Problem: Data spare part electric, safe file at PC
Action: see detail...
Status: done
2025-08-20
L1C-BC5-&-RADIO-LINK
Problem: Top Up grease + Cleaning Up control and Radio Link
Action: see detail...
Status: done
2025-08-20
WORK-SHOP
Problem: Fabrication LCS L1C-BC1-3 + accecories
Action: see detail...
Status: done
2025-08-20
463-2K1-&-443-2K1
Problem: PMR Service analyser
Action: see detail...
Status: done
2025-08-19
L1C-BC4
Problem: Lighting lamp head pulley off
Action: see detail...
Status: done
2025-08-19
363-FA2
Problem: Cooling Fan often failure
Action: see detail...
Status: done
2025-08-19
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-08-18
463-KL1-&-473-CC1
Problem: PMR Service Critical Motor KL and Cooler
Action: see detail...
Status: done
2025-08-18
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor
Action: see detail...
Status: done
2025-08-16
L1C-TL1
Problem: Pulling cable 6P around 100m
Action: see detail...
Status: done
2025-08-15
363-MD1
Problem: Replace CB no12 and cleaning area motor
Action: see detail...
Status: done
2025-08-15
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-15
ER3-&-423-BF1-M1
Problem: Dismantling Battery EX ER3 UPS + Cleaning Motor Area 423-BF1
Action: see detail...
Status: done
2025-08-15
L1C-TR1
Problem: Make sure signal Tonase Pulse + Total tonase+ Upload HMI to Factory talk
Action: see detail...
Status: done
2025-08-15
WORK-SHOP
Problem: Drawing Electrical Truck lift
Action: see detail...
Status: done
2025-08-15
FEED-BIN
Problem: WBI FEED-BINC-363-RM1--443-CT1-DUST-TRANSPORT--BAG-FILTER and cleaning I/O modul
Action: see detail...
Status: done
2025-08-14
L3C-TL1
Problem: Observation installation Sensor VEGA + Pulling cable at truck lift
Action: see detail...
Status: done
2025-08-14
HEAT-EXCHANGER
Problem: Prepare cable + Support Welding point Heat Exchanger
Action: see detail...
Status: done
2025-08-14
WORK-SHOP
Problem: Drawing Electrical Truck lift
Action: see detail...
Status: done
2025-08-14
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-13
L63-RM1
Problem: PMR Service Analyser Coal Mill
Action: see detail...
Status: done
2025-08-13
HEAT-EXCHANGER
Problem: Prepare cable + Support Welding point Heat Exchanger
Action: see detail...
Status: done
2025-08-13
WORK-SHOP
Problem: Drawing Electrical Truck lift
Action: see detail...
Status: done
2025-08-13
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-08-12
HEAT-EXCHANGER
Problem: Prepare cable Welding Heat Exchanger
Action: see detail...
Status: done
2025-08-12
WORK-SHOP
Problem: Drawing Electrical Truck lift
Action: see detail...
Status: done
2025-08-12
473-CC1-CYCLONE-AREA
Problem: Cleaning Motor
Action: see detail...
Status: done
2025-08-12
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-08-12
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-11
WORK-SHOP
Problem: Drawing Electrical Truck lift
Action: see detail...
Status: done
2025-08-11
BELT-FEED
Problem: Autodrain Belt Feed is not function
Action: see detail...
Status: done
2025-08-11
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
Problem: PMR Service Critical Motor Area KL dan RM
Action: see detail...
Status: done
2025-08-11
WORK-SHOP
Problem: Data spare part and safe file at PC
Action: see detail...
Status: done
2025-08-08
L3C-TL1
Problem: Prepare cable ER 6 support Automation Truck lift
Action: see detail...
Status: done
2025-08-08
HEAT-EXCHANGER
Problem: Install Welding point di Heat Exchanger ( 2nd floor )
Action: see detail...
Status: done
2025-08-08
WORK-SHOP
Problem: Data spare part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-08-08
ER3-&-ER4-
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-08-07
WORK-SHOP
Problem: Data spare part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-08-07
HEAT-EXCHANGER
Problem: Prepare Welding point Heat Exchanger
Action: see detail...
Status: done
2025-08-07
BAC-ROOM
Problem: Install final conection support Welding BAC
Action: see detail...
Status: done
2025-08-07
ER5-&-ER6
Problem: PMR Clean Up MCC ER All Area Kiln Nar1 (ER6 & ER5 top also bottom)
Action: see detail...
Status: done
2025-08-07
WORK-SHOP
Problem: Inspection electrical tools of PT AAS
Action: see detail...
Status: done
2025-08-06
WORK-SHOP
Problem: 363 BE1 & 363 FN3 make canopy motor
Action: see detail...
Status: done
2025-08-06
443-W1-M3
Problem: Issue bearing motor bad condition or noise
Action: see detail...
Status: done
2025-08-06
BAC-ROOM
Problem: Fabrication support rail mount BAC + Install Box Welding
Action: see detail...
Status: done
2025-08-06
L3C-RE1
Problem: L3C RE1 clean up panel control and I/O panel
Action: see detail...
Status: done
2025-08-06
WORK-SHOP
Problem: Prepare Welding Point (Heat Exchanger )
Action: see detail...
Status: done
2025-08-06
MOTOR-INJECTION
Problem: Lighting lamp at motor injection off
Action: see detail...
Status: done
2025-08-06
463-2K1-&-443-2K1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-08-05
WORK-SHOP
Problem: Fabrication support rail mount BAC
Action: see detail...
Status: done
2025-08-05
HEAT-EXCHANGER
Problem: Prepare Box Welding point
Action: see detail...
Status: done
2025-08-05
423-2K1
Problem: PMR Service CEMS + CGA
Action: see detail...
Status: done
2025-08-05
L63-RM1
Problem: PMR Analyzer Coal Mill
Action: see detail...
Status: done
2025-08-04
WORK-SHOP
Problem: Fabrication support rail mount BAC
Action: see detail...
Status: done
2025-08-04
WORK-SHOP
Problem: Collective Wiring , Truck lift (PLC), Tripper , Re-wiring
Action: see detail...
Status: done
2025-08-04
363-RM1-&-463-KL1
Problem: PMR Critical Motor RM dan Kiln
Action: see detail...
Status: done
2025-08-04
423-2K1
Problem: CEMS issue problem at MCS 100E
Action: see detail...
Status: done
2025-08-04
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC + Scanning for PMR also WBI month of July 2025
Action: see detail...
Status: done
2025-08-02
ER6
Problem: Pulling cable power for panel welding BAC
Action: see detail...
Status: done
2025-08-02
L1C-TL1
Problem: Issue radio link problem
Action: see detail...
Status: done
2025-08-02
473-FN4
Problem: Replace motor-wiring, install taper lock, pulley
Action: see detail...
Status: done
2025-08-02
473-FN4
Problem: Replace motor-wiring, install taper lock, pulley
Action: see detail...
Status: done
2025-08-02
L1C-TL1
Problem: Issue radio link problem
Action: see detail...
Status: done
2025-08-01
L3C-RE1
Problem: Motor Bogie run one side
Action: see detail...
Status: done
2025-08-01
473-CC1
Problem: Stop Contact failure (Area Cooller) + lighting lamp off
Action: see detail...
Status: done
2025-08-01
473-FA4
Problem: Fabrication / prepare lifting motor
Action: see detail...
Status: done
2025-08-01
493-AC2
Problem: Issue speed Motion (fabrication sensor propeller motion)
Action: see detail...
Status: done
2025-08-01
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-31
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC + Scanning for June 2025
Action: see detail...
Status: done
2025-07-31
L63-RM1
Problem: PMR Analyzer Coal Mill
Action: see detail...
Status: done
2025-07-31
HRG
Problem: Install Motor Circulation
Action: see detail...
Status: done
2025-07-31
473-CC1
Problem: Check ALL Greasing Area Cooller
Action: see detail...
Status: done
2025-07-31
363-FN2
Problem: Install Auto Greasing
Action: see detail...
Status: done
2025-07-30
363-FN1
Problem: PM 363-FN1, Issue Hot Bearing Motor
Action: see detail...
Status: done
2025-07-30
493-AC2-&-493-AC3
Problem: Install Greasing + Cleaning Motor
Action: see detail...
Status: done
2025-07-30
363-RM1
Problem: Cleaning ALL IO Raw Mill
Action: see detail...
Status: done
2025-07-30
WORK-SHOP
Problem: Update PMR + WBI + Scanning for June 2025
Action: see detail...
Status: done
2025-07-29
493-AC2-&-493-AC3
Problem: Auto grease low level
Action: see detail...
Status: done
2025-07-29
WORK-SHOP
Problem: List observation posibility recondition motor at OH 2026
Action: see detail...
Status: done
2025-07-29
333-WF1-&-BIN-LS-&-BIN-SHALE-SILILICA
Problem: Lighting lamp off
Action: see detail...
Status: done
2025-07-29
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-28
WORK-SHOP
Problem: Complete data TPM ER4
Action: see detail...
Status: done
2025-07-28
CAMERA-BURNER
Problem: Install Sensor Temp at Camera Burner ( Use way of temperature pyrometer )
Action: see detail...
Status: done
2025-07-28
363-RM1-L63-CM1-463-KL1-473-CC1
Problem: PMR Critical Motor area raw mill-coal mill-kiln-cooler
Action: see detail...
Status: done
2025-07-25
ER4
Problem: TPM ER4, clean up area
Action: see detail...
Status: done
2025-07-25
363-FN1&-363-FN2-&-363-MD1
Problem: Install Temp DE dan NDE, Cek Bearing Motor for Greasing, Cleaning Motor +Cek Carbon brush ALL Motor RM
Action: see detail...
Status: done
2025-07-25
WORK-SHOP
Problem: Complete data TPM ER4
Action: see detail...
Status: done
2025-07-25
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC + Update PMR + WBI
Action: see detail...
Status: done
2025-07-24
BAC-ROOM
Problem: Prepare control + pulling BAC room
Action: see detail...
Status: done
2025-07-24
L63-RM1
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-07-24
363-FN1-&-363-FN2
Problem: Issue temp Abnormal , Make sure addressing ST12, CH5/6, Prepare Pulling cable , Temp Winding
Action: see detail...
Status: done
2025-07-24
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-23
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-23
363-FN1
Problem: Observation abnormaly temperature
Action: see detail...
Status: done
2025-07-23
463-2K1-&-443-2K1
Problem: PMR Service Analyser Preheater & IKGA N1
Action: see detail...
Status: done
2025-07-23
L3C-TR1
Problem: Repare LS -Cleaning control dan Radio Link
Action: see detail...
Status: done
2025-07-22
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC + Update PMR + WBI
Action: see detail...
Status: done
2025-07-22
L3C-BC7-TRIPPER
Problem: Info often babbling
Action: see detail...
Status: done
2025-07-22
473-FN7
Problem: Issue indication vibration error
Action: see detail...
Status: done
2025-07-21
373-FA4
Problem: Issue low for flow
Action: see detail...
Status: done
2025-07-21
493-AC2
Problem: Issue on and off 3 times
Action: see detail...
Status: done
2025-07-21
393-SCB
Problem: Cross Cek Indikation Motion Speed
Action: see detail...
Status: done
2025-07-21
443-CT1
Problem: Solenoid valve no 23 issue leakage
Action: see detail...
Status: done
2025-07-21
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR RM & CM1 & 463 KL1 & 473 FN7
Action: see detail...
Status: done
2025-07-21
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC + Update PMR + WBI
Action: see detail...
Status: done
2025-07-18
363-RM1
Problem: Activation DALOG (together with expert)
Action: see detail...
Status: done
2025-07-18
L1C-TL1
Problem: Prepare cable comsumable truck lift
Action: see detail...
Status: done
2025-07-18
483-FA2
Problem: Continue project 483 FA2
Action: see detail...
Status: done
2025-07-18
473-CC1
Problem: Install Memory Card CCTV Cooller
Action: see detail...
Status: done
2025-07-18
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC. Complete data check sheet PMR
Action: see detail...
Status: done
2025-07-17
443-PH1-&-423-EP1-&-463-KL1-&-L63-SR1
Problem: WBI Elec & Ins & Check I/O GCT, EP,PH&KL and re check Amp L63-SR1 isuuse Fluktuation
Action: see detail...
Status: done
2025-07-17
473-FA6
Problem: Install Motor Colling
Action: see detail...
Status: done
2025-07-17
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-16
WORK-SHOP
Problem: Data part work shop per cabinet save at fi
Action: see detail...
Status: done
2025-07-16
443-PH1-4TH-&-8TH-FLOOR-AND-WS-MECHANIC-1
Problem: Tagging Tool Truba Jaga Cita
Action: see detail...
Status: done
2025-07-16
L63-RM1
Problem: PMR Service Analyser CM
Action: see detail...
Status: done
2025-07-16
473-FA5-&-FA6
Problem: Replace cooling blower
Action: see detail...
Status: done
2025-07-15
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-15
483-FA2
Problem: Continue project 483 FA2
Action: see detail...
Status: done
2025-07-15
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-07-15
443-EL1
Problem: PMR Serv. Elevator PH NAR1 & WBI Sump El
Action: see detail...
Status: done
2025-07-14
WORK-SHOP
Problem: Data part work shop per cabinet save at file PC
Action: see detail...
Status: done
2025-07-14
483-FA2
Problem: Continue project
Action: see detail...
Status: done
2025-07-14
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-07-14
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-07-14
WORK-SHOP
Problem: Data part per cabinet and save at file PC
Action: see detail...
Status: done
2025-07-11
463-2K1
Problem: Service analyzer
Action: see detail...
Status: done
2025-07-10
483-2K1
Problem: Prepare Temperature Sensor 483-2K1
Action: see detail...
Status: done
2025-07-10
WORK-SHOP
Problem: Complete Report ALL PMR & WBI
Action: see detail...
Status: done
2025-07-10
443-PH1--463-KL1-BURNER-FLOOR
Problem: PMR IR TAD- T Scanner- CCTV - Camera Burner
Action: see detail...
Status: done
2025-07-10
473-FN4
Problem: Observation 473-FN4 ( Test rotation, Test Load, Abnormaly, Discouple)
Action: see detail...
Status: done
2025-07-09
473-FN4-AND-473-FN6
Problem: Prepare trouble problem at motor 37 KW-970 RPM
Action: see detail...
Status: done
2025-07-08
363-RM1-&-FEED-BIN
Problem: Tidy up garbage put in garbage tank
Action: see detail...
Status: done
2025-07-08
473-GQ-GREAT-COOLER
Problem: Repare Focus Camera CCTV south side #3
Action: see detail...
Status: done
2025-07-08
ER5
Problem: PMR MCC load, UPS ER5 NAR1 & PLC CCR
Action: see detail...
Status: done
2025-07-08
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-07-08
WORK-SHOP
Problem: Fabrication Frame UPS ER3 and 483-FA2
Action: see detail...
Status: done
2025-07-08
363-RM1-&-FEED-BIN
Problem: Tidy up garbage put in garbage tank
Action: see detail...
Status: done
2025-07-07
HRG
Problem: Install dozing motor
Action: see detail...
Status: done
2025-07-07
463-2K1-&-443-2K1
Problem: PMR Analyzer IKGA and PH + Finding leakage at probe 463 2K1
Action: see detail...
Status: done
2025-07-07
WORK-SHOP
Problem: Fabrication Frame UPS ER3 dan 483-FA2
Action: see detail...
Status: done
2025-07-07
WORK-SHOP-&-473-GQ1
Problem: Instal New CCTV R Hydraulic and setting computer for CCTV
Action: see detail...
Status: done
2025-07-07
463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-07-04
473-CC1
Problem: Prepare CCTV Great Cooler +Install Supporting Camera
Action: see detail...
Status: done
2025-07-04
363-FA2-AND-363-MD-1
Problem: PM RM, Replace CB dan Cleaning Deeply Motor 363-MD1 + FAN Raw Mill
Action: see detail...
Status: done
2025-07-04
ER3
Problem: Replace Battery UPS
Action: see detail...
Status: done
2025-07-03
473-CC1
Problem: Prepare +Pulling cable LAN CCTV Great Cooler
Action: see detail...
Status: done
2025-07-03
WORK-SHOP
Problem: Scanning Data + complete Form WBI dan PMR
Action: see detail...
Status: done
2025-07-03
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-07-02
463-2K1
Problem: Repare Flapper probe
Action: see detail...
Status: done
2025-07-02
ELECTRICAL-NR2
Problem: Activation Protection Analyzer PH 7 + CM
Action: see detail...
Status: done
2025-07-02
483-FA2-&-473-FA2
Problem: Prepare Wiring Instalation Upgrade
Action: see detail...
Status: done
2025-07-02
WORK-SHOP
Problem: Fabrication Support Line Grease
Action: see detail...
Status: done
2025-07-02
WORK-SHOP
Problem: Complete Document PMR dan WBI All Area
Action: see detail...
Status: done
2025-07-02
L3C-BC1
Problem: Observation Modification Motion Detector
Action: see detail...
Status: done
2025-06-26
473-FN7-M1-&-M2--AND-MOTOR-AREA-COOLER-ALSO-WORK-SHOP
Problem: Cleaning motor cooler & tidy up spare part
Action: see detail...
Status: done
2025-06-26
WORK-SHOP
Problem: Complete form PMR and WBI month of June
Action: see detail...
Status: done
2025-06-26
L63-BF1
Problem: Replace / repare L63BF1 comp 8 (Info is not working) , Comp 7 leakage
Action: see detail...
Status: done
2025-06-26
483-BL7-&-483-BL9
Problem: Add Greasing motor
Action: see detail...
Status: done
2025-06-26
BELT-FEED
Problem: Replace Lighting lamp 3 units
Action: see detail...
Status: done
2025-06-25
WORK-SHOP
Problem: Complete data check sheet PMR and WBI month of June 2025
Action: see detail...
Status: done
2025-06-25
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-24
WORK-SHOP-NR2
Problem: Assembling motor 454 BL1
Action: see detail...
Status: done
2025-06-24
WORK-SHOP-N2
Problem: Inspection electrical & welding tools OH NR2
Action: see detail...
Status: done
2025-06-23
WORK-SHOP-ELECTRIC-NR2
Problem: Completing data check sheet calibration temperature and pressure transmitter OH NR2
Action: see detail...
Status: done
2025-06-21
364-RM1-&-424-FN1
Problem: Calibration temperature OH NR2
Action: see detail...
Status: done
2025-06-20
424-FN1
Problem: Check vibration-noise motor issue high vibration and noise
Action: see detail...
Status: done
2025-06-20
WORK-SHOP
Problem: Scanning data check sheet calibration pressure-temperature transmitter-inspection electrical & welding tools OH nr2
Action: see detail...
Status: done
2025-06-19
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-18
MAIN-GATE-ACCES-CONTROL
Problem: Main gate and plant building inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-18
OH-NR2
Problem: Calibration pressure transmitter area PH-RM-CC
Action: see detail...
Status: done
2025-06-17
MAIN-GATE-ACCES-CONTROL
Problem: Main gate inspection electrical & welding tools
Action: see detail...
Status: done
2025-06-17
OH-NR2
Problem: Calibration pressure transmitter area PH-RM-CC
Action: see detail...
Status: done
2025-06-16
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools
Action: see detail...
Status: done
2025-06-14
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electical and welding tools
Action: see detail...
Status: done
2025-06-13
463-2K1
Problem: PMR service analizer 463 2K1 IKGA
Action: see detail...
Status: done
2025-06-13
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electical and welding tools
Action: see detail...
Status: done
2025-06-12
433-BE1
Problem: Activated speed sensor
Action: see detail...
Status: done
2025-06-12
L1C-BC7
Problem: Install AUTO grease pump
Action: see detail...
Status: done
2025-06-12
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-11
L3C-RE1-&-L1C-TR1
Problem: Cleaning Rec dan Tripper Batu bara
Action: see detail...
Status: done
2025-06-11
WORK-SHOP-OF-PLANT-BUILDING-&-MAIN-GATE
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-10
MECHANICAL-AFR-&-MAIN-GATE
Problem: Inspection electrical & welding tools
Action: see detail...
Status: done
2025-06-09
L63-BV3
Problem: Install Motor cooling Back actuator
Action: see detail...
Status: done
2025-06-09
WS-PLANT-BUILDING-&-MAIN GATE
Problem: Inspection electrical & welding tools
Action: see detail...
Status: done
2025-06-09
463-2K1
Problem: PMR Service Analyser IKGA- repare Rel + adjusment Sensor
Action: see detail...
Status: done
2025-06-09
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-06-07
WORK-SHOP-PLANT-BUILDING
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-07
364-RM1-PT-CIVACON
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2025-06-07
TENT-&-TOILET-OH
Problem: Install lighting lamp
Action: see detail...
Status: done
2025-06-05
WORK-SHOP
Problem: Check dan complete PMR dan WBI
Action: see detail...
Status: done
2025-06-05
483-FA2
Problem: Prepare instalation Drive 483-FA2 + Prepare Drawing Diagram + IO needed
Action: see detail...
Status: done
2025-06-05
L63-RM1
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-06-05
393-RF2
Problem: Issue often stop because speed switch failure
Action: see detail...
Status: done
2025-06-05
443-PH1
Problem: Issue lighting lamp 6th to north TV off
Action: see detail...
Status: done
2025-06-05
ER3-&-ER4--&-423-BF1
Problem: PMR Clean Up MCC ER All Area Kiln Nar1, Motor Area 423-BF1
Action: see detail...
Status: done
2025-06-03
463-2K1-&-443-2K1
Problem: PMR Service Analyser Preheater & IKGA N1
Action: see detail...
Status: done
2025-06-03
423-FN1
Problem: Replace lighting lamp
Action: see detail...
Status: done
2025-06-03
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-06-03
WORK-SHOP
Problem: Complete stop log PMR
Action: see detail...
Status: done
2025-06-02
WORK-SHOP
Problem: Check Portable electric Tools EL01
Action: see detail...
Status: done
2025-06-02
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-06-02
463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR Kiln & Cooler 1
Action: see detail...
Status: done
2025-06-02
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM & CM1
Action: see detail...
Status: done
2025-05-30
WORK-SHOP
Problem: PMR ampere kiln check cycle how many periode of month at weekly
Action: see detail...
Status: done
2025-05-30
L63-SX1.M1
Problem: Top up grease
Action: see detail...
Status: done
2025-05-30
-L63-LQ1.M1
Problem: Top up grease
Action: see detail...
Status: done
2025-05-30
L3A-BC1
Problem: Repair sensor ML
Action: see detail...
Status: done
2025-05-30
L63-RM1
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-05-30
ER4
Problem: Specification PMR MCC load ,Check I/O&UPS ER4 NAR1
Action: see detail...
Status: done
2025-05-28
WORK-SHOP
Problem: Fabrication cover for battery
Action: see detail...
Status: done
2025-05-28
WORK-SHOP
Problem: Complete Data, All Doc PMR, WBI, Data API Foto Copy PDF Adi, ZT, EVE Idam, Farchan
Action: see detail...
Status: done
2025-05-28
L63-RM1
Problem: WBI Elect & Ins & Check I/O CM,Sump T&T
Action: see detail...
Status: done
2025-05-28
463-2K1-&-443-2K1
Problem: PMR Service Analyser Preheater & IKGA N1
Action: see detail...
Status: done
2025-05-27
CCR
Problem: NAR 2 Install / Reconnect Operator NAR2 Section Kiln Area
Action: see detail...
Status: done
2025-05-27
WORK-SHOP
Problem: Complete data check sheet PMR & WBI month of may 2025
Action: see detail...
Status: done
2025-05-27
WORK-SHOP
Problem: CCTV WS off
Action: see detail...
Status: done
2025-05-27
463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-05-27
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-05-26
CCR
Problem: NAR 2 Install / Reconnect Operator NAR2
Action: see detail...
Status: done
2025-05-26
WORK-SHOP
Problem: Make notification WBI electric and instrumentation bottom blending-cooler-clinker silo
Action: see detail...
Status: done
2025-05-26
WORK-SHOP
Problem: TPM complete Data Dashboard
Action: see detail...
Status: done
2025-05-26
443-CT1
Problem: Install Indication Flow Meter
Action: see detail...
Status: done
2025-05-26
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-05-23
473-FN4
Problem: Repare Power Greasing
Action: see detail...
Status: done
2025-05-23
443-CT1
Problem: Flow meter value is not indication at CCR
Action: see detail...
Status: done
2025-05-23
453-PF1
Problem: Repare Solenoid Purging system
Action: see detail...
Status: done
2025-05-23
413-3B1-&-413-3B2-&-473-CC1-&-493-3B1
Problem: WBI Elec & Ins & Check I/O & S Pump Blending , Cooler, Clinker Silo
Action: see detail...
Status: done
2025-05-23
423-BF1.-T1-AND-T2
Problem: Issue indication temperature low at CCR
Action: see detail...
Status: done
2025-05-22
L63-RM1-SUMP-PUMP
Problem: Fix for Power Sump Pump Coal Mill HS
Action: see detail...
Status: done
2025-05-22
473-FN4
Problem: Issue AUTO grease is not working
Action: see detail...
Status: done
2025-05-22
473-FA5-TEMPARATURE-FS
Problem: Issue indication temperature abnormal
Action: see detail...
Status: done
2025-05-22
443-PH1-T1
Problem: Issue indication temperature abnormal
Action: see detail...
Status: done
2025-05-22
443-FN1
Problem: Support testing AUTO Balancer
Action: see detail...
Status: done
2025-05-22
ER4
Problem: Observation replace battery UPS ER-04 2402 need replace 6 unit
Action: see detail...
Status: done
2025-05-22
HRG
Problem: Cleaning area HRG and install level imodification
Action: see detail...
Status: done
2025-05-21
WORK-SHOP
Problem: Completing data check sheet WBI month of may 2025
Action: see detail...
Status: done
2025-05-21
L63-RM1
Problem: Install control sump pump
Action: see detail...
Status: done
2025-05-21
363-HC1-
Problem: Check Hoist Crane RM
Action: see detail...
Status: done
2025-05-21
L63-WF1
Problem: Issue replace belt
Action: see detail...
Status: done
2025-05-21
423-BF1
Problem: Modification temperature sensor for T1 and T2
Action: see detail...
Status: done
2025-05-21
443-PH1
Problem: Re check and tidy up lighting lamp 8th floor
Action: see detail...
Status: done
2025-05-21
413-3B1-&-413-3B2-&-473-CC1
Problem: Cleaning up panel I/O area blending & cooler
Action: see detail...
Status: done
2025-05-21
443-FN1
Problem: Support Auto Balancer ,install sensor
Action: see detail...
Status: done
2025-05-20
CCR
Problem: Pulling cable AC server room to CCR
Action: see detail...
Status: done
2025-05-20
393-SCB
Problem: Connected cable power motor and test run
Action: see detail...
Status: done
2025-05-20
393-SC6
Problem: Repaire propeller motion because broken
Action: see detail...
Status: done
2025-05-20
463-2K1
Problem: Activation Re-track probe
Action: see detail...
Status: done
2025-05-20
L63-IP1
Problem: Activation indication Low Temp CO2 liquid (DI- Pulling cable to Room Hydraulic)
Action: see detail...
Status: done
2025-05-20
483-FA2
Problem: Support Instalation motor and alignment
Action: see detail...
Status: done
2025-05-20
443-FN1
Problem: Support Instalation Auto Balancer
Action: see detail...
Status: done
2025-05-19
WORK-SHOP
Problem: Make data Kiln-RM-CM for shut down-off-PM 2025
Action: see detail...
Status: done
2025-05-19
WORK-SHOP
Problem: Inspection electrical & welding tools of PT CIVACON
Action: see detail...
Status: done
2025-05-19
L63-IP1
Problem: CO2 system install heater temperature
Action: see detail...
Status: done
2025-05-19
473-CC1
Problem: Cleaning Motor cooller Fan
Action: see detail...
Status: done
2025-05-19
L63-FN1
Problem: Finishing area motor
Action: see detail...
Status: done
2025-05-19
WORK-SHOP
Problem: Create Permit Replace Auto Balancer 443-FN1
Action: see detail...
Status: done
2025-05-19
493-AC1
Problem: Issue there is jumper cable of roof switch
Action: see detail...
Status: done
2025-05-19
483-FA2
Problem: Observation data motor for base-frame-high shaft-diameter shaft
Action: see detail...
Status: done
2025-05-16
413-3B1-&-3B2
Problem: Cross check level blending
Action: see detail...
Status: done
2025-05-16
WORK-SHOP
Problem: Observation Auto Balancer, Check coil winding
Action: see detail...
Status: done
2025-05-16
TPM-L63-FN1 & L63 IP1
Problem: Completing data AM and data dash board and sign safety for CO2 systems.
Action: see detail...
Status: done
2025-05-16
L63-FN1-&-L63-IP1
Problem: TPM area id CM and CO2 system
Action: see detail...
Status: done
2025-05-15
483-FA2
Problem: Issue high vibration and noise, add grease Mitigation WBI CBM Finding Add Greasing
Action: see detail...
Status: done
2025-05-15
WORK-SHOP
Problem: Completing check sheet PMR month of May
Action: see detail...
Status: done
2025-05-15
WORK-SHOP
Problem: Observation Auto Balancer
Action: see detail...
Status: done
2025-05-15
L63-RM1
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-05-15
ER3-&-ER4-
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-05-15
443-PH1-463-KL1-BURNER-FLOOR
Problem: PMR Service temperature IR TAD-CCTV-T scanner & pyrometer NAR1
Action: see detail...
Status: done
2025-05-15
463-LQ1-ROOM
Problem: Replace lighting lamp
Action: see detail...
Status: done
2025-05-13
423-BF1-PDT-2001
Problem: Issue indication pressure low (1.4 mbar)
Action: see detail...
Status: done
2025-05-14
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM & CM1
Action: see detail...
Status: done
2025-05-14
483-BL9-& 483 BL2 & L63 MD1
Problem: Mitigation WBI CBM Finding Add Greasing
Action: see detail...
Status: done
2025-05-14
CCR
Problem: Finishing / Instalation support server rack mounts
Action: see detail...
Status: done
2025-05-14
WORK-SHOP
Problem: Observation Auto Balancer
Action: see detail...
Status: done
2025-05-14
WORK-SHOP
Problem: Do Form /Calibration Speed /Critical Motor Cooller
Action: see detail...
Status: done
2025-05-14
L63-SR1.P2
Problem: Issue indication pressure low at CCR, Relocation pressure Transmiter (Replace Pressure Transmiter)
Action: see detail...
Status: done
2025-05-13
423-BF1.-T1-AND-T2
Problem: Cross Check temperature T1 & T2
Action: see detail...
Status: done
2025-05-13
CCR
Problem: Observation support server rack mounts
Action: see detail...
Status: done
2025-05-13
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-05-13
363-LQ1.T2
Problem: Issue value often error make raw mill off
Action: see detail...
Status: done
2025-05-13
ER3
Problem: PMR Service Clean up MCC ER3 NAR1
Action: see detail...
Status: done
2025-05-09
ER5-&-ER6
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-05-09
CCR
Problem: New Operator NAR 2 ( Install lamp Server , Install Power , dismantling Power +Install LAN)
Action: see detail...
Status: done
2025-05-09
463-2K1
Problem: Connect cable job final task EVE + Activation Emergency retract (simulation dan test)
Action: see detail...
Status: done
2025-05-09
WORK-SHOP
Problem: Tidy Up data vs realisation ( API Audit)
Action: see detail...
Status: done
2025-05-09
493-AC2
Problem: Check indication R1
Action: see detail...
Status: done
2025-05-08
CCR
Problem: New Operator NAR 2 secure cable + prepare connect cable power + LAN
Action: see detail...
Status: done
2025-05-08
PT-PINCURAN-MAS
Problem: Inspection electrical tools
Action: see detail...
Status: done
2025-05-08
463-2K1
Problem: Connect cable job final task EVE
Action: see detail...
Status: done
2025-05-08
493-BF1
Problem: Air Regulator Bocor
Action: see detail...
Status: done
2025-05-08
ER3-&-ER4-
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-05-08
L63-RM1
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-05-07
463-2K1
Problem: Pulling cable for final task + Re-program DCS
Action: see detail...
Status: done
2025-05-07
BURNER-FLOOR-&-443-PH1
Problem: Do certification flow meter diesel at burner floor and pre heater
Action: see detail...
Status: done
2025-05-07
WORK-SHOP
Problem: Tidy UP data PMR dan WBI All Area
Action: see detail...
Status: done
2025-05-07
L3A-BC1
Problem: Repair sling switch sensor ML
Action: see detail...
Status: done
2025-05-07
463-2K1-&-443-2K1
Problem: PMR Service Analyser
Action: see detail...
Status: done
2025-05-07
WORK-SHOP
Problem: Observation FO cable way to WS NAR 1
Action: see detail...
Status: done
2025-05-07
473-CC1-&-443-PH1
Problem: Grounding antidote to evil spirits coal dozing N1 dan Preheater N1 value more than 5 ohm
Action: see detail...
Status: done
2025-05-06
483-PF1
Problem: Issue reading coal high at CCR compare from process
Action: see detail...
Status: done
2025-05-06
443-CT1
Problem: Solenoid no 18 for water bakcward direction
Action: see detail...
Status: done
2025-05-06
AREA-NR1
Problem: Certification antidote to evil spirits
Action: see detail...
Status: done
2025-05-06
WORK-SHOP
Problem: Install box server and connect cable
Action: see detail...
Status: done
2025-05-06
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-05-06
423-2K1
Problem: PMR Service CEMS
Action: see detail...
Status: done
2025-05-06
WORK-SHOP
Problem: Tidy up spare part di WS NAR1,also completing data motor survey energi bahaya Nr1
Action: see detail...
Status: done
2025-05-05
WORK-SHOP
Problem: Tidy Up, Spare Part di WS NAR1,also completing data motor survey energi bahaya Nr1
Action: see detail...
Status: done
2025-05-05
BURNER-FLOOR
Problem: 483-BU1 Replace ELCB Welding Burner
Action: see detail...
Status: done
2025-05-05
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-05-05
NAROGONG-1
Problem: Certification antidote to evil spirits
Action: see detail...
Status: done
2025-05-02
443-PH1
Problem: Install bright lamp
Action: see detail...
Status: done
2025-05-02
443-PH1
Problem: Inspection electric and welding tools of PT Truba Jaga Cita
Action: see detail...
Status: done
2025-05-02
393-FA7
Problem: Install cover give for AS motor become room air sirculation
Action: see detail...
Status: done
2025-05-02
393-SCA
Problem: Continue install lamp
Action: see detail...
Status: done
2025-05-02
BURNER-FLOOR
Problem: Replace drain air tank
Action: see detail...
Status: done
2025-05-02
ER3-&-ER4-
Problem: Clean up MCC area
Action: see detail...
Status: done
2025-05-02
WORK-SHOP
Problem: Completing check sheet WBI Elect & Ins & Check I/O CM,Sump T&T. make notification abnormal finding
Action: see detail...
Status: done
2025-05-02
463-2K1
Problem: Trouble shooting O2 high
Action: see detail...
Status: done
2025-05-02
443-CT1
Problem: Replace solenoid valve no 18
Action: see detail...
Status: done
2025-04-29
443-FN1
Problem: Observation failure AUTO BALANCER
Action: see detail...
Status: done
2025-04-29
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-04-28
WORK-SHOP
Problem: Completing data TPM 443 EL1
Action: see detail...
Status: done
2025-04-28
423-FN1
Problem: Check cable AUTO BALANCER reference to normal test to NR2
Action: see detail...
Status: done
2025-04-28
423-2K1
Problem: CEMS NAR1 Trouble Shooting
Action: see detail...
Status: done
2025-04-28
-463-KL1-&-473-CC1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-04-25
393-BE1
Problem: Check/Replace sensor Turbo Coupling
Action: see detail...
Status: done
2025-04-25
443-FN1
Problem: Test Auto Balancer
Action: see detail...
Status: done
2025-04-25
363-LQ1-T2-&-T3
Problem: Tidy up cable temperature sensor
Action: see detail...
Status: done
2025-04-25
363-MD1
Problem: Fabrication transfer hot air motor from man drive
Action: see detail...
Status: done
2025-04-25
363-FN1
Problem: Replace Cell Robicon
Action: see detail...
Status: done
2025-04-25
BOTTOM-BLENDING-KILN-COOLER-CLINKER-SILO
Problem: WBI Elec & Ins & Check I/O & S Pump Bl,C
Action: see detail...
Status: done
2025-04-24
413-BF3
Problem: Issue leakage at membran
Action: see detail...
Status: done
2025-04-24
423-BF1
Problem: Check indication ML issue abnormal
Action: see detail...
Status: done
2025-04-24
363-MD1
Problem: Observation or fabrication for transfer hot air from main drive
Action: see detail...
Status: done
2025-04-24
363-RM1-&-L63-RM1-&-463-KL1-&-473-CC1
Problem: PMR Critical Motor Kiln/RM
Action: see detail...
Status: done
2025-04-24
L63-2K2
Problem: Repare Analizer
Action: see detail...
Status: done
2025-04-24
443-FN1
Problem: AUTOABALANCER; 1 cable coil any indication short to ground, 2. Cable sensor at fix side abnormal speed value13000 RPM
Action: see detail...
Status: done
2025-04-24
ER3-&-ER4-&-L63-RM1-&-BURNER-FLOOR
Problem: PMR Clean Up MCC ER All Area Kiln Nar1 + Cleaning Lamp area CM -Burner
Action: see detail...
Status: done
2025-04-24
443-PH1-423-EP1-463-KL1
Problem: WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Action: see detail...
Status: done
2025-04-24
WORK-SHOP
Problem: Scan check sheet analyser month march 25 and april 25
Action: see detail...
Status: done
2025-04-23
363-MD1
Problem: Fabrication or install blower
Action: see detail...
Status: done
2025-04-23
L63-BV3
Problem: Issue position manual but when AUTO show zero
Action: see detail...
Status: done
2025-04-23
363-MD1
Problem: Cross check value for temperature-ampere-KW
Action: see detail...
Status: done
2025-04-23
PMR-&-WBI-MOTN-MARCH-TO-APRIL-2025
Problem: Completing data PMR and WBI month March to April 2025
Action: see detail...
Status: done
2025-04-21
443-FN1
Problem: Replace vibration sensor issue burned
Action: see detail...
Status: done
2025-04-21
463-2K1
Problem: Issue can not AUTO
Action: see detail...
Status: done
2025-04-21
473-FA2-P1
Problem: Cross check issue indication at CCR to big compare local
Action: see detail...
Status: done
2025-04-21
443-PH1-&-463-KL1-&-L33-BC2-&-BURNER-FLOOR
Problem: PMR CCTV, IR TAD, Kiln Scanner, Camera burner
Action: see detail...
Status: done
2025-04-17
443-WI1-V1
Problem: Issue leakage at solenoid valve
Action: see detail...
Status: done
2025-04-17
443-FN1
Problem: Support test AUTO BALANCER
Action: see detail...
Status: done
2025-04-17
HRG
Problem: Install plat form for HRG or WTP and commisioning HRG
Action: see detail...
Status: done
2025-04-17
443-EL1
Problem: Support PT LOUSER instalation wire rope
Action: see detail...
Status: done
2025-04-17
493-FN2,-FN3,-FN4-
Problem: Test signal S
Action: see detail...
Status: done
2025-04-17
493-AC2-&-AC4-R1
Problem: Roof switch R1 signal S and G top position often blinking
Action: see detail...
Status: done
2025-04-16
CCR
Problem: Relocation new operator KILN1 and FM1
Action: see detail...
Status: done
2025-04-16
363-MD1
Problem: Support GEAR BOX instalation and finisshing instalation 363 MD!
Action: see detail...
Status: done
2025-04-16
333-EH1
Problem: Rewiring control hoist feed bin
Action: see detail...
Status: done
2025-04-16
443-FN1
Problem: Check cable vibration and sensor vibration
Action: see detail...
Status: done
2025-04-16
HRG-
Problem: Install plat form for HRG or WTP
Action: see detail...
Status: done
2025-04-15
363-MD1
Problem: Temperature winding T5 & T6 are error
Action: see detail...
Status: done
2025-04-15
393-AS2
Problem: Welding point is burned
Action: see detail...
Status: done
2025-04-15
393-SGC-&-393-SGB
Problem: Relocation proximity
Action: see detail...
Status: done
2025-04-15
473-CC1-&-GLASS-INSPECTION-COMPARTEMENT-
Problem: Light lamp at cooler are off and glass inspection are not clear
Action: see detail...
Status: done
2025-04-15
363-MD1
Problem: Pulling cable and instalation support cable temperature bearing motor 6P x 0.75mm around 30 meter
Action: see detail...
Status: done
2025-04-14
363-MD1
Problem: Rewiring control VCS
Action: see detail...
Status: done
2025-04-14
363-BC1
Problem: Connect cable power
Action: see detail...
Status: done
2025-04-14
363-HE1
Problem: Repare hoise Raw Mill
Action: see detail...
Status: done
2025-04-14
HRG
Problem: Disconnect pipe for Hydraugent & O2
Action: see detail...
Status: done
2025-04-14
483-BL7-&-483-BL9
Problem: Check function of EASY LUB
Action: see detail...
Status: done
2025-04-14
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM & CM1 make sure heater function
Action: see detail...
Status: done
2025-04-14
HRG
Problem: Modification control pump clorine
Action: see detail...
Status: done
2025-04-11
CLEANING-LCS-PANEL-ALL-AREA-TYRE-KILN-&-473-CC1
Problem: LCS outside very dirtyof dust
Action: see detail...
Status: done
2025-04-10
363-MD1
Problem: Rewiring control VCS
Action: see detail...
Status: done
2025-04-10
HRG
Problem: Install HRG Capasitor + Observation Condensate
Action: see detail...
Status: done
2025-04-10
453-PF1-&-483-PF1
Problem: Cleaning, test LC, oil drum
Action: see detail...
Status: done
2025-04-09
493-AC1
Problem: Service roof for SW
Action: see detail...
Status: done
2025-04-09
473-FA2
Problem: Reverse rotation and install cover bar
Action: see detail...
Status: done
2025-04-09
L63-MD1-&-473-FN7
Problem: Motor position to ware house for repairing
Action: see detail...
Status: done
2025-04-09
483-PF1-SG8
Problem: Solenoid abnormal
Action: see detail...
Status: done
2025-04-09
483-PF1
Problem: Cleaning, test LC, oil drum
Action: see detail...
Status: done
2025-04-09
483-PF1
Problem: Issue value ampere fluctuation
Action: see detail...
Status: done
2025-03-26
V93-EH1
Problem: LCS damaged
Action: see detail...
Status: done
2025-03-26
493-SG5
Problem: Issue abnomarly function ( can not operated from CCR )
Action: see detail...
Status: done
2025-03-26
363-FA2
Problem: Install motor and base plate
Action: see detail...
Status: done
2025-03-26
493-BF1
Problem: Issue some membran abnormal
Action: see detail...
Status: done
2025-03-26
363-RM1
Problem: Dismalting All sensor Gear Box RM NAR 1
Action: see detail...
Status: done
2025-03-26
363-MD1-M2
Problem: Install Motor +Fabrication Filter Housing + (commisioning)
Action: see detail...
Status: done
2025-03-26
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-03-26
363-RM1,-423-BF1,-443-CT1,FEED-BIN
Problem: WBI electrical & instrumentation panel I/O feed bin; Heater motor damaged
Action: see detail...
Status: done
2025-03-11
443-PH1
Problem: Lighting off at Top bucket 393 BE1; 433 BF2; 433 RF2
Action: see detail...
Status: done
2025-03-11
MAIN-GATE-ACCES-CONTROL
Problem: Check inspection tools of PT INDOPORLEN
Action: see detail...
Status: done
2025-03-07
493-AC3
Problem: Check motor connection or observation
Action: see detail...
Status: done
2025-03-07
473-FN7
Problem: Test run and install seding motor
Action: see detail...
Status: done
2025-03-07
473-LD1
Problem: Issue motor heavy for open and close
Action: see detail...
Status: done
2025-03-07
493-FN2-FN3-FN4-FN5-RF1
Problem: Finding push button stop to DCS abnormal
Action: see detail...
Status: done
2025-03-07
L63-2K1
Problem: Sample line not enough 4 meter due flange probe move to north side
Action: see detail...
Status: done
2025-03-07
473-FA2.C1
Problem: Replace module soft stater
Action: see detail...
Status: done
2025-03-06
333-WF1-UNTIL-333-WF4
Problem: Observation for calibration zero and span
Action: see detail...
Status: done
2025-03-04
L63-RM1
Problem: WBI Elect & Ins & Check I/O CM,Sump T&T
Action: see detail...
Status: done
2025-03-06
473-FA2
Problem: Disconnect motor and acceories
Action: see detail...
Status: done
2025-03-06
473-FN7
Problem: Connect motor and accecories
Action: see detail...
Status: done
2025-03-06
393-FN3
Problem: Test run and install V-belt
Action: see detail...
Status: done
2025-03-06
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-03-05
L63-SR1
Problem: Connect cable power
Action: see detail...
Status: done
2025-03-05
L63-BV3
Problem: Observation instalation for back actuator
Action: see detail...
Status: done
2025-03-05
TENT-OH
Problem: Dismalting Lamp Tend + Accecories RMK NAR 1 Area
Action: see detail...
Status: done
2025-03-05
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-03-05
WORK-SHOP
Problem: Completing data PMR and WBI month January & March 2025
Action: see detail...
Status: done
2025-03-04
393-FA6
Problem: Continue finding abnormaly
Action: see detail...
Status: done
2025-03-04
433-SG8
Problem: Connect limit switch
Action: see detail...
Status: done
2025-03-04
473-FN7
Problem: Prepare replace motor
Action: see detail...
Status: done
2025-03-04
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-03-03
E1-COMMISSIONING-ALL-AREA
Problem: COMMISSIONING-ALL AREA
Action: see detail...
Status: done
2025-03-03
393-FA6-&-393-FA7
Problem: Issue hot surface motor of FA6 and wrong round motor of FA7
Action: see detail...
Status: done
2025-03-03
383-MD1-M1
Problem: Clean up motor
Action: see detail...
Status: done
2025-03-03
363-RM1-&-L63-RM1
Problem: PMR Service Critical Motor & LSR RM&CM1
Action: see detail...
Status: done
2025-03-03
L3A-BC1-&-473-FA1-TO-473-FAA
Problem: Issue oil seeping from motor and take out battery for AUTO grease
Action: see detail...
Status: done
2025-02-28
443-PH1-&-WORK-SHOP
Problem: Make name addressing panel I/O area preheater also clean up panel I/O 3C1-2RB-72. Write data 463 MD1
Action: see detail...
Status: done
2025-02-27
313-3B1;-313-3B2;-363-RM1;-333-AC1;-333-WF
Problem: Install sign WARNING panel I/O and name addressing panel I/O area 493 AC1-313 3B2-443 PH1
Action: see detail...
Status: done
2025-02-26
443-PH1
Problem: Sign WARNING at panel I/O pre heater
Action: see detail...
Status: done
2025-02-24
443-PH1-AND-MAIN-GATE-ACCESS-CONTROL
Problem: Clean up panel I/O area pre heater and inspection electrical tools of PT QUADRO
Action: see detail...
Status: done
2025-02-21
ER3-&-ER4
Problem: Blackout power and manuver power
Action: see detail...
Status: done
2025-02-19
443-PH1
Problem: Inspection welding tools of PT TRUBA JAGA CITA because welding cable is not safe due open
Action: see detail...
Status: done
2025-02-19
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools of PT QUADRO-PT JANTAN SETIA SAKTI & PT KAD
Action: see detail...
Status: done
2025-02-18
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical tools of PT INDO BARA
Action: see detail...
Status: done
2025-02-17
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools of PT Indo Bara & PT Quadro
Action: see detail...
Status: done
2025-02-14
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools of PT BOVERI INDONESIA & PT TRUBA JAGA CITA
Action: see detail...
Status: done
2025-02-13
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools of PT BOVERI INDONESIA & PT TRUBA JAGA CITA
Action: see detail...
Status: done
2025-02-12
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical tools of PT SUPRA
Action: see detail...
Status: done
2025-02-11
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical tools of PT TRUBA JAGA CITA
Action: see detail...
Status: done
2025-02-10
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools of PT INDOPORLEN-PT CIVACON-PT TRUBA JAGA CITA-PT TOTAL PRIME ENGINEERING
Action: see detail...
Status: done
2025-02-09
473-CC1
Problem: Check equipment and electric support ( BROOK, CABLE )
Action: see detail...
Status: done
2025-02-09
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding tools of PT MBL & PT SHINAGAWA
Action: see detail...
Status: done
2025-02-09
BURNER-FLOOR
Problem: Replace breaker 100 A to 125 A
Action: see detail...
Status: done
2025-02-09
363-PU1
Problem: Continue fabrication box and control, install module CCR, pulling cable MCC (final check )
Action: see detail...
Status: done
2025-02-09
473-CC1
Problem: Repare or modified breaker brook
Action: see detail...
Status: done
2025-02-09
TOILET-&-TENT-OH
Problem: Install lamp and connector tent also toilet also support electric connection
Action: see detail...
Status: done
2025-02-07
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical & welding tools of PT INDOPORLEN-PT TRUBA JAGA CITA-PT SHINAGAWA
Action: see detail...
Status: done
2025-02-07
363-RM1-HOIST-CRANE
Problem: Check hoist crane
Action: see detail...
Status: done
2025-02-07
473-CC1
Problem: Check brook at cooler
Action: see detail...
Status: done
2025-02-07
363-PU1
Problem: Continue fabrication box and control, install module CCR, pulling cable MCC
Action: see detail...
Status: done
2025-02-07
443-PH1
Problem: Issue winci 8th sag when take of load
Action: see detail...
Status: done
2025-02-07
TOILET-&-TENT-OH
Problem: Observation bright lamp for toile & tent OH
Action: see detail...
Status: done
2025-02-07
WORK-SHOP
Problem: Prepare lamp 5 each for OH
Action: see detail...
Status: done
2025-02-06
483-RF2
Problem: Issue from production ask activated empty bin
Action: see detail...
Status: done
2025-02-06
363-PU1
Problem: Fabrication panel and control. Install module CCR and pulling cable MCC
Action: see detail...
Status: done
2025-02-06
SUPRA
Problem: Inspection electrical and welding machine of SUPRA
Action: see detail...
Status: done
2025-02-06
PINCURAN-MAS-&-JANTAN-SETIA-SAKTI
Problem: Inspection electrical and welding machine of Pincuran Mas & Jantan Setia Sakti
Action: see detail...
Status: done
2025-02-05
363-PU1
Problem: Fabrication panel and control continue install MCC, pulling cable
Action: see detail...
Status: done
2025-02-05
453-PF1-&-483-PF1
Problem: Elimination pfister feeder such as wrapping, disconnect, lock mechanical force
Action: see detail...
Status: done
2025-02-05
WORK-SHOP
Problem: Cleaning facility car
Action: see detail...
Status: done
2025-02-05
WORK-SHOP
Problem: Prepare permit OH every location and arrange people OH
Action: see detail...
Status: done
2025-02-05
TRUBA-JAGA-CITA;-PINCURAN-MAS
Problem: Inspection electrical and welding machine
Action: see detail...
Status: done
2025-02-04
L1C-BC5-
Problem: Observation replace lighting lamp power off
Action: see detail...
Status: done
2025-02-04
363-PU1
Problem: Fabrication panel and control
Action: see detail...
Status: done
2025-02-04
363-MD1
Problem: Clean up area motor and carbon brush room
Action: see detail...
Status: done
2025-02-04
363-MD1-& 473 FA7
Problem: Replace AUTO grease motor
Action: see detail...
Status: done
2025-02-04
463-KL1-&-473-CC1
Problem: PMR Service Crit Motor & LSR KL & Cooler
Action: see detail...
Status: done
2025-02-04
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-02-03
LIC-RE1&-L1C-BC5-&-L1C-BC6
Problem: Info lighting lamp hopper coal off and observation lamp off at BC
Action: see detail...
Status: done
2025-02-03
363-RM1-L63-CM1-463-KL1-473-CC1
Problem: PMR critical motor LSR RM & CM & KILN & COOLER
Action: see detail...
Status: done
2025-02-03
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-02-03
WORK-SHOP
Problem: TPM activity
Action: see detail...
Status: done
2025-01-31
443-EL1
Problem: Prepare pulling cable and install support
Action: see detail...
Status: done
2025-01-31
HRG
Problem: Investigation problem at HRG
Action: see detail...
Status: done
2025-01-31
WORK-SHOP
Problem: Completing data PMR and WBI month january 2025
Action: see detail...
Status: done
2025-01-30
WORK-SHOP
Problem: WS NAR 1 (Coverigng Garage area)
Action: see detail...
Status: done
2025-01-30
L63-CM1-
Problem: L63-SR1 Add grease
Action: see detail...
Status: done
2025-01-30
L63-CM1-
Problem: PMR Service Analyser Coal Mill NAR1
Action: see detail...
Status: done
2025-01-30
ER3-&-ER4-
Problem: PMR Clean Up MCC ER All Area Kiln Nar1
Action: see detail...
Status: done
2025-01-30
443-PH1-&-463-KL1&-BURNER-FLOOR
Problem: WBI Elec & Ins & Check I/O GCT, EP,PH&KL
Action: see detail...
Status: done
2025-01-30
FEED-BIN
Problem: WBI Electric & Instrumentation & Check I/O Feed-Bin
Action: see detail...
Status: done
2025-01-24
453-PF1-AREA-HOPPER
Problem: Relocation lighting lamp
Action: see detail...
Status: done
2025-01-24
L63-CM
Problem: Cable are coal mill are not neat
Action: see detail...
Status: done
2025-01-24
493-BF5
Problem: Issue 4 solenoid valve are not working
Action: see detail...
Status: done
2025-01-23
393-RF2
Problem: Speed sensor failure 2 times
Action: see detail...
Status: done
2025-01-23
L63-CM1-
Problem: PMR service analyzer L63 2k1-L63 2k2-L63 2K3-483 2K1
Action: see detail...
Status: done
2025-01-23
ER5-&-ER6-&-WORK-SHOP
Problem: PMR clean up MCC ER all area kiln, repainting wall and cleaning work shop
Action: see detail...
Status: done
2025-01-23
463-KL1-SHELL-COOLING-FAN
Problem: Observation cooling motor, bring down motor for servicing
Action: see detail...
Status: done
2025-01-23
443-FA1
Problem: Cooler fan motor abnormal
Action: see detail...
Status: done
2025-01-22
363-MD1
Problem: Issue red color at AUTO grease of LS
Action: see detail...
Status: done
2025-01-22
463-FX8-&-FX9
Problem: Motor over load
Action: see detail...
Status: done
2025-01-22
433-FN1
Problem: Cover panel cable is open
Action: see detail...
Status: done
2025-01-22
363-RM1
Problem: Replace power supply for panel I/O
Action: see detail...
Status: done
2025-01-22
463-KL1-&-473-CC1
Problem: PMR service critical motor LSR cooler and kiln
Action: see detail...
Status: done
2025-01-21
463-FX9
Problem: Unbalance motor
Action: see detail...
Status: done
2025-01-21
ER3-&-ER4-
Problem: PMR service clean up MCC ER3 & ER4
Action: see detail...
Status: done
2025-01-21
393-SCA
Problem: Motor ground
Action: see detail...
Status: done
2025-01-20
393-FA1
Problem: Arrange data spare part
Action: see detail...
Status: done
2025-01-20
363-BE1
Problem: Replace safety device
Action: see detail...
Status: done
2025-01-20
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-01-20
333-AC1-&-363-BE1
Problem: Add grease motor
Action: see detail...
Status: done
2025-01-18
363-CV1
Problem: Replace cable from pre amplifier to I/O panel
Action: see detail...
Status: done
2025-01-18
INPUT-OUPUT-PANEL-AREA-41
Problem: Replace power supply
Action: see detail...
Status: done
2025-01-18
CCR
Problem: pulling cable new operator
Action: see detail...
Status: done
2025-01-18
433-FA3-&-433-FN2
Problem: Replace bearing motor issue high vibration and noise
Action: see detail...
Status: done
2025-01-18
363-LD2
Problem: Replace card
Action: see detail...
Status: done
2025-01-18
483-PP1
Problem: Replace cable power
Action: see detail...
Status: done
2025-01-17
ER5-&-ER6-&-WORK-SHOP
Problem: PMR clean up MCC all area kiln NR1 and repainting work shop
Action: see detail...
Status: done
2025-01-17
333-BC1-&-363-WP1
Problem: Fan VSD off 1 each and prepare modification 363 WP1 for cable also control
Action: see detail...
Status: done
2025-01-17
333-BC1
Problem: Breaker input unsafe condition and open space
Action: see detail...
Status: done
2025-01-17
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2025-01-17
WORK-SHOP
Problem: Completing data PMR and WBI month January 2025
Action: see detail...
Status: done
2025-01-16
363-WP1
Problem: Prepare cable and support materials
Action: see detail...
Status: done
2025-01-16
363-LD2
Problem: Abnormally position damper, observation replace type of damper
Action: see detail...
Status: done
2025-01-16
L63-FN1
Problem: Pulling cable power and piping for cooling fan
Action: see detail...
Status: done
2025-01-16
ER3-&-ER4--&-WORK-SHOP
Problem: PMR clean up MCC ER all area kiln ad repainting work shop
Action: see detail...
Status: done
2025-01-16
CO2-SYSTEM-TANK-BOTTOM-AREA
Problem: Clean up area bottom tank of CO2 system
Action: see detail...
Status: done
2025-01-16
L63-FN1
Problem: Prepare colling fan and wiring panel LCS also control
Action: see detail...
Status: done
2025-01-15
WORK-SHOP
Problem: Prepare cooling fan L63 FN1
Action: see detail...
Status: done
2025-01-15
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-01-15
423-BF1
Problem: Clean up area bottom
Action: see detail...
Status: done
2025-01-15
TRUBA-JAGA-CITA
Problem: Inspection electrical and welding machine of Truba Jaga Cita
Action: see detail...
Status: done
2025-01-15
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
Problem: Inspection electrical and welding machine of plant building or civil building
Action: see detail...
Status: done
2025-01-15
WORK-SHOP-MECHANIC-1
Problem: Inspection electrical and welding machine of mechanic NR1
Action: see detail...
Status: done
2025-01-14
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
Problem: Inspection electrical and welding machine of plant building or civil building
Action: see detail...
Status: done
2025-01-14
WORK-SHOP-PPUP
Problem: Inspection electrical and welding machine of PPUP work shop
Action: see detail...
Status: done
2025-01-14
WORK-SHOP-MECHANIC-1
Problem: Inspection electrical and welding machine of mechanic NR1
Action: see detail...
Status: done
2025-01-14
463-KL1-&-473-CC1
Problem: PMR service critical motor & LSR cooler and kiln. Prepare cooling for L63 FN1
Action: see detail...
Status: done
2025-01-13
WORK-SHOP-OF-PLANT-BUILDING-OR-CIVIL-BUILDING
Problem: Inspection electrical and welding machine of plant building or civil building
Action: see detail...
Status: done
2025-01-13
WORK-SHOP-PPUP
Problem: Inspection electrical and welding machine of PPUP work shop
Action: see detail...
Status: done
2025-01-13
WORK-SHOP-MECHANIC-1
Problem: Inspection electrical and welding machine of mechanic NR1
Action: see detail...
Status: done
2025-01-13
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-01-11
WORK-SHOP
Problem: Mapping job OH
Action: see detail...
Status: done
2025-01-11
TENT-OH
Problem: Install lighting lamp and stop cotact
Action: see detail...
Status: done
2025-01-10
CCR
Problem: Re route cable power UPS of new operator CCR ( pulling new cable )
Action: see detail...
Status: done
2025-01-10
443-PH1-&-WORK-SHOP
Problem: Continue replace lighting lamp area pre heater and prepare cable-stop contact and lamp tent OH
Action: see detail...
Status: done
2025-01-09
ER-3-&-ER4
Problem: PMR clean up MCC ER all area kiln
Action: see detail...
Status: done
2025-01-09
443-PH1
Problem: Continue replace lighting lamp area pre heater and prepare lighting lamp for OH tent
Action: see detail...
Status: done
2025-01-09
ER4
Problem: PMR MCC load, check I/O & UPS
Action: see detail...
Status: done
2025-01-09
L63-CM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-01-08
393-FA7
Problem: Replace handle LCS
Action: see detail...
Status: done
2025-01-08
443-PH1
Problem: Check observation aeration all cyclone ( issue activation ) and relocation temperature sensor
Action: see detail...
Status: done
2025-01-08
443-PH1
Problem: Continue replace lighting lamp area pre heater and prepare lighting lamp for OH tent
Action: see detail...
Status: done
2025-01-08
L63-CM1
Problem: WBI electrical and instrumentation check I/O area CM, SUMP PUMP T&T
Action: see detail...
Status: done
2025-01-07
443-PH1
Problem: Observation efectivity of purging TAD
Action: see detail...
Status: done
2025-01-07
443-PH1
Problem: 8th floor lamp lighting off
Action: see detail...
Status: done
2025-01-07
463-KL1-&-473-CC1
Problem: PMR service critical motor LSR cooler and kiln
Action: see detail...
Status: done
2025-01-07
363-RM1-&-473-GQ1
Problem: Replace lighting lamp off
Action: see detail...
Status: done
2025-01-06
363-MD1-&-473-FA7
Problem: Replace auto grease
Action: see detail...
Status: done
2025-01-06
443-EL1
Problem: Prepare elevator connection cable power
Action: see detail...
Status: done
2025-01-06
WORK-SHOP
Problem: Colective and tag name spare part OH
Action: see detail...
Status: done
2025-01-06
463-2K1-&-443-2K1
Problem: PMR service analyzer & replace probe FE2
Action: see detail...
Status: done
2025-01-06
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2025-01-03
483-PP1
Problem: Observation replace cable power
Action: see detail...
Status: done
2025-01-03
393-BF2
Problem: Check purging are not working
Action: see detail...
Status: done
2025-01-03
363-FN1;363-FN2
Problem: Add grease info from CBM Mr.Najib high noise up 2 gE
Action: see detail...
Status: done
2025-01-02
4D3-BF1
Problem: Cleaning area motor
Action: see detail...
Status: done
2025-01-02
443-PH1-463-KL1-423-EP1
Problem: WBI electrical & instrumentation check I/O GCT-EP-PH & KILN
Action: see detail...
Status: done
2025-01-03
L63-CM1-
Problem: PMR service analyzer coal mill
Action: see detail...
Status: done
2025-01-02
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2025-01-02
FEED-BIN
Problem: WBI Electrical & Instrumentation check I/O
Action: see detail...
Status: done
2024-12-31
393-RF6
Problem: Observation abnormally motor
Action: see detail...
Status: done
2024-12-31
WORK-SHOP
Problem: Completing data TPM 433 PF1
Action: see detail...
Status: done
2024-12-31
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-12-31
463-KL1-&-473-CC1
Problem: PMR service critical motor LSR cooler and kiln
Action: see detail...
Status: done
2024-12-31
443-EL1-&-SUMP-PUMP-EL1
Problem: PMR service elevator and WBI sump pump
Action: see detail...
Status: done
2024-12-31
393-SC1-&-393-SC3
Problem: Clean up area motor
Action: see detail...
Status: done
2024-12-30
CCR
Problem: Fabrication cover hole at operator room
Action: see detail...
Status: done
2024-12-30
393-SC1
Problem: Relocation amplifier motion
Action: see detail...
Status: done
2024-12-30
393-FA7
Problem: Replace handle LCS
Action: see detail...
Status: done
2024-12-30
443-PH1;-L63-RM1;-463-KL1
Problem: PMR service IR TAD-T Scanner-CCTV-Camera Burner
Action: see detail...
Status: done
2024-12-30
393-RF6
Problem: Regrease motor
Action: see detail...
Status: done
2024-12-30
WORK-SHOP
Problem: Completing data PMR and WBI month december 2024
Action: see detail...
Status: done
2024-12-30
363-RM1-&-463-KL1
Problem: PMR service critical motor LSR RM-CM & KILN-COOLER
Action: see detail...
Status: done
2024-12-27
393-SC5
Problem: Observation relocation motion sensor
Action: see detail...
Status: done
2024-12-27
393-FV1-&-FV2
Problem: Indication lamp abnormal
Action: see detail...
Status: done
2024-12-27
493-AC1-R1
Problem: Replace TLS
Action: see detail...
Status: done
2024-12-27
483-2K1
Problem: Replace filter probe
Action: see detail...
Status: done
2024-12-27
ER3-&-ER4-
Problem: Observation planning pulling FO cable
Action: see detail...
Status: done
2024-12-27
LA3-PU1
Problem: Clean up area equipment IDO pump
Action: see detail...
Status: done
2024-12-26
MCC-ELECTRIC-ROOM-AREA-KILN
Problem: PMR clean up MCC ER all area kiln
Action: see detail...
Status: done
2024-12-26
463-2K1-&-443-2K1-&-BURNER-FLOOR-493-3B1
Problem: PMR service analyzer & WBI crane-hoist
Action: see detail...
Status: done
2024-12-26
443-PH1-L63-CM1
Problem: PMR service IR TAD-T Scanner-CCTV-Camera Burner & PMR service analyzer
Action: see detail...
Status: done
2024-12-24
493-FN1
Problem: Install red box LOTOTO panel
Action: see detail...
Status: done
2024-12-24
463-2K1-&-423-2K1
Problem: Reading fluctuation & PMR service CEMS
Action: see detail...
Status: done
2024-12-24
443-PH1-L63-CM1-363-RM1
Problem: WBI hoist and crane
Action: see detail...
Status: done
2024-12-23
463-KL1-RETURN-PUMP
Problem: Instalation CCTV, pulling UTP and configuration IP of CCTV view return pump
Action: see detail...
Status: done
2024-12-23
363-RM1-L63-CM1-463-KL1-473-CC1
Problem: PMR service critical motor LSR RM-CM-KL-COOLER
Action: see detail...
Status: done
2024-12-23
WORK-SHOP
Problem: Completing data PMR and WBI month december 2024
Action: see detail...
Status: done
2024-12-20
443-FN1-&-463-MD1-&-473-FA3-&-473-FA4
Problem: Check vibration and noise high
Action: see detail...
Status: done
2024-12-20
463-2K1
Problem: Relocation clean up of way
Action: see detail...
Status: done
2024-12-20
HRG
Problem: Observation level RO and leaked piping of HRG or WTP and solenoid
Action: see detail...
Status: done
2024-12-20
443-PH1
Problem: Check temperature IR TAD abnormal indication
Action: see detail...
Status: done
2024-12-20
363-BF1
Problem: Solenoid valve no 4 abnormal
Action: see detail...
Status: done
2024-12-20
ER5
Problem: Install CCTV at bottom ER5
Action: see detail...
Status: done
2024-12-20
463-KL1-RETURN-PUMP
Problem: Observation cable way and instalation CCTV point view return pump
Action: see detail...
Status: done
2024-12-19
ELECTRIC-ROOM
Problem: PMR clean up MCC all area kiln NR1
Action: see detail...
Status: done
2024-12-19
CCR
Problem: Observation dismantling or relocation cable power or data for new operator
Action: see detail...
Status: done
2024-12-19
L63-CM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-12-19
333-AC1-&-433-FN2
Problem: Check noise motor and refill grease
Action: see detail...
Status: done
2024-12-18
HRG
Problem: Observation leaked current
Action: see detail...
Status: done
2024-12-18
443-PH1
Problem: Clean up pipe diesel at 3rd floor and repainting
Action: see detail...
Status: done
2024-12-18
463-2K1-443-2K1-423-2K1
Problem: PMR service analyzer & PMR service CEMS
Action: see detail...
Status: done
2024-12-16
CAMERA-BURNER
Problem: Check camera burner
Action: see detail...
Status: done
2024-12-17
HRG
Problem: Observation level RO and repare leaked piping HRG
Action: see detail...
Status: done
2024-12-17
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-12-17
ER4
Problem: Pulling FO cable from ER4 to work shop
Action: see detail...
Status: done
2024-12-17
393-CP1
Problem: Install panel window
Action: see detail...
Status: done
2024-12-17
473-CC1-&-363-RM1
Problem: Replace battery Easylube fan cooler
Action: see detail...
Status: done
2024-12-17
WORK-SHOP
Problem: Completing data PMR and WBI month december 2024
Action: see detail...
Status: done
2024-12-09
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-12-10
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-12-10
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-12-16
463-EH1
Problem: Install hoist kiln
Action: see detail...
Status: done
2024-12-16
363-RM1-&-463-KL1
Problem: PMR service critical motor LSR RM-CM-KL-COOLER
Action: see detail...
Status: done
2024-12-13
483-BL1
Problem: problem trip no load
Action: see detail...
Status: done
2024-12-13
ER5-&-473-CC1
Problem: Activation CCTV
Action: see detail...
Status: done
2024-12-13
473-FN3-&-PULLING-CABLE-423-FN1
Problem: Replace bearing motor
Action: see detail...
Status: done
2024-12-13
463-2K1
Problem: Install cover protection heat from kiln
Action: see detail...
Status: done
2024-12-12
WORK-SHOP
Problem: Service welding machine
Action: see detail...
Status: done
2024-12-12
ER4
Problem: Project 423 FN1 & pulling cable re position
Action: see detail...
Status: done
2024-12-12
463-2K1
Problem: Observation IKGA for can retract probe from CCR and install flaver valve
Action: see detail...
Status: done
2024-12-12
493-AC1
Problem: Replace handle LCS that can be lock
Action: see detail...
Status: done
2024-12-12
WARE-HOUSE-SAND
Problem: Install lighting lamp
Action: see detail...
Status: done
2024-12-12
363-MD1
Problem: Replace carbon brush
Action: see detail...
Status: done
2024-12-12
473-CC1
Problem: Clean up area I/O panel and write data documentation power supply of I/O panel
Action: see detail...
Status: done
2024-12-11
ER4
Problem: Project 423 FN1
Action: see detail...
Status: done
2024-12-11
L63-CM1-&-363-HS1
Problem: Clean up area I/O panel and write power supply install up to 5 years
Action: see detail...
Status: done
2024-12-11
HRG
Problem: Install finger and ELGA sensor also repair cover
Action: see detail...
Status: done
2024-12-11
463-2K1
Problem: Observation IKGA for can retract probe from CCR
Action: see detail...
Status: done
2024-12-11
493-AC1
Problem: Replace pull cord switch
Action: see detail...
Status: done
2024-12-11
443-FN1
Problem: Observation auto balancer ( cable, coil ). part coil short, make sure process replacement
Action: see detail...
Status: done
2024-12-11
413-3B1&-3B2-&-WA-TER-RETURN-PUMP-KILN
Problem: Clean up all I/O panel area blending west & east also water return pump kiln I/O panel
Action: see detail...
Status: done
2024-12-10
463-2K1
Problem: Check leakage at sampling line
Action: see detail...
Status: done
2024-12-10
ER4
Problem: Project 423 FN1
Action: see detail...
Status: done
2024-12-10
493-AC1-&-AC2
Problem: Prepare LCS and continue welding point
Action: see detail...
Status: done
2024-12-10
463-KL1
Problem: PMR service critical motor LSR cooler and kiln
Action: see detail...
Status: done
2024-12-10
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-12-09
463-2K1
Problem: Service analyzer
Action: see detail...
Status: done
2024-12-09
WORK-SHOP
Problem: Completing notification for WBI top blending. CT, PH, Kiln
Action: see detail...
Status: done
2024-12-09
CCR
Problem: Pulling cable operator room
Action: see detail...
Status: done
2024-12-09
413-BLC
Problem: Check vibration and noise. Replace bearing motor
Action: see detail...
Status: done
2024-12-09
WORK-SHOP
Problem: Completing data PMR and WBI month december 2024
Action: see detail...
Status: done
2024-12-09
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2024-12-06
WORK-SHOP
Problem: Fabrication items HRG
Action: see detail...
Status: done
2024-12-06
433-PF1
Problem: TPM clean up area
Action: see detail...
Status: done
2024-12-06
363-MD1
Problem: PMR service carbon brush
Action: see detail...
Status: done
2024-12-06
473-FN4
Problem: High vibration 6 mm/s
Action: see detail...
Status: done
2024-12-06
363-FA2
Problem: Replace v belt
Action: see detail...
Status: done
2024-12-05
L63-BC2
Problem: Belt drift indication failure at CCR
Action: see detail...
Status: done
2024-12-05
WORK-SHOP
Problem: Fabrication or prepare welding point, cable position at coal mill. Cover PG at blending
Action: see detail...
Status: done
2024-12-05
423-2K1
Problem: PMR CEMS
Action: see detail...
Status: done
2024-12-05
443-PH1
Problem: WBI electrical and instrumentation top blending, pre heater and kiln
Action: see detail...
Status: done
2024-12-05
PMR-TRAFO-
Problem: PMR trafo check temperature use thermogun and write ampere motor also clean up area
Action: see detail...
Status: done
2024-12-04
393-B1-&-B3
Problem: Check membran
Action: see detail...
Status: done
2024-12-04
463-2K1-&-443-2K1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-12-04
363-RM1
Problem: WBI electrical & instrumentation panel I/O feed bin
Action: see detail...
Status: done
2024-12-04
HRG
Problem: Prepare CCTV
Action: see detail...
Status: done
2024-12-03
443-PH1
Problem: WBI electrical and instrumentation top blending, pre heater and kiln
Action: see detail...
Status: done
2024-12-03
493-AC1
Problem: Countinue Instalation welding point
Action: see detail...
Status: done
2024-12-03
HRG
Problem: YM HRG UTIS
Action: see detail...
Status: done
2024-12-03
463-KL1
Problem: PMR critical motor LSR kiln and cooler
Action: see detail...
Status: done
2024-12-02
393-RF6
Problem: High vibration motor 23 mm/s, noise 8 gE
Action: see detail...
Status: done
2024-12-02
WORK-SHOP
Problem: Completing data PMR and WBI month november 2024
Action: see detail...
Status: done
2024-12-02
443-PH1
Problem: PMR service temperature IR TAD, CCTV, T_scanner, camera burner
Action: see detail...
Status: done
2024-12-02
363-RM1
Problem: PMR critical motor LSR RM & CM
Action: see detail...
Status: done
2024-11-29
WORK-SHOP
Problem: Power for TV
Action: see detail...
Status: done
2024-11-29
HRG
Problem: Prepare piping N2 for test leaked of HRG
Action: see detail...
Status: done
2024-11-29
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-11-29
433-PF1
Problem: TPM clean up area
Action: see detail...
Status: done
2024-11-28
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-11-28
WORK-SHOP
Problem: Take 2 cable ( 2 husble ) 6P x 0.75 mm to electrical ware house and take FO cable for stop contact CCTV WS EL1
Action: see detail...
Status: done
2024-11-28
L93-SC1
Problem: Repair speed sensor
Action: see detail...
Status: done
2024-11-28
443-PH1;-L63-RM1;-463-KL1
Problem: PMR service temperature IR TAD, CCTV, T_scanner, camera burner
Action: see detail...
Status: done
2024-11-26
GCT-NR2-&-INDICATION-PRESSURE-COMPRESSOR-IOP
Problem: Help commisioning GCT NR2, puling cable tank to panel GCT
Action: see detail...
Status: done
2024-11-26
463-KL1
Problem: PMR service critical motor LSR KL & COOLER
Action: see detail...
Status: done
2024-11-26
WORK-SHOP
Problem: Completing data PMR and WBI month november 2024
Action: see detail...
Status: done
2024-11-25
473-AC1
Problem: Continue install welding panel
Action: see detail...
Status: done
2024-11-25
COMMISIOING-GCT-NR2
Problem: Help commisioning GCT NR2
Action: see detail...
Status: done
2024-11-25
WORK-SHOP
Problem: Completing data PMR and WBI month november 2024
Action: see detail...
Status: done
2024-11-25
363-RM1
Problem: PMR service critical motor LSR RM & CM
Action: see detail...
Status: done
2024-11-22
ER5-&-WORK-SHOP
Problem: Activation CCTV and continue wiring welding panel
Action: see detail...
Status: done
2024-11-22
CAMERA-BURNER
Problem: Service camera burner
Action: see detail...
Status: done
2024-11-22
363-RM1;-L63-CM;-443-EH1
Problem: WBI hoist and crane
Action: see detail...
Status: done
2024-11-21
ER5
Problem: Install CCTV from ER5 to cooler
Action: see detail...
Status: done
2024-11-21
L3A-BC3
Problem: Install lamp off
Action: see detail...
Status: done
2024-11-21
443-PH1
Problem: PMR service temperature IR TAD, CCTV, T_scanner, camera burner
Action: see detail...
Status: done
2024-11-21
413-3B1
Problem: WBI Bottom blending, burner floor, clinker silo
Action: see detail...
Status: done
2024-11-20
WORK-SHOP
Problem: Prepare welding panel 473 AC1
Action: see detail...
Status: done
2024-11-20
CCR
Problem: Keep it safe power operator CCR NR1 and survey cable FO
Action: see detail...
Status: done
2024-11-20
423-2K1
Problem: PMR service analyzer CEMS
Action: see detail...
Status: done
2024-11-20
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2024-11-19
BLENDING-WEST
Problem: Replace lighting lamp off
Action: see detail...
Status: done
2024-11-19
CCR
Problem: Relocation instalation operator room to engineer room
Action: see detail...
Status: done
2024-11-19
WORK-SHOP
Problem: Completing data WBI ,PMR month 9-10 and 11
Action: see detail...
Status: done
2024-11-18
WORK-SHOP
Problem: observation or replace bearing motor
Action: see detail...
Status: done
2024-11-18
WORK-SHOP
Problem: Prepare form calibration & stop WF. Completing data WBI or PMR month november 2024
Action: see detail...
Status: done
2024-11-18
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-11-18
463-KL1
Problem: PMR critical motor LSR kiln and cooler
Action: see detail...
Status: done
2024-11-15
WORK-SHOP
Problem: Prepare spare part for job saturday and observation replace bearing motor 363 BC1
Action: see detail...
Status: done
2024-11-15
L63-SC2-&-443-PH1-&-473-CC1
Problem: Install protection cover, support cable pre heater, dismantling or relocation part cable
Action: see detail...
Status: done
2024-11-15
483-2K1
Problem: Install temperature sensor
Action: see detail...
Status: done
2024-11-15
ER4
Problem: Investigation AUTO BALANCER trial from SLC NR2
Action: see detail...
Status: done
2024-11-14
ER4
Problem: AUTO balancer trip breaker or investigation problem. Documentation evidance
Action: see detail...
Status: done
2024-11-14
443-EL1-&-443-PH1
Problem: Continue connection elevator & support cable PH & dismantling cable at cooler
Action: see detail...
Status: done
2024-11-14
463-2K1
Problem: Repare or modified line cooling analyzer
Action: see detail...
Status: done
2024-11-13
WORK-SHOP
Problem: Prepare SOW and part material, relocation I/O blending, drawing bridge from ER6 to L3C RE1
Action: see detail...
Status: done
2024-11-13
L63-RM1-AND-463-2K1
Problem: PMR service analyzer and observation upgrade PLC analyzer
Action: see detail...
Status: done
2024-11-13
363-RM1
Problem: PMR service critical motor area RM
Action: see detail...
Status: done
2024-11-13
443-EL1-&-443-PH1
Problem: Continue repare support cable rel FN and connection cable of elevator also dismantling cable
Action: see detail...
Status: done
2024-11-13
WORK-SHOP
Problem: Complete data check sheet WBI Transformer month november 2024
Action: see detail...
Status: done
2024-11-12
463-2K1-&-443-2K1
Problem: PMT service analyzer
Action: see detail...
Status: done
2024-11-12
443-EL1-&-443-PH1
Problem: Replace or modification cable elevator. Support PH and lighting lamp
Action: see detail...
Status: done
2024-11-12
443-PH1-AND-WORK-SHOP
Problem: CCTV 3rd floor and install heat exchanger IKGA
Action: see detail...
Status: done
2024-11-12
463-KL1
Problem: PMR service critical motor LSR cooler and kiln
Action: see detail...
Status: done
2024-11-11
463-2K1
Problem: Check auto balancer
Action: see detail...
Status: done
2024-11-11
463-2K1
Problem: Check auto balancer
Action: see detail...
Status: done
2024-11-11
443-EL1;-443-PH1
Problem: Replace or modification cable elevator. Support PH and lighting lamp
Action: see detail...
Status: done
2024-11-11
L63-RM-&-443-PH1
Problem: Prepare CCTV RM & PH, install to operator CCR
Action: see detail...
Status: done
2024-11-08
463-KL1
Problem: Install CCTV kiln inlet and pulling cable UTP from local to ER4 also configuration
Action: see detail...
Status: done
2024-11-08
WORK-SHOP
Problem: Welding point prepare wiring and install panel welding
Action: see detail...
Status: done
2024-11-08
423-2K1
Problem: CGA CEMS
Action: see detail...
Status: done
2024-11-07
WORK-SHOP
Problem: Drawing layout room operator CCR
Action: see detail...
Status: done
2024-11-07
463-KL1
Problem: Relocation or prepare are shell cooling fan. Repare burn cable and relocation oanel
Action: see detail...
Status: done
2024-11-07
CCR-ENGINEERING-ROOM
Problem: observation or prepare engineering room become operator room for while
Action: see detail...
Status: done
2024-11-07
423-2K1
Problem: CGA CEMS
Action: see detail...
Status: done
2024-11-07
CCR
Problem: CCTV for coal mill still not clear picture
Action: see detail...
Status: done
2024-11-07
463-2K1
Problem: Reading O2 fluctuation and spike
Action: see detail...
Status: done
2024-11-06
483-PF1
Problem: Repare grounding point are CM and lighting at room pfister blinking
Action: see detail...
Status: done
2024-11-06
WORK-SHOP-&-CCR
Problem: CCTV problem can not see picture
Action: see detail...
Status: done
2024-11-06
423-2K1
Problem: CGA CEMS
Action: see detail...
Status: done
2024-11-06
HEAT-AXCHANGER-FAN-IKGA-&-TYRE-1--463-KL1
Problem: Continue install heat exchanger motor also test leakage and dismantling unuse cable
Action: see detail...
Status: done
2024-11-05
SHELL-COOLING-FAN-9-&-12
Problem: Install cable for fan
Action: see detail...
Status: done
2024-11-05
473-FA1,-FA2,-FA3,-FA6,-FA7,-FA8,-FA9
Problem: AUTO grease motor low level
Action: see detail...
Status: done
2024-11-05
463-2K1
Problem: Install heat exchanger. prepare support leader PH
Action: see detail...
Status: done
2024-11-05
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-11-05
443-EL1
Problem: PMR service elevator and WBI sump pump
Action: see detail...
Status: done
2024-11-05
463-KL1
Problem: PMR service critical motor and LSR kiln and cooler
Action: see detail...
Status: done
2024-11-05
WORK-SHOP
Problem: Prepare ISO 9001; check schedule and actual planning calibration also result; form inspection
Action: see detail...
Status: done
2024-11-04
363-MD1
Problem: Replace carbon brush
Action: see detail...
Status: done
2024-11-04
L63-RM1-
Problem: PMR critical motor raw mill and coal mill
Action: see detail...
Status: done
2024-11-04
463-2K1
Problem: Reparire or replace piping and tidy up line sample
Action: see detail...
Status: done
2024-11-01
WORK-SHOP
Problem: Replace bearing 393 FA5 and motor heat ex changer IKGA
Action: see detail...
Status: done
2024-11-01
WORK-SHOP
Problem: CCTV setting IP address
Action: see detail...
Status: done
2024-11-01
CCTV-BURNER
Problem: Clean up and check view
Action: see detail...
Status: done
2024-10-31
443-CT1
Problem: Dislodged level CT
Action: see detail...
Status: done
2024-10-31
463-KL1-AND-L63-RM1
Problem: Camera CTTV view problem
Action: see detail...
Status: done
2024-10-31
413-3B1-PG1-&-443-PH1-2ND-FLOOR
Problem: Fabrication cover solenoid valve PG and support cable at 2nd floor pre heater
Action: see detail...
Status: done
2024-10-31
473-GC1
Problem: Dismantling unuse cable, tubing and pipe
Action: see detail...
Status: done
2024-10-30
443-EL1
Problem: Observation prepare replace cable power of elevator
Action: see detail...
Status: done
2024-10-30
413-3B1-&-3B2
Problem: Install cover PG of solenoid valve
Action: see detail...
Status: done
2024-10-30
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-30
443-EL1
Problem: Stand bye
Action: see detail...
Status: done
2024-10-29
473-CC1
Problem: Observation cleaning cable tray
Action: see detail...
Status: done
2024-10-29
PREPARE-SOW
Problem: Moving I/O west & east blending to ER4 also compressor. Bridge ER6 to L3C RE1
Action: see detail...
Status: done
2024-10-29
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-29
SWITCH-GEAR
Problem: Clean area switch gear from grass
Action: see detail...
Status: done
2024-10-28
493-BF1
Problem: Check 1 solenoid valve abnormal, replace module
Action: see detail...
Status: done
2024-10-28
L62-2K2
Problem: Install temperature sensor
Action: see detail...
Status: done
2024-10-28
463-KL1-AND-473-FA1,FA2,FA3
Problem: PMR service critical motor LSR kiln and cooler also grease low at fan cooler
Action: see detail...
Status: done
2024-10-28
413-PF1-TPM
Problem: completing data dash board for safety, FI
Action: see detail...
Status: done
2024-10-25
413-PF1-TPM-
Problem: Clean up area TPM, completing data report FI
Action: see detail...
Status: done
2024-10-25
393-FA5A
Problem: Motor noise
Action: see detail...
Status: done
2024-10-25
WORK-SHOP
Problem: Cek and completing data PMR and WBI month of october 2024
Action: see detail...
Status: done
2024-10-25
463-KL1
Problem: Dismantling part kiln and install cover motor
Action: see detail...
Status: done
2024-10-24
493-3B1
Problem: Install cover motor
Action: see detail...
Status: done
2024-10-24
L63-2K1-&-393-FA-5A
Problem: Install temperature sensor and monitoring vibration
Action: see detail...
Status: done
2024-10-24
423-2K1-&-463-2K1
Problem: PMR service CEMS and monitoring leaked at IKGA
Action: see detail...
Status: done
2024-10-24
413--PF1-TPM-ASSESTMENT
Problem: Clean up area fan and write file safety
Action: see detail...
Status: done
2024-10-23
393-FAA
Problem: Continue addressing K,T,D R slide gate
Action: see detail...
Status: done
2024-10-23
363-RM1
Problem: PMR service critical motor and LSR RM also CM
Action: see detail...
Status: done
2024-10-23
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-23
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-23
WORK-SHOP-MECHANIC
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-10-22
393-FA9;-473-CC1;-493-3S1;-413-3S1-3S2
Problem: Continue install tandem motor, pulling cable cooler, install cover motor and sealing I/O panel blending
Action: see detail...
Status: done
2024-10-22
463-KL1
Problem: PMR service critical motor and LSR KILN & COOLER
Action: see detail...
Status: done
2024-10-22
493-3S1;-473-CC1;-463-KL1;-443-PH1;-L63-CM1;-363-RM1;-FEED-BIN
Problem: Inspection electrical and welding yellow color belong to contractor and company Nr1
Action: see detail...
Status: done
2024-10-21
443-PH1-6TH-FLOOR-AND-4TH-FLOOR
Problem: Dismantling cooling fan and observation air lancing cyclone 3
Action: see detail...
Status: done
2024-10-21
393-FA9,-413-BS1-413-BS1-493-BS1
Problem: Continue install tandem motor, support project cleaning and install cover motor, install seal panel I/O
Action: see detail...
Status: done
2024-10-21
WORK-SHOP-MECHANIC
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-10-18
393-FA9
Problem: Prepare LCS and accessories and cable 6P x 0.75 mm
Action: see detail...
Status: done
2024-10-18
443-PH1-8TH-FLOOR
Problem: Observation problem at wince
Action: see detail...
Status: done
2024-10-18
L1C-PU1
Problem: Install pneumatic valve test
Action: see detail...
Status: done
2024-10-18
443-PH1-3RD-FLOOR
Problem: Air lancing observation activation
Action: see detail...
Status: done
2024-10-17
WORK-SHOP
Problem: Prepare or reinstall CCTV
Action: see detail...
Status: done
2024-10-17
HRG-LAMP
Problem: Observation reactivation timer for lamp
Action: see detail...
Status: done
2024-10-17
WORK-SHOP
Problem: Bring motor RTS to ware house
Action: see detail...
Status: done
2024-10-17
L1C-PV1
Problem: Observation proportional valve
Action: see detail...
Status: done
2024-10-17
L3C-RE1-
Problem: Install temperature sensor at ER6
Action: see detail...
Status: done
2024-10-16
WORK-SHOP
Problem: Prepare BOQ for job I/O blending to ER4
Action: see detail...
Status: done
2024-10-16
L1C-BC5
Problem: Check functional of sump pump information often trip
Action: see detail...
Status: done
2024-10-16
WORK-SHOP
Problem: Motor RTS
Action: see detail...
Status: done
2024-10-16
WORK-SHOP
Problem: Name TAG tools electrical and welding
Action: see detail...
Status: done
2024-10-16
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-10-15
L63-RM1-
Problem: Repaire lamp cable at floor of coal mill
Action: see detail...
Status: done
2024-10-15
463-KL1
Problem: PMR service critical motor and LSR KILN & COOLER
Action: see detail...
Status: done
2024-10-15
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-15
L63-RM1-STOP
Problem: Replace RTD sensor
Action: see detail...
Status: done
2024-10-14
393-FA1,FA2,FA3
Problem: Pulling cable motor
Action: see detail...
Status: done
2024-10-14
L63-RM1-AND-WORK-SHOP
Problem: Repair way of lamp and pulling UTP from I/O RM to work shop
Action: see detail...
Status: done
2024-10-14
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2024-10-14
WORK-SHOP
Problem: Arrange data spare part
Action: see detail...
Status: done
2024-10-11
393-FA5-A
Problem: Replace motor
Action: see detail...
Status: done
2024-10-11
WARE-HOUSE-ELECTRIC-NEAR-ER5
Problem: Continue tidy up spare part
Action: see detail...
Status: done
2024-10-11
WORK-SHOP
Problem: Continue activation CCTV & tidy up spare part
Action: see detail...
Status: done
2024-10-11
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-10
ER5-AND-CLINKER-SILO
Problem: Support work at ER5 and install cover motor clinker silo
Action: see detail...
Status: done
2024-10-10
IR-TAD,-T-SCANNER,-CCTV-AND-PYROMETER
Problem: PMR service
Action: see detail...
Status: done
2024-10-10
463-2K1
Problem: Observation spike O2 at IKGA
Action: see detail...
Status: done
2024-10-10
363-RM1-&-443-PH1-&-L63-RM1
Problem: Observation recondition and rewinding motor
Action: see detail...
Status: done
2024-10-09
ER5-&-MOTOR-AREA-CLINKER
Problem: Tidy up spare part and motor
Action: see detail...
Status: done
2024-10-09
463-KL1
Problem: PMR service critical motor LSR cooler
Action: see detail...
Status: done
2024-10-09
363-CV1
Problem: Observation speed indication
Action: see detail...
Status: done
2024-10-09
463-2K1-&-443-2K1-AND-REPLACE-TE-463-KL1-T1-FABRICATION
Problem: PMR service analyzer and reading temperature abnormal
Action: see detail...
Status: done
2024-10-08
393-FA5-A
Problem: Replace bearing, install after mechanic cleaning blade
Action: see detail...
Status: done
2024-10-08
WORK-SHOP
Problem: TIDY UP SPARE PART
Action: see detail...
Status: done
2024-10-08
413-3B1,-473-CC1,-493-3S1
Problem: WBI eletrical & instrumentation I/O sump pump
Action: see detail...
Status: done
2024-10-08
TRUBA-JAGA-CITA
Problem: Inspection electrical and welding machine
Action: see detail...
Status: done
2024-10-08
413-RV1
Problem: Failure indication
Action: see detail...
Status: done
2024-10-07
443-EL1
Problem: PMR service elevator and sump pump E1
Action: see detail...
Status: done
2024-10-07
363-RM1,-443-PH1,-L63-RM1
Problem: Observation recondition motor for over haul 2025
Action: see detail...
Status: done
2024-10-07
363-RM1
Problem: PMR service critical motor LSR RM-CM
Action: see detail...
Status: done
2024-10-07
WORK-SHOP
Problem: Tidy up spare part inside room
Action: see detail...
Status: done
2024-10-07
WORK-SHOP
Problem: Inspection electrical and welding machine of mechanic NR1
Action: see detail...
Status: done
2024-10-04
WORK-SHOP
Problem: Tidy up spare part
Action: see detail...
Status: done
2024-10-04
INSTALL-CAMERA
Problem: Activated camera
Action: see detail...
Status: done
2024-10-04
L3C-HP1
Problem: Repaire seat start button and observation recondition motor
Action: see detail...
Status: done
2024-10-04
423-2K1
Problem: Observation hydrogen ( H2 ) leaked
Action: see detail...
Status: done
2024-10-03
WORK-SHOP
Problem: Check and completing data WBI also PMR month september 2024 and tidy up spare part
Action: see detail...
Status: done
2024-10-03
363-RM1,-443-PH1,-L63-RM1
Problem: Observation motor for recondition OH 2025
Action: see detail...
Status: done
2024-10-03
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-10-03
363-RM1
Problem: PMR service critical motor LSR RM & CM
Action: see detail...
Status: done
2024-10-02
WORK-SHOP
Problem: Completing data spare part
Action: see detail...
Status: done
2024-10-02
413-BF1
Problem: CHeck solenoid valve ubnormal
Action: see detail...
Status: done
2024-10-02
WELDING-PANEL-BURNER-FLOOR
Problem: Replace ELCB
Action: see detail...
Status: done
2024-10-02
SUPPORT-FEED-ON-KILN
Problem: Support feed on area RMK
Action: see detail...
Status: done
2024-10-01
473-FN7
Problem: Replace motor M2 and tacho meter
Action: see detail...
Status: done
2024-10-01
473-FN7-&-463-MD1
Problem: Clean up motor and filter
Action: see detail...
Status: done
2024-10-01
CAMERA-KILN-&-483-PF1
Problem: Stand by monitor camera kiln and check position counter weigh or oil drum and reponse load cell
Action: see detail...
Status: done
2024-10-01
WORK-SHOP
Problem: Replace bearing motor and test run motor
Action: see detail...
Status: done
2024-09-30
393-RF6
Problem: Service motor
Action: see detail...
Status: done
2024-09-30
CAMERA-PYROMETER-&-453-PF1
Problem: Service camera burner and stand by monitor pfister feeder
Action: see detail...
Status: done
2024-09-30
443-CT1
Problem: Relocation horn
Action: see detail...
Status: done
2024-09-30
SUPPORT-BLACK-OUT-
Problem: Support black out at ER3, ER4 and ER5
Action: see detail...
Status: done
2024-09-30
WORK-SHOP
Problem: Completing TAG WBI & PMR
Action: see detail...
Status: done
2024-09-30
MAIN-GATE-ACCES-CONTRO
Problem: Inspection electrical and welding tools of RMP
Action: see detail...
Status: done
2024-09-29
453-PF1
Problem: Calibration pfister feeder
Action: see detail...
Status: done
2024-09-29
393-SC3
Problem: Relocation cable motor
Action: see detail...
Status: done
2024-09-29
WORK-SHOP
Problem: move ex box WBI & PMR year 2015 to 2019 to warehouse of electric near ER5
Action: see detail...
Status: done
2024-09-29
413-3S1-&-3S2-&-463-WP-ROOM
Problem: Clean up I/O panel
Action: see detail...
Status: done
2024-09-27
423-2K1
Problem: Continue installation filter CEMS
Action: see detail...
Status: done
2024-09-27
463-2K1
Problem: Service analyzer
Action: see detail...
Status: done
2024-09-27
L63-RM1-
Problem: WBI welding and lighting panel
Action: see detail...
Status: done
2024-09-27
WORK-SHOP
Problem: Completing file spare part and name form of WBI-PMR
Action: see detail...
Status: done
2024-09-26
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-09-26
393-3B1-&-3B2
Problem: Install cover motor area blending silo
Action: see detail...
Status: done
2024-09-26
463-KL1
Problem: PMR service critical motor and LSR
Action: see detail...
Status: done
2024-09-26
443-FN1-&-433-RF1
Problem: Replace LCS
Action: see detail...
Status: done
2024-09-26
WORK-SHOP
Problem: Completing file spare part and clean up room of spare part
Action: see detail...
Status: done
2024-09-25
4W3-INT-&-3W3-IN1-ROOM-WEIGH-FEEDER-CONTROL
Problem: Repaire AUDIT finding
Action: see detail...
Status: done
2024-09-25
3W3-IN8-IN6-&-INB
Problem: Repaire AUDIT finding
Action: see detail...
Status: done
2024-09-25
WORK-SHOP
Problem: Completing data WBI & PMR, sorting spare part, HAC
Action: see detail...
Status: done
2024-09-24
WORK-SHOP
Problem: Fabrication cover motor area blending silo
Action: see detail...
Status: done
2024-09-24
WORK-SHOP
Problem: Fabrication box panel and install CCTV
Action: see detail...
Status: done
2024-09-24
WORK-SHOP-
Problem: Completing data WBI & PMR, clean up spare part
Action: see detail...
Status: done
2024-09-24
ER4-&-ER5
Problem: Check for ISO 45000
Action: see detail...
Status: done
2024-09-24
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-23
393-SC1
Problem: Move position LCS
Action: see detail...
Status: done
2024-09-23
L3A-BC1
Problem: Check condition motor due oil leakage
Action: see detail...
Status: done
2024-09-23
463-MD1-M1
Problem: Clean up carbon brush
Action: see detail...
Status: done
2024-09-23
413-3S1-&-3S2
Problem: Clean up area motor
Action: see detail...
Status: done
2024-09-23
463-LQ3-M1
Problem: Check motor condition due vibration and noise too high
Action: see detail...
Status: done
2024-09-23
363-RM1
Problem: WBI panel welding and lighting
Action: see detail...
Status: done
2024-09-23
463-2K1
Problem: Install cove and completing piping
Action: see detail...
Status: done
2024-09-23
363-RM1
Problem: PMR critical motor, LSR Raw Mill & Coal Mill
Action: see detail...
Status: done
2024-09-20
WORK-SHOP
Problem: House keeping area inside
Action: see detail...
Status: done
2024-09-18
WORK-SHOP
Problem: Prepare BOQ for relocation I/O to ER4
Action: see detail...
Status: done
2024-09-19
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-19
473-FN5
Problem: Refill memolube
Action: see detail...
Status: done
2024-09-19
463-2K1
Problem: Fabrication cover pneumatic
Action: see detail...
Status: done
2024-09-19
ER5-
Problem: Replace battery UPS
Action: see detail...
Status: done
2024-09-18
ER5
Problem: Replace battery UPS take 1 from ER2
Action: see detail...
Status: done
2024-09-18
WORK-SHOP
Problem: Service lighting lamp off at L3C RE1
Action: see detail...
Status: done
2024-09-18
L63-RM1
Problem: WBI electric and instrumentation Input/Output panel
Action: see detail...
Status: done
2024-09-18
463-2K1
Problem: Analyze problem analyzer
Action: see detail...
Status: done
2024-09-17
433-M33-WP1
Problem: Install relay lighting
Action: see detail...
Status: done
2024-09-17
393-SCA
Problem: Check motor noise and vibration
Action: see detail...
Status: done
2024-09-17
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-17
443-PH1
Problem: Dismantling or relocation cable at 7th floor
Action: see detail...
Status: done
2024-09-13
473-FA3
Problem: Add grease motor
Action: see detail...
Status: done
2024-09-13
473-GQ1
Problem: WBI bottom blending, cooler, clinker silo, kiln
Action: see detail...
Status: done
2024-09-13
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-13
HRG
Problem: Clean up filter
Action: see detail...
Status: done
2024-09-12
L63-RM1-
Problem: Install auto drain
Action: see detail...
Status: done
2024-09-12
443-PH1
Problem: WBIGCT, PH,KILN
Action: see detail...
Status: done
2024-09-12
L1C-RE1-
Problem: Replace lighting lamp at north side
Action: see detail...
Status: done
2024-09-12
363-RM1
Problem: WBI feed bin, RM, BF
Action: see detail...
Status: done
2024-09-12
L3C-RE1
Problem: Replace lighting lamp pole north side
Action: see detail...
Status: done
2024-09-12
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-09-12
363-RM1-PM-STOP
Problem: Check and service carbon brush
Action: see detail...
Status: done
2024-09-12
493-BF1,-493-GF2,-493-BF3,493-BF4,-493-BF5
Problem: Cross check functional bag filter and measure ampere motor
Action: see detail...
Status: done
2024-09-10
463-WP
Problem: Check panel lighting can not stop if already start
Action: see detail...
Status: done
2024-09-10
363-RM1
Problem: Cross check bag filter 363 BF1, 393 BF1, 393 BF2, 393 BF3, & 423 BF1
Action: see detail...
Status: done
2024-09-10
463-KL1
Problem: Cross check bag filter 413 BF1, 413 BF2, 413 BF3, 433 BF1 & 483 BF1
Action: see detail...
Status: done
2024-09-10
HRG
Problem: Clean up area and filter
Action: see detail...
Status: done
2024-09-09
FEED-BIN
Problem: Data recondition motor
Action: see detail...
Status: done
2024-09-09
463-2K1-AND-443-2K1
Problem: PMR service analyzer and reading O2 abnormal
Action: see detail...
Status: done
2024-09-09
463-KL1
Problem: PMR service critical motor and LSR kiln and cooler
Action: see detail...
Status: done
2024-09-09
423-BF1
Problem: Replace lighting lamp that are off
Action: see detail...
Status: done
2024-09-06
BOTTOM-CT
Problem: Move or relocation cable transmitter
Action: see detail...
Status: done
2024-09-06
WORK-SHOP
Problem: Install camera monitoring
Action: see detail...
Status: done
2024-09-06
423-FN1-
Problem: GEMBA TPM
Action: see detail...
Status: done
2024-09-05
AFR
Problem: Replace lamp lighting off at pole 443 FN1
Action: see detail...
Status: done
2024-09-05
393-SC1-&-393-SC7-&-393-SC8
Problem: Move cable for transmitter and cable LCS
Action: see detail...
Status: done
2024-09-05
443-Z4B-T1-&-443-Z4A-T2
Problem: Cross check temperature indication
Action: see detail...
Status: done
2024-09-04
423-2K1-&-HRG
Problem: Check hydrogen and check HRG
Action: see detail...
Status: done
2024-09-03
WORK-SHOP
Problem: Continue completing focus improvement
Action: see detail...
Status: done
2024-09-03
473-GQ1
Problem: WBI hoist crane 473 EH1, 473 EH2, 473 EH3, 473 EH4, 473 EH5, 493 EH1, L1C EH1 & L1C EH2
Action: see detail...
Status: done
2024-09-03
393-SCB
Problem: Relocation cable track
Action: see detail...
Status: done
2024-09-03
393-AS7-&-433-FN1
Problem: Check vibration and noise motor
Action: see detail...
Status: done
2024-09-04
393-SC8-&-SC9
Problem: Relocation cable LCS
Action: see detail...
Status: done
2024-09-04
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-04
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-09-02
WBI-HOIST-CRANE
Problem: 363 CA1, L63 EH1, 443 EH1, 333 EH1, 363 EH1, 423 EH1
Action: see detail...
Status: done
2024-09-02
463-KL1
Problem: PMR service critical and DC motor
Action: see detail...
Status: done
2024-09-02
393-SCB
Problem: Relocation track of cable
Action: see detail...
Status: done
2024-09-02
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-08-30
423-FN1
Problem: Completing data TPM, move place of equipment cleaning tools and place from kiln to 423 FN1, house keeping
Action: see detail...
Status: done
2024-08-30
ER6
Problem: House keeping area electric room outside
Action: see detail...
Status: done
2024-08-27
433-BE1
Problem: Check noise motor high
Action: see detail...
Status: done
2024-08-27
393-SCA
Problem: Prepare relocation LCS
Action: see detail...
Status: done
2024-08-27
423-2K1
Problem: YM CEMS accompany KISS employee
Action: see detail...
Status: done
2024-08-27
363-RM1
Problem: Connect cable RTD at I/O panel
Action: see detail...
Status: done
2024-08-26
363-MD1-M1
Problem: Pulling cable 6P x 0.75 mm from motor to panel I/O
Action: see detail...
Status: done
2024-08-26
463-KL1
Problem: PMR service critical and DC motor
Action: see detail...
Status: done
2024-08-26
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-08-26
WORK-SHOP
Problem: Inspection electrical and welding machine
Action: see detail...
Status: done
2024-08-23
WORK-SHOP-MECHANIC
Problem: Machine roller often trip
Action: see detail...
Status: done
2024-08-23
L33-BC2
Problem: Check belt speed rate
Action: see detail...
Status: done
2024-08-23
473-FA6
Problem: Relocation pressure transmitter and lighting lamp
Action: see detail...
Status: done
2024-08-23
423-2K1
Problem: YM CEMS accompany KISS employee
Action: see detail...
Status: done
2024-08-22
WORK-SHOP
Problem: Drawing panel weigh feeder coal
Action: see detail...
Status: done
2024-08-22
423-2K1
Problem: YM CEMS accompany KISS employee
Action: see detail...
Status: done
2024-08-22
443-PH1
Problem: Install motor air blaster
Action: see detail...
Status: done
2024-08-22
ER3-&-ER4-&-ER5
Problem: Check battery UPS fault indication
Action: see detail...
Status: done
2024-08-21
L63-RM1-
Problem: WBI electric and instrumentation I/O, sump pump, T&T
Action: see detail...
Status: done
2024-08-21
413-BL2
Problem: Replace handle LCS
Action: see detail...
Status: done
2024-08-21
363-BF1
Problem: Activation drain
Action: see detail...
Status: done
2024-08-21
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-20
363-RM1-PM-STOP-333-AC1-& 333 MS1 & 333 WF1
Problem: Check motor
Action: see detail...
Status: done
2024-08-20
363-WP1-M1
Problem: Test run and addressing compare between I/O panel and CCR
Action: see detail...
Status: done
2024-08-20
393-FV1
Problem: Replace solenoid valve
Action: see detail...
Status: done
2024-08-20
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-08-19
433-RF1
Problem: Install hand reel that which can be removed
Action: see detail...
Status: done
2024-08-19
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-08-19
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-19
423-2K1
Problem: Reading VOC is failure
Action: see detail...
Status: done
2024-08-19
CHANGE-HOUSE-PRODUCTION
Problem: Replace LED lamp
Action: see detail...
Status: done
2024-08-16
L3C-RE1
Problem: PM fix cabin door drag when open & panel cabin control PLC, clean up panel control reel, install chain at cable trolly harrow, replace lighting lamp and reposition lamp
Action: see detail...
Status: done
2024-08-15
463-KL1
Problem: WBI bottom blending, cooler, clinker silo, kiln
Action: see detail...
Status: done
2024-08-14
L63-BF1-T1
Problem: Measurement temperature abnormal to low
Action: see detail...
Status: done
2024-08-14
L63-WF1
Problem: Fabrication box panel
Action: see detail...
Status: done
2024-08-15
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-15
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-14
463-KL1
Problem: WBI top blending, CT, Pre heater and KILN
Action: see detail...
Status: done
2024-08-13
WORK-SHOP-MECHANIC
Problem: Test run motor ex L94 SC5 plan use at 363 BC1
Action: see detail...
Status: done
2024-08-13
SPARE-363-FN2
Problem: Install panel and connect heater
Action: see detail...
Status: done
2024-08-13
483-BL4-AND-483-BL5
Problem: Greasing and motor fan noise
Action: see detail...
Status: done
2024-08-13
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-08-13
363-RM1
Problem: WBI area raw mill, feed bin and bag filter,CT
Action: see detail...
Status: done
2024-08-12
483-FA2,-483-BL1,-453-BL1
Problem: Add grease motor
Action: see detail...
Status: done
2024-08-12
WORK-SHOP
Problem: 463 KL1 T1 repaire house TE thermocouple kiln
Action: see detail...
Status: done
2024-08-12
443-PH1
Problem: PMR service IR TAD, T scanner, CCTV and pyrometer
Action: see detail...
Status: done
2024-08-12
463-KL1
Problem: PMR service critical and DC motor
Action: see detail...
Status: done
2024-08-12
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-08-09
473-SC1
Problem: clean up area motor and install cover motor
Action: see detail...
Status: done
2024-08-09
363-MD1
Problem: Clean up carbon brush, motor and filter motor, measure long of carbon brush
Action: see detail...
Status: done
2024-08-09
363-BC1
Problem: Replace bearing motor
Action: see detail...
Status: done
2024-08-09
423-FN1
Problem: Clean up bearing LS and fix motor. Install box ex cable RTD west side motor, clean up bearing fan free side
Action: see detail...
Status: done
2024-08-08
WORK-SHOP
Problem: Continue drawing I/O
Action: see detail...
Status: done
2024-08-08
423-2K1
Problem: Continue project
Action: see detail...
Status: done
2024-08-08
WEST-&-EAST-BLENDING-BOTTOM
Problem: Replace lighting lamp off
Action: see detail...
Status: done
2024-08-08
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-08
463-KL1
Problem: PMR service pyrometer, t_scanner, IR temperature, cCTV
Action: see detail...
Status: done
2024-08-07
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-08-07
443-CT1
Problem: Check all solenoid water and air
Action: see detail...
Status: done
2024-08-07
443-EL1
Problem: Service problem at elevator
Action: see detail...
Status: done
2024-08-07
473-FN7-&-463-MD1
Problem: Add grease motor
Action: see detail...
Status: done
2024-08-07
473-HC1-&-COOLER-FAN
Problem: Add grease motor
Action: see detail...
Status: done
2024-08-06
443-FN1
Problem: Temperature bearing is high around 82 degree celcius
Action: see detail...
Status: done
2024-08-06
423-2K1
Problem: PMR service CEMS and pulling cable
Action: see detail...
Status: done
2024-08-06
363-FN1
Problem: Pulling cable 5x35m at FM Nr1
Action: see detail...
Status: done
2024-08-05
443-W1-M1-AND-M3
Problem: Check vibration, noise and free and load side motor
Action: see detail...
Status: done
2024-08-05
423-2K1
Problem: Continue job at CEMS
Action: see detail...
Status: done
2024-08-05
463-KL1
Problem: PMR service critical and DC motor
Action: see detail...
Status: done
2024-08-05
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-08-02
423-FN1
Problem: Install box ex cable RTD and house keeping
Action: see detail...
Status: done
2024-08-02
453-BL1
Problem: Replace lighting lamp off
Action: see detail...
Status: done
2024-08-02
363-FN2
Problem: Install or connect power heater at Finish Mill I
Action: see detail...
Status: done
2024-08-02
483-BF1
Problem: Repaire tubing
Action: see detail...
Status: done
2024-08-01
L1C-BC4
Problem: Replace memolube
Action: see detail...
Status: done
2024-08-01
423-FN1
Problem: TPM close hole plat form and install box ex cable RTD at west side motor
Action: see detail...
Status: done
2024-08-01
WARE-HOUSE
Problem: Continue connect cable power heater motor
Action: see detail...
Status: done
2024-08-01
EXCHANGER-FAN
Problem: Clean up area motor
Action: see detail...
Status: done
2024-07-31
EXCHANGER-FAN
Problem: Clean up area motor
Action: see detail...
Status: done
2024-07-31
HEAT-AXCHANGER-FAN
Problem: Clean up area motor
Action: see detail...
Status: done
2024-07-31
L63-RM1
Problem: PMR service coal mill
Action: see detail...
Status: done
2024-07-31
PUMP-LOADING-SOLAR
Problem: Error can not start and install sign for motor and MCC
Action: see detail...
Status: done
2024-07-31
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-30
493-FN5
Problem: Vibration motor is high
Action: see detail...
Status: done
2024-07-30
HEAT-EXCHANGER-
Problem: Continue clean up motor
Action: see detail...
Status: done
2024-07-30
463-KL1
Problem: PMR service mv motor
Action: see detail...
Status: done
2024-07-31
WARE-HOUSE
Problem: Continue connect cable heater
Action: see detail...
Status: done
2024-07-30
363-GD1
Problem: Clean up motor
Action: see detail...
Status: done
2024-07-30
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-07-30
483-BL7-AND-BL9
Problem: Replace catridge and install easy lube
Action: see detail...
Status: done
2024-07-29
HEAT-EXCHANGER-
Problem: Clean up motor
Action: see detail...
Status: done
2024-07-29
473-FA6
Problem: Check vibration sensor n1 error indication
Action: see detail...
Status: done
2024-07-30
423-FN1-
Problem: Completing data TPM
Action: see detail...
Status: done
2024-07-29
473-GQ1
Problem: Add grease motor
Action: see detail...
Status: done
2024-07-29
363-RM1
Problem: PMR service mv motor
Action: see detail...
Status: done
2024-07-26
L3C-RE1
Problem: Completing data focus improvement
Action: see detail...
Status: done
2024-07-26
423-FN1
Problem: TPM Completing data dash board
Action: see detail...
Status: done
2024-07-26
423-FN1
Problem: Completing, clean up and install
Action: see detail...
Status: done
2024-07-26
L63-WF1
Problem: Continue fabricated support belt drift
Action: see detail...
Status: done
2024-07-26
393-RF6
Problem: Replace bearing motor, seal and fan motor. Install at site
Action: see detail...
Status: done
2024-07-26
493-AC2
Problem: Replace handle LCS
Action: see detail...
Status: done
2024-07-25
463-MD1
Problem: Add grease
Action: see detail...
Status: done
2024-07-25
L63-WF1
Problem: Continue fabrication support belt drift
Action: see detail...
Status: done
2024-07-25
HRG
Problem: Continue trouble shoot problem
Action: see detail...
Status: done
2024-07-25
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-25
464-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-25
483-FA1
Problem: Replace tank of auto grease
Action: see detail...
Status: done
2024-07-25
453-BL1-&-483-BL1
Problem: Add grease at free and load side motor
Action: see detail...
Status: done
2024-07-24
463-MD1
Problem: Check carbon brush
Action: see detail...
Status: done
2024-07-24
WARE-HOUSE
Problem: Continue install cable heater to big motor
Action: see detail...
Status: done
2024-07-24
L63-WF1
Problem: Continue fabrication support belt drift
Action: see detail...
Status: done
2024-07-24
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-07-24
L63-RM1
Problem: WBI area Coal Mill, truck lift, tripper, reclaimer coal mill, clinker silo
Action: see detail...
Status: done
2024-07-24
L1C-BC4
Problem: Replace belt drift
Action: see detail...
Status: done
2024-07-23
473-FN4
Problem: Motor over load
Action: see detail...
Status: done
2024-07-23
473-FA6
Problem: Replace vibration sensor
Action: see detail...
Status: done
2024-07-23
L63-SR1
Problem: Repair cover fan
Action: see detail...
Status: done
2024-07-23
L63-SX1
Problem: Check alignment motor
Action: see detail...
Status: done
2024-07-23
HRG-CHILLER
Problem: Service cover chiller HRG
Action: see detail...
Status: done
2024-07-23
363-BE1
Problem: Discouple coupling, test no load and noise motor
Action: see detail...
Status: done
2024-07-23
463-MD1
Problem: Clean up carbon brush, motor and filter motor, measure long of carbon brush
Action: see detail...
Status: done
2024-07-23
483-BL2-&-453-BL1
Problem: Install fan cooling motor and replace motor blower
Action: see detail...
Status: done
2024-07-22
483-BL2-&-453-BL2
Problem: Replace fan cooling motor and replace blower cooling motor
Action: see detail...
Status: done
2024-07-22
483-RF1-AND-483-RF2
Problem: recondition motor because oil come to motor
Action: see detail...
Status: done
2024-07-22
453-SG1-&-453-BV1
Problem: Solenoid valve stuck for SG and connect bV1
Action: see detail...
Status: done
2024-07-22
L63-WF1
Problem: Fabrication belt drift weight feeder
Action: see detail...
Status: done
2024-07-22
WARE-HOUSE
Problem: Continue connect cable power input, cable heater to motor
Action: see detail...
Status: done
2024-07-22
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-22
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-07-22
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-07-19
423-2K1
Problem: CEMS problem at temperature indication
Action: see detail...
Status: done
2024-07-19
WARE-HOUSE
Problem: Install panel lighting for heater power
Action: see detail...
Status: done
2024-07-19
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-07-19
423-FN1
Problem: Take data for TPM
Action: see detail...
Status: done
2024-07-19
473-GQ1
Problem: WBI electrical and instrumentation bottom blending, cooler, clinker silo
Action: see detail...
Status: done
2024-07-19
443-PH1
Problem: WBI electrical and instrumentation top blending, GCT, CT, pre heater, kiln, burner floor
Action: see detail...
Status: done
2024-07-18
333-AC1;-363-BC1
Problem: Install auto grease
Action: see detail...
Status: done
2024-07-18
363-FA2-AND-363-MD-1
Problem: Clean up filter and carbon brush room man drive
Action: see detail...
Status: done
2024-07-18
363-FN1;363-FN2
Problem: Clean up bearing motor free and load side
Action: see detail...
Status: done
2024-07-18
333-AC1;-333-WF1;-363-BE1;-363-CV1;-393-SC8
Problem: Check noise bearing motor, discouple coupling if posible
Action: see detail...
Status: done
2024-07-18
363-BC1
Problem: Check safety device and noise bearing motor
Action: see detail...
Status: done
2024-07-18
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-17
L63-WF1
Problem: Check or replace lighting lamp are off
Action: see detail...
Status: done
2024-07-17
463-KL1
Problem: PMR service medium voltage motor are kiln and coal mill
Action: see detail...
Status: done
2024-07-17
443-PR1-T3
Problem: Pulling cable purging
Action: see detail...
Status: done
2024-07-17
363-RM1
Problem: WBI area raw mill, feed bin and bag filter
Action: see detail...
Status: done
2024-07-16
473-FA1,FA2,FA3,FA4,FA6,FA8,FA9
Problem: Level auto grease low
Action: see detail...
Status: done
2024-07-16
L63-RM1
Problem: PMR service coal mill
Action: see detail...
Status: done
2024-07-15
464-KL1-TI-8,-TI-9,-TI-10
Problem: Connected cable from sensor to temperature transmitter Endess Hauser
Action: see detail...
Status: done
2024-07-11
WORK-SHOP
Problem: Complete data PMR service analyzer 463 2K1 - 443 2K1 and CM analyzer for June & July 2024
Action: see detail...
Status: done
2024-07-10
WORK-SHOP
Problem: complete data TBM at shesig.sig.id
Action: see detail...
Status: done
2024-07-10
363-MD1
Problem: Tank auto grease level low level
Action: see detail...
Status: done
2024-07-10
L63-RM1
Problem: PMR service coal mill
Action: see detail...
Status: done
2024-07-09
WORK-SHOP
Problem: Scan data calibration pressure transmitter OH Nr2
Action: see detail...
Status: done
2024-07-09
473-FN7-&-463-MD1
Problem: Clean up area and filter motor
Action: see detail...
Status: done
2024-07-09
L1C-BC7
Problem: PM tripper and reclaimer coal 7 days information from production department
Action: see detail...
Status: done
2024-07-09
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-07-08
WORK-SHOP
Problem: Write data calibration pressure transmitter Over Haul Nr2
Action: see detail...
Status: done
2024-07-08
L63-MD1
Problem: Auto grease low level
Action: see detail...
Status: done
2024-07-06
WORK-SHOP-NR2
Problem: Calibration pressure transmitter zero and span area cooler and coal mill Nr2
Action: see detail...
Status: done
2024-07-05
WORK-SHOP-NR2
Problem: Calibration pressure zero and span transmitter area cooler and coal mill Nr2
Action: see detail...
Status: done
2024-07-04
WORK-SHOP-NR2
Problem: Calibration pressure transmitter area COAL MILL and Cooler Nr2
Action: see detail...
Status: done
2024-07-03
WORK-SHOP
Problem: Calibration pressure transmitter area pre heater Nr2
Action: see detail...
Status: done
2024-07-02
MAIN-GATE-ACCES-CONTROL-OH-NR2
Problem: Inspection electrical and welding tools of contractor for OH NR2
Action: see detail...
Status: done
2024-07-01
MAIN-GATE-ACCES-CONTROL-OH-NR2
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-06-29
464-KL1-AND-444-PH1
Problem: Make working permit for Over Haul
Action: see detail...
Status: done
2024-06-29
364-RM1-AND-334-WF
Problem: Make working permit for Over Haul
Action: see detail...
Status: done
2024-06-29
MAIN-GATE-ACCES-CONTROL
Problem: Inspection electrical and welding machine of contractor
Action: see detail...
Status: done
2024-06-28
CCTV-BURNER
Problem: Install panel box
Action: see detail...
Status: done
2024-06-28
WORK-SHOP
Problem: Completing data Juara Inovation
Action: see detail...
Status: done
2024-06-28
WARE-HOUSE
Problem: Install panel lighting at area motor for heater power. Connect power input and insatall cable to heater motor
Action: see detail...
Status: done
2024-06-28
393-FA3-A
Problem: Prepare project give to vendor and pulling cable, install LCS, pulling I/O MCC
Action: see detail...
Status: done
2024-06-28
WORK-SHOP
Problem: Completing wiring Input and Output panel
Action: see detail...
Status: done
2024-06-28
L1C-BC4-AND-L1C-BC7
Problem: Clean up panel welding and lighting
Action: see detail...
Status: done
2024-06-27
WORK-SHOP
Problem: Service Grinding Machine Mechanic I
Action: see detail...
Status: done
2024-06-27
WORK-SHOP
Problem: Prepare document for audit
Action: see detail...
Status: done
2024-06-27
WORK-SHOP
Problem: Continue labeling I/O
Action: see detail...
Status: done
2024-06-27
CCTV-BURNER-FLOOR
Problem: Install box
Action: see detail...
Status: done
2024-06-27
IDO-PUMP
Problem: Continue install lamp
Action: see detail...
Status: done
2024-06-26
453-AE1
Problem: Install strainer line of instrument air
Action: see detail...
Status: done
2024-06-26
WORK-SHOP-MECHANIC-NR1
Problem: Inspection electrical and welding machine
Action: see detail...
Status: done
2024-06-26
WORK-SHOP
Problem: Continue wiring diagram Input & Output
Action: see detail...
Status: done
2024-06-26
IDO-PUMP
Problem: Continue install receptacle
Action: see detail...
Status: done
2024-06-26
L63-RM1-&-L3C-RE1-&-L1C-TR1
Problem: WBI instrumentation and electrical
Action: see detail...
Status: done
2024-06-26
493-AC2
Problem: Continue replace contactor auxilary LCS
Action: see detail...
Status: done
2024-06-25
IDO-PUMP
Problem: Install receptacle and lighting panel
Action: see detail...
Status: done
2024-06-25
WORK-SHOP
Problem: JUARA INOVASI complete presentation data
Action: see detail...
Status: done
2024-06-25
WORK-SHOP
Problem: Complete data check sheet
Action: see detail...
Status: done
2024-06-25
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-25
L63-RM1
Problem: PMR service analyzer L63 2K1-2k2-2k3 & 483 2k1
Action: see detail...
Status: done
2024-06-24
IDO-PUMP
Problem: Replace lighting panel and install receptacle
Action: see detail...
Status: done
2024-06-24
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-06-24
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-24
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-24
TENT-OH
Problem: Install timer for lamp
Action: see detail...
Status: done
2024-06-21
WORK-SHOP
Problem: Complete data check sheet WBI grounding and lightning 2024
Action: see detail...
Status: done
2024-06-21
WORK-SHOP
Problem: Complete data wiring input/output
Action: see detail...
Status: done
2024-06-21
WORK-SHOP-
Problem: TPM 463 KL1 Tyre 3 complete data AM, safety and focus improvement, house keeping at local
Action: see detail...
Status: done
2024-06-21
EX-393-SC6-AND-BLOWER-PORTABLE
Problem: Recondition motor and install cover fan
Action: see detail...
Status: done
2024-06-21
483-BL5
Problem: Replace grease tank for Auto Lubrication
Action: see detail...
Status: done
2024-06-20
L3C-RE1
Problem: PM reclaimer coal check or clean up all LCS, proximity Harrow and another thing
Action: see detail...
Status: done
2024-06-20
LEC-RE1
Problem: PM reclaimer coal replace cable Harrrow and control also change roller postion
Action: see detail...
Status: done
2024-06-20
L3C-RE1
Problem: PM reclaimer coal Clean up panel room
Action: see detail...
Status: done
2024-06-20
WORK-SHOP
Problem: Completing data check sheet WBI Panel Welding and Lighting 2024
Action: see detail...
Status: done
2024-06-19
WORK-SHOP
Problem: Service motor
Action: see detail...
Status: done
2024-06-19
443-PH1
Problem: WBI top blending, CT, PH and KILN
Action: see detail...
Status: done
2024-06-19
L63-RM1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-19
443-2K1-&-463-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-19
363-RM1
Problem: WBI feed bin RM, CT and 423 BF1
Action: see detail...
Status: done
2024-06-19
WORK-SHOP
Problem: Completing data sheet WBI 363 RM1
Action: see detail...
Status: done
2024-06-18
COOLER-NORTH-SIDE-AND-333-HD1
Problem: Dismantle lamp that hit scafolding and repair or replace lamp that is off
Action: see detail...
Status: done
2024-06-18
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-06-18
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-18
WORK-SHOP
Problem: completing data check sheet WBI and PMR
Action: see detail...
Status: done
2024-06-18
443-EL1
Problem: PMR service elevator
Action: see detail...
Status: done
2024-06-14
WORK-SHOP
Problem: Completing data check sheet PMR IR TAD-CCTV-Tscanner-Pyrometer and PM 363 MD1
Action: see detail...
Status: done
2024-06-14
WORK-SHOP
Problem: Replace burned motor
Action: see detail...
Status: done
2024-06-14
WORK-SHOP
Problem: Test run motor and put at ware house after finish
Action: see detail...
Status: done
2024-06-14
363-WS1
Problem: Continue connection
Action: see detail...
Status: done
2024-06-14
363-MD1
Problem: Replace carbon brush and clean up carbon brush
Action: see detail...
Status: done
2024-06-13
WORK-SHOP
Problem: Make and completing data check sheet calibration damper and speed
Action: see detail...
Status: done
2024-06-13
WORK-SHOP
Problem: Replace burned motor blower for yellow blower motor
Action: see detail...
Status: done
2024-06-13
WORK-SHOP
Problem: Completing data check sheet PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-13
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-13
363-WS1
Problem: Continue connection I/O and install solenoid valve
Action: see detail...
Status: done
2024-06-12
363-WS1
Problem: Termination I/O and solenoid valve
Action: see detail...
Status: done
2024-06-12
443-EL1
Problem: Repair door elevator 1st floor
Action: see detail...
Status: done
2024-06-12
463-KL1
Problem: PMR service IR TAD, CCTV, T Scanner, Pyrometer
Action: see detail...
Status: done
2024-06-12
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-12
363-RM1-463-KL1-L63-RM1--WS-ELCTRIC-NR1
Problem: Check rubbish bin for B3-scrap and domestic must right at its placement
Action: see detail...
Status: done
2024-06-12
WORK-SHOP
Problem: Completing data check PM 363 MD1 and PMR service motor and pyrometer
Action: see detail...
Status: done
2024-06-11
363-WS1
Problem: Connect cable motor and LCS, pulling cable solenoid and LCS
Action: see detail...
Status: done
2024-06-11
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-06-11
363-RM1
Problem: PMR service motor
Action: see detail...
Status: done
2024-06-11
WORK-SHOP
Problem: Completing data check sheet PM 363 MD1 and PM Weigh Feeder
Action: see detail...
Status: done
2024-06-10
443-CT1
Problem: Replace solenoid that is not work and pressure switch
Action: see detail...
Status: done
2024-06-10
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-10
363-WS1
Problem: Install LCS and connect cable to motor
Action: see detail...
Status: done
2024-06-10
WORK-SHOP
Problem: completing data check sheet WBI
Action: see detail...
Status: done
2024-06-07
363-WS1
Problem: Pulling cable to ER3
Action: see detail...
Status: done
2024-06-06
L1C-BC7-SHUTTLE
Problem: Clean up panel control and PLC tripper
Action: see detail...
Status: done
2024-06-06
L1C-BC7-SHUTTLE
Problem: Clean up motor brake, area motor and panel
Action: see detail...
Status: done
2024-06-06
L1C-BC7
Problem: Clean up rail cable and tray
Action: see detail...
Status: done
2024-06-06
L1C-BC5-AND-BC7
Problem: Check water spray
Action: see detail...
Status: done
2024-06-05
393-SC1-AND-363-LQ2
Problem: Test run and service motor
Action: see detail...
Status: done
2024-06-05
WORK-SHOP
Problem: Prepare canopy motor
Action: see detail...
Status: done
2024-06-05
443-CT1
Problem: Check pressure switch
Action: see detail...
Status: done
2024-06-05
WORK-SHOP
Problem: Complete data check sheet PMR analyzer
Action: see detail...
Status: done
2024-06-05
WORK-SHOP
Problem: Repaire and replace bearing motor. Clean up motor 30 KW
Action: see detail...
Status: done
2024-06-04
443-2K1-&-463-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-06-04
473-HC1
Problem: Install AUTO lubrication
Action: see detail...
Status: done
2024-06-04
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-06-04
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-06-03
WORK-SHOP
Problem: complete data wiring panel I/O area raw mill and preheater
Action: see detail...
Status: done
2024-06-03
463-2K1
Problem: Problem probe often retract but there is alarm when inside probe
Action: see detail...
Status: done
2024-06-03
363-HS1
Problem: Replace lamp at room of HS
Action: see detail...
Status: done
2024-06-03
463-KL1
Problem: PMR service critical motor and LSR
Action: see detail...
Status: done
2024-05-31
363-RM1-&-443-PH1
Problem: Completing data wiring panel Input and output
Action: see detail...
Status: done
2024-05-31
WORK-SHOP-PLANT-BUILDING
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-05-31
393-FA5A
Problem: Replace bearing motor
Action: see detail...
Status: done
2024-05-30
INPUT-AND-OUTPUT-COOLER
Problem: Pulling cable profibus
Action: see detail...
Status: done
2024-05-30
L63-RM1-
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-05-30
443-WB1
Problem: Dismantle motor
Action: see detail...
Status: done
2024-05-30
393-FA5-&-433-RF1
Problem: Prepare spare motor
Action: see detail...
Status: done
2024-05-30
463-KL1
Problem: Replace gun grease
Action: see detail...
Status: done
2024-05-29
473-FA1-2
Problem: Move cable I/O
Action: see detail...
Status: done
2024-05-29
TPM-463-KL1-TRYE-3
Problem: Assesment
Action: see detail...
Status: done
2024-05-29
L1C-BC4
Problem: Replace lamp that is off
Action: see detail...
Status: done
2024-05-29
443-FN1-P1
Problem: Draft value showing 0
Action: see detail...
Status: done
2024-05-29
L63-RM1
Problem: WBI electrical and instrumentation
Action: see detail...
Status: done
2024-05-29
WORK-PLANT-BUILDING
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-05-28
333-MS1
Problem: Oil come inside motor. Replace bearing motor metal separator
Action: see detail...
Status: done
2024-05-28
463-2K1-&-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-05-28
TPM-463-KL1-TYRE-3
Problem: Complete data TPM and make basket cage for equipment cleaning tools
Action: see detail...
Status: done
2024-05-28
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-05-28
WORK-SHOP-MECHANIC-NR1
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-05-28
463-KL1-TYRE-3-
Problem: TPM complete data absention, AM, safety, FI 2nd theme
Action: see detail...
Status: done
2024-05-28
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-05-28
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-05-24
463-KL1-TYRE-3
Problem: TPM gemba area 5R, install sign safety
Action: see detail...
Status: done
2024-05-24
ER5-&-ER6
Problem: Clean up ER and top panel MV, ACB and MCC
Action: see detail...
Status: done
2024-05-24
473-GQ1
Problem: WBI KILN, Cooler, Burner Floor, Clinker Silo
Action: see detail...
Status: done
2024-05-24
443-PH1
Problem: WBI top blending, CT, Pre heater and KILN
Action: see detail...
Status: done
2024-05-24
PPUP-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Inspection electrical and welding tools
Action: see detail...
Status: done
2024-05-22
WORK-SHOP-PPUP
Problem: Check electrical and welding tools
Action: see detail...
Status: done
2024-05-22
363-RM1
Problem: WBI electric and instrumentation
Action: see detail...
Status: done
2024-05-22
463-2K1-AND-443-2K1
Problem: PMR service analyzer
Action: see detail...
Status: done
2024-05-22
423-2K1-
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-05-22
463-2K1
Problem: Test gas NO
Action: see detail...
Status: done
2024-05-22
L63-RM1
Problem: Replace vibration sensor
Action: see detail...
Status: done
2024-05-22
443-WI1-M3
Problem: Replace cable power motor 4c x 50 mm, connect cable and test run
Action: see detail...
Status: done
2024-05-20
WORK-SHOP
Problem: Install way of instrument air auto grease pump
Action: see detail...
Status: done
2024-05-20
443-EL1
Problem: Replace V-belt and service limit switch door all from 1st to 8th
Action: see detail...
Status: done
2024-05-20
463-KL1
Problem: PMR service IR TAD, camera burner, T scanner and CCTV
Action: see detail...
Status: done
2024-05-20
363-RM1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-05-20
463-KL1
Problem: PMR service medium voltage motor
Action: see detail...
Status: done
2024-05-17
463-KL1
Problem: TPM Tyre 3
Action: see detail...
Status: done
2024-05-16
WORK-SHOP-MECHANIC
Problem: Install LCS roll machine
Action: see detail...
Status: done
2024-05-16
393-BE1-BOTTOM
Problem: Check tilt sensor
Action: see detail...
Status: done
2024-05-16
463-2K1-&-443-2K1
Problem: Monitor functional analyzer
Action: see detail...
Status: done
2024-05-16
473-GQ1-AND-CLINKER-SILO
Problem: WBI Hoist Crane
Action: see detail...
Status: done
2024-05-16
L1C-BC6-&-BC7
Problem: Water spray can not stop
Action: see detail...
Status: done
2024-05-16
393-SCA-AND-MV-MOTOR
Problem: Monitor bearing motor
Action: see detail...
Status: done
2024-05-16
ER3-AND-ER6
Problem: Clean up to panel MV and trafo
Action: see detail...
Status: done
2024-05-15
393-BE1
Problem: fabrication box grease
Action: see detail...
Status: done
2024-05-15
463-KL1
Problem: WBI camera burner and clinker silo
Action: see detail...
Status: done
2024-05-15
443-CT1
Problem: Solenoid valve for water and air are not function
Action: see detail...
Status: done
2024-05-15
473-FA1-AND-FA2
Problem: Install sensor RTD and vibration
Action: see detail...
Status: done
2024-05-15
423-2K1
Problem: PMR service CEMS
Action: see detail...
Status: done
2024-05-14
HRG
Problem: Clean up area room HRG and filter
Action: see detail...
Status: done
2024-05-14
363-MD1
Problem: Clean up motor
Action: see detail...
Status: done
2024-05-14
463-MD1-&-473-FN7
Problem: Clean up motor
Action: see detail...
Status: done
2024-05-14
453-PF1-AND-483-PF1
Problem: Check load cell and calibration pfister feeder
Action: see detail...
Status: done
2024-05-14
PANEL-INPUT-&-OUTPUT-WEST-ALSO-EAST-BLENDING
Problem: Panel I/O west and east blending dirty from dust blending
Action: see detail...
Status: done
2024-05-14
L1C-2RC-11
Problem: Panel input-output dirty
Action: see detail...
Status: done
2024-05-13
483-RF2
Problem: Connect motor
Action: see detail...
Status: done
2024-05-13
473-FA1-AND-FA2
Problem: Connect sensor RTD and vibration
Action: see detail...
Status: done
2024-05-13
493-AC1,-AC2,-AC3
Problem: Check and repaire TLS
Action: see detail...
Status: done
2024-05-13
473-EH3
Problem: Connect power hoist
Action: see detail...
Status: done
2024-05-13
RECONDITION-MOTOR
Problem: Recondition motor 5.5 KW 4P and 2.2 KW 2P
Action: see detail...
Status: done
2024-05-13
393-FV2
Problem: Continue connection cable
Action: see detail...
Status: done
2024-05-13
BURNER-FLOOR
Problem: Connect camera
Action: see detail...
Status: done
2024-05-13
463-KL1
Problem: Continue install rell hoist 463 MD1
Action: see detail...
Status: done
2024-05-13
463-KL1
Problem: Tidy up cable shell cooling and install blower motor
Action: see detail...
Status: done
2024-05-08
L63-RM1-
Problem: Connect cable incoming welding to ER4 at cable tray
Action: see detail...
Status: done
2024-05-08
463-LQ2
Problem: Install motor liquid
Action: see detail...
Status: done
2024-05-08
483-FA1-M1
Problem: Test run motor, measure vibration and noise motor for free side and load side
Action: see detail...
Status: done
2024-05-08
SLIDE-GATE-CKD
Problem: Install box terminal cable, Limit Switch and Solenoid Valve
Action: see detail...
Status: done
2024-05-07
363-WS1
Problem: Install new LCS
Action: see detail...
Status: done
2024-05-07
SLIDE-GATE-CKD
Problem: Install box termination and cable tray. Also install limit switch and solenoid valve
Action: see detail...
Status: done
2024-05-07
473-EH3
Problem: relocation cable hoist to avoid hot materials from grate cooler
Action: see detail...
Status: done
2024-05-07
L63-LQ1
Problem: Check rubber coupling
Action: see detail...
Status: done
2024-05-07
463-LQ2
Problem: Motor vibration and noise are not normal
Action: see detail...
Status: done
2024-05-06
483-FA1-M1
Problem: Continue replace bearing motor
Action: see detail...
Status: done
2024-05-06
SLIDE-GATE-CKD
Problem: Pulling cable 4 limit switch dan 2 solenoid valve
Action: see detail...
Status: done
2024-05-03
483-FA1-M1
Problem: Check bearing condition
Action: see detail...
Status: done
2024-05-03
L63-BV1
Problem: Check indication compare from CCR and local
Action: see detail...
Status: done
2024-05-03
CABLE-WELDING-INCOMING-TO-ER4
Problem: Connected cable incoming welding to ER4
Action: see detail...
Status: done
2024-05-02
453-AGITATOR-M1
Problem: Replace bearing and install at local
Action: see detail...
Status: done
2024-04-30
CABLE-INGOMING-WELDING-TO-ER4
Problem: Cable incoming welding to ER4 that is burned
Action: see detail...
Status: done
2024-04-30
L93-RF1-AND-L93-SC5
Problem: Seal leakage at rotary feeder and motor abnormal at screw conveyor
Action: see detail...
Status: done
2024-04-30
463-KL1-TYRE-3
Problem: TPM prepare dash board, report FA, AM, and Safety
Action: see detail...
Status: done
2024-04-29
423-FN1
Problem: Report for precomissioing drive
Action: see detail...
Status: done
2024-04-29
363-MD1
Problem: Prepare pulling cable for indication temperature motor
Action: see detail...
Status: done
2024-04-29
FIELD-NEW-INPUT-OUTPUT
Problem: Pulling profibus cable
Action: see detail...
Status: done
2024-04-29
473-FA1-AND-FA2
Problem: Continue install cable vibration and RTD
Action: see detail...
Status: done
2024-04-29
L93-SC4-
Problem: Continue service cable power
Action: see detail...
Status: done
2024-04-29
WARE-HOUSE
Problem: Check motor 463 MD1
Action: see detail...
Status: done
2024-04-29
L93-SC4
Problem: pulling cable power
Action: see detail...
Status: done
2024-04-26
473-FA1-AND-FA2
Problem: continue install sensor RTD and vibration
Action: see detail...
Status: done
2024-04-25
L93-SC4
Problem: Cable grounded
Action: see detail...
Status: done
2024-04-25
ER5-UPS-AND-HYDROLIC-PLC
Problem: Replace cable power PLC
Action: see detail...
Status: done
2024-04-25
INPUT-OUTPUT-493-AC1
Problem: Connecting new I/O
Action: see detail...
Status: done
2024-04-25
463-LQ1,-LQ2,-LQ3
Problem: Continue install motor at local
Action: see detail...
Status: done
2024-04-25
473-FA1-AND-FA2
Problem: Continue install sensor RTD and vibration
Action: see detail...
Status: done
2024-04-24
473-FA1-AND-FA2
Problem: Prepare cable for RTD and Vibration
Action: see detail...
Status: done
2024-04-24
363-RM
Problem: continue install I/O
Action: see detail...
Status: done
2024-04-24
HRG
Problem: Replace MC incoming
Action: see detail...
Status: done
2024-04-24
463-LQ1-LQ2-LQ3
Problem: LQ3 discouple coupling or replace bearing motor vibration 4.4 m/s noise 1.6 gE, LQ2 discouple motor& test noise 2.3 gE, LQ1 discouple & test noise 3.6 gE
Action: see detail...
Status: done
2024-04-23
363-LQ2-M1-TO-M2-AND-463-LQ1-TO-LQ3
Problem: check condition bearing motor
Action: see detail...
Status: done
2024-04-23
473-HC1-
Problem: Continue install sensor bearing
Action: see detail...
Status: done
2024-04-23
473-EH3
Problem: Relocation power hoist
Action: see detail...
Status: done
2024-04-23
363-RM1
Problem: Relocation relay panel I/O
Action: see detail...
Status: done
2024-04-22
ER6
Problem: Replace battery charging 12 VDC
Action: see detail...
Status: done
2024-04-22
363-RM1-PANEL-INPUT-OUTPUT
Problem: Move relay I/O
Action: see detail...
Status: done
2024-04-22
473-HC1
Problem: pulling cable vibration sensor and make conduit way to vibration sensor
Action: see detail...
Status: done
2024-04-19
453-PF1
Problem: continue install load cell
Action: see detail...
Status: done
2024-04-19
363-RM
Problem: continue check I/O
Action: see detail...
Status: done
2024-04-19
443-EL1
Problem: Continue replace bearing motor door at north side
Action: see detail...
Status: done
2024-04-19
FM-NR2
Problem: Continue calibration protection relay
Action: see detail...
Status: done
2024-04-19
KALENESIA
Problem: Check inspection electrical and welding tools
Action: see detail...
Status: done
2024-04-18
453-PF1
Problem: continue install convensator
Action: see detail...
Status: done
2024-04-18
FM-NR2
Problem: Calibration protection relay
Action: see detail...
Status: done
2024-04-18
443-EL1
Problem: Repaire elevator
Action: see detail...
Status: done
2024-04-09
363-BE1
Problem: Replace bright lamp that are of
Action: see detail...
Status: done
2024-04-09
ER-3
Problem: Continue install door siren and lamp emergency
Action: see detail...
Status: done
2024-04-09
363-BC1
Problem: Replace bright lamp are off
Action: see detail...
Status: done
2024-04-08
363-BC1
Problem: Replace bright lamp are off
Action: see detail...
Status: done
2024-04-08
473-EH3
Problem: Relocation power
Action: see detail...
Status: done
2024-04-08
L1C-BC7
Problem: Continue install bright lamp
Action: see detail...
Status: done
2024-04-05
L33-BC1
Problem: Interlock BD is not connecting, cross check
Action: see detail...
Status: done
2024-04-05
393-BF2-TOP-DUST-BIN
Problem: Replace regulator filter
Action: see detail...
Status: done
2024-04-05
363-HS1
Problem: Continue install panel I/O
Action: see detail...
Status: done
2024-04-05
433-BF2
Problem: test run equipment
Action: see detail...
Status: done
2024-04-05
463-KL1&-473-EH3
Problem: tidy up all cable shell cooling fan put inside cable tray and cable power is burn also install scafolding
Action: see detail...
Status: done
2024-04-04
ER4-AND-ER5-CLEAN-UP-ER-AND-FILTER-DRIVE
Problem: Electric room and filter drive are not clean up yet
Action: see detail...
Status: done
2024-04-04
363-WS1-CONTINUE-INSTALL-PANEL-AND-WIRING-
Problem: Panel is not install yet
Action: see detail...
Status: done
2024-04-04
453-PF1-BRING-DOWN-COMPENSATOR
Problem: Compensator is not bring down yet
Action: see detail...
Status: done
2024-04-04
433-DG1-CHECK-AND-TEST-RUN-SIGNAL-KTDR-TO-CCR
Problem: Signal KTDR from I/O panel to CCR is not check yet
Action: see detail...
Status: done
2024-04-04
433-BF2-&-433-FN2-PREPARE-INPUT-OUTPUT-AND-TEST-RUN
Problem: I/O are not ready yet
Action: see detail...
Status: done
2024-04-03
363-WS1-PREPARE-INSTALL-HAGGER-BOX
Problem: Box hagger is not prepare yet
Action: see detail...
Status: done
2024-04-03
363-WS1-CONTINUE-SOLENOID-VALVE-ALSO-PREPARE-CABLE-POWER-AND--CABLE-CONTROL
Problem: S/V, cable power and control are not install and prepare yet
Action: see detail...
Status: done
2024-04-03
L1C-BC7-CONTINUE-INSTALL-LAMP
Problem: Lamp off are not install yet
Action: see detail...
Status: done
2024-04-02
L1C-TR1-INSTALL-LAMP-ALL-BC-
Problem: Lamp off are not replace yet
Action: see detail...
Status: done
2024-04-02
ER4-MCC-LOAD-FOR-ACB-AND-MCC
Problem: Area MCC of ACB & MCC are not check yet
Action: see detail...
Status: done
2024-04-02
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
Action: see detail...
Status: done
2024-04-02
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Sample line, filter, flange probe full material of coal, also filter balston
Action: see detail...
Status: done
2024-04-02
L63-RM1-&-L1C-TR1-&-L3C-RE1-WBI-ELECTRIC-AND-INSTRUMENTATION
Problem: Area motor, reclaimer and tripper dirty by dust coal process
Action: see detail...
Status: done
2024-04-01
363-WS1
Problem: install new s/v
Action: see detail...
Status: done
2024-04-01
L33-BC1-ACTIVATED-BD-IS-NOT-STANDARD-FOR-TRIP-IS-NOT-ACTIVE--AND-PULLING-CABLE
Problem: BD is activated yet
Action: see detail...
Status: done
2024-04-01
463-KL1-REPLACE-AND-INSTALL-BRIGHT-LAMP
Problem: Lamp is off not replace yet and mew instalation lamp is not resy yet
Action: see detail...
Status: done
2024-04-01
493-EH1-&-EH4-MOVE-POWER-TO-EMERGENCY-BOX
Problem: Power hoist are not move yet at ER5
Action: see detail...
Status: done
2024-03-28
ER3-MCC-LOAD-ACB-AND-THERMOGRAPHY-MCC
Problem: Thermography MCC and Load MCC ACB are not do at Electric Room
Action: see detail...
Status: done
2024-03-28
463-MD1-AUDIT-TPM
Problem: Audit TPM 463 MD1 is not do at site
Action: see detail...
Status: done
2024-03-28
WORK-SHOP-COMPLETING-DATA-TPM.-AM-AND-SAFETY-ALSO-DASH-BORAD
Problem: Data TPM for AM, Safety and Dash Board are complete yet
Action: see detail...
Status: done
2024-03-28
473-FA7,-FA8,-FA9-INSTALL-MEMO-LUBE-OR-AUTO-GREASE
Problem: Auto grease or memo lube are not install yet at motor
Action: see detail...
Status: done
2024-03-28
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Filter probe, sample line, membran pump, balston filter, dryer gas dirt of coal
Action: see detail...
Status: done
2024-03-27
WORK-SHOP-COMPLETING-DATA-TPM
Problem: Data TPM is not complete yet
Action: see detail...
Status: done
2024-03-27
463-KL1-WBI-KILN,-COOLER,-CLINKER-SILO
Problem: Area kiln, cooler, clinker silo dirty from dust and coal process
Action: see detail...
Status: done
2024-03-27
463-KL1-WBI-TOP-BLENDING,-PREHEATER,-CT-AND-KILN
Problem: Area top blending, PH, CT and kiln dirty from dust process
Action: see detail...
Status: done
2024-03-27
463-MD1-TPM-HOUSE-KEEPING-AND-PAINTING
Problem: Area TPM dirty and fence,pipe,also need be repainting green and grey color
Action: see detail...
Status: done
2024-03-26
WORK-SHOP-UTILITY-TRAINING-PLC
Problem: PLC is not training yet for employee
Action: see detail...
Status: done
2024-03-26
463-2K1-AND-442-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
Action: see detail...
Status: done
2024-03-26
423-2K1-PMR-SERVICE-CEMS
Problem: Filter purge air unit for dust hunter and flowsic, swivel window dust hunter, transducer flowsic, CEMS room dirty from dust procecc
Action: see detail...
Status: done
2024-03-26
463-MD1-TPM-CLEAN-AND-PAINTING
Problem: Area TPM still dirty from dust process and fence also cover motor still need to be repainting
Action: see detail...
Status: done
2024-03-25
463-KL1-PMR-SERVICE-MOTOR
Problem: Area and filter motor are dirty from dust process
Action: see detail...
Status: done
2024-03-25
363-RM1-PMR-SERVICE-MOTOR
Problem: Area and filter motor dirt from dust process
Action: see detail...
Status: done
2024-03-25
463-2K1-REPLACE-ROOLER-PROBE
Problem: Roller bad condition and rell probe are not replace yet
Action: see detail...
Status: done
2024-03-25
463-KL1-PMR-SERVICE-TEMPERATURE-TAD,-T-SCANNER,-CCTV,-CAMERA-BURNER
Problem: Area lens temperature TAD, T scanner, CCTV and camera burner ( pyrometer ) dirty from dust process
Action: see detail...
Status: done
2024-03-18
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
Problem: Limit switch and cable are not ready at ER3
Action: see detail...
Status: done
2024-03-18
473-FA1-REPLACE-BEARING-MOTOR
Problem: Bearing bad condition is not replace yet
Action: see detail...
Status: done
2024-03-22
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2024-03-22
ER3-INSTALL-HORN-OF-DOOR
Problem: HORN of door at ER3 is not install yet
Action: see detail...
Status: done
2024-03-22
363-CYCLONE-ALL-LAMP-OFF
Problem: Lamp is off still not replace yet
Action: see detail...
Status: done
2024-03-22
463-KL1-PMR-SERVICE-IR-TAD-TSCANNER-PYROMETER-CCTV
Problem: Flange probe, probe, sample line, filter probe,membran pump, dryer gas filter balston dirty
Action: see detail...
Status: done
2024-03-22
L63-RM1-PMR-SERVICE-ANALYZER-
Problem: Flange probe, sample line, filter probe,membran pump dirt of dust coal
Action: see detail...
Status: done
2024-03-22
463-KL1-&-463-MD1-GEMBA-TPM
Problem: Area TPM need to be clean and repainting for yellow color for fence and cover motor
Action: see detail...
Status: done
2024-03-21
ER3-INSTALL-DOOR-HORN
Problem: Horn at ER3 is not install yet
Action: see detail...
Status: done
2024-03-21
363-CYCLONE--LAMP-ALL-OFF-AND-363-RM1-P3-DP-RM-INDICATION-HIGH
Problem: Lamp off are not replace yet and Indication DP RM are not check
Action: see detail...
Status: done
2024-03-21
463-2K1-CONTINUE-REPLACE-ROLLER-
Problem: Roller for probe is not replace yet
Action: see detail...
Status: done
2024-03-21
WORK-SHOP-COMPLETE-DATA-CALIBRATION-OF-ANALYZER
Problem: Data for analyzer are not complete yet
Action: see detail...
Status: done
2024-03-20
443-CYCLONE-4-REPAIRE-TUBING
Problem: Tubing bad condition is not repaire yet
Action: see detail...
Status: done
2024-03-20
ER3-INSTALL-DOOR-HORN
Problem: Door horn is not install yet at ER3
Action: see detail...
Status: done
2024-03-20
463-BL7-AND-BL9--REPLACE-AUTO-GREASE
Problem: Auto grease is not replace yet
Action: see detail...
Status: done
2024-03-20
473-HC1-INSTALL-VIBRATION-SENSOR
Problem: Vibration sensor is not ready at site
Action: see detail...
Status: done
2024-03-20
463-2K1-AND-43-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
Action: see detail...
Status: done
2024-03-20
WORK-SHOP-SCAN-DATA-CALIBRATION-AND-SCHEDULE-CALIBRATION
Problem: Data calibration and schedule calibration are not ready for scanning
Action: see detail...
Status: done
2024-03-19
L63-RM1-P2-DRUFT-PRESSURE-OFTEN-HIGH-AROUND-25-MMH2O
Problem: Actual pressure at local are not check yet use portable sensor pressure
Action: see detail...
Status: done
2024-03-19
L63-2K1-SERVICE-ANALYZER-COMPLAIN-CO-READING-FLUCTAUIC-OFTEN-HIGH
Problem: Flowmeter at low position, fllange-sample line, and filter probe are not service yet
Action: see detail...
Status: done
2024-03-15
443-WI1-M3-REPLACE-BEARING-MOTOR
Problem: Bearing motor bad are not replace yet
Action: see detail...
Status: done
2024-03-15
443-PH1,-GCT,-463-KL1,-423-EP1-WBI-ELECTRICAL-&-INSTRUMENTATION
Problem: Area electrical and Instrumentation are not clean up yet
Action: see detail...
Status: done
2024-03-15
LA3-VA1-&-VA3-CALIBRATION-SENSOR-IDO
Problem: Sensor IDO are not calibrated yet
Action: see detail...
Status: done
2024-03-15
463-KL1-GEMBA-TPM-5R
Problem: Area TPM are dirty are not clean up yet, unuse ducting still at location
Action: see detail...
Status: done
2024-03-19
423-BF1-INSTALL-OIL-FILTER
Problem: Filter oil is not install yet at location
Action: see detail...
Status: done
2024-03-19
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
Problem: Limit switch is not insall yet
Action: see detail...
Status: done
2024-03-19
463-KL1-&-473-CC1-PMR-SERVICE-CRITICALMOTOR-AND-LSR
Problem: Area and filter motor dirt by dust
Action: see detail...
Status: done
2024-03-19
423-2K1-PMR-SERVICE-CEMS
Problem: Filter purge air unit for dust hunter and flowsic, swivel window dust hunter, transducer flowsic, CEMS room dirty from dust procecc
Action: see detail...
Status: done
2024-03-18
ER3-INSTALL-LIMIT-SWITCH-AND-PULLING-CABLE
Problem: Limit switch and cable are not ready at ER3
Action: see detail...
Status: done
2024-03-18
473-FAC-REPALCE-BEARING-MOTOR
Problem: Bearing motor bad are not replace yet
Action: see detail...
Status: done
2024-03-18
363-RM1-AND-L63-RM1-PMR-SERVICE-CRITICAL-MOTOR--AND-LSR
Problem: Area and filter motor dirty from dust process
Action: see detail...
Status: done
2024-03-18
463-KL1-DISMANTLE-UNUSE-DUCTING
Problem: unuse ducting still at location
Action: see detail...
Status: done
2024-03-18
LA3-VA1-&-VA3-CALIBRATION-SENSOR-IDO
Problem: Sensor IDO are not calibrated yet
Action: see detail...
Status: done
2024-03-18
TPM-GEMBA-5R
Problem: Area GEMBA 5R are not clean up yet
Action: see detail...
Status: done
2024-03-18
443-PH1,-GCT,-EP,-463-KL1-WBI-ELECTRICAL-AND-INSTRUMENTASI-
Problem: Electrical / Instrumentation are not check yet
Action: see detail...
Status: done
2024-03-14
FLOWMETER-IDO-CALIBRATION
Problem: IDO flowmeter is not calibration yet
Action: see detail...
Status: done
2024-03-14
L63-RM1-R4-REPLACE-THERMOCOUPLE
Problem: Thermocouple is not replace yet
Action: see detail...
Status: done
2024-03-14
443-EL1-PMR-SERVICE-ELEVATOR
Problem: Elevator is not service yet
Action: see detail...
Status: done
2024-03-14
433-BE1-REPLACE-AUTO-GREASE
Problem: Auto grease is not replace yet
Action: see detail...
Status: done
2024-03-14
393-EB1-REPLACE-LAMP-AT-BOTTOM-BLENDIG
Problem: Lamp off is not replace
Action: see detail...
Status: done
2024-03-14
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Sample line, filter, flange probe full material of coal, also filter balston
Action: see detail...
Status: done
2024-03-13
393-3B1-REPLACE-LAMP-OF-BOTTOM-BLENDING
Problem: Lamp off are not replace yet
Action: see detail...
Status: done
2024-03-13
WORK-SHOP-REPORT-EFFICIENCY-ENERGY
Problem: Report efficiency energy are not ready yet
Action: see detail...
Status: done
2024-03-13
L63-WF1-CHECK-LAMP-INSIDE-WEIGHT-FEEDER-IS-OFF
Problem: Lamp off is not replace yet
Action: see detail...
Status: done
2024-03-13
BURNER-FLOOR-&-493-3B1-WBI-CRANE
Problem: Crane are not check yet for move up and down also move south-north or west-east
Action: see detail...
Status: done
2024-03-13
WORK-SHOP-COMPLETE-DATA-CALIBRATION
Problem: Data calibration are not complete yet
Action: see detail...
Status: done
2024-03-13
433-BE1-CHECK-SPEED-SENSOR
Problem: Speed sensor is not check yet
Action: see detail...
Status: done
2024-03-13
483-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
Problem: Probe, flange, filter probe, filter humidity sensor are not clean up yet from dirty dust process
Action: see detail...
Status: done
2024-03-12
463-MD1-CLEAN-AREA-MOTOR-AND-FILTER-MOTOR
Problem: Area and filter motor are not clean up yet
Action: see detail...
Status: done
2024-03-12
L63-RM1-7-443-PH1-WBI-CRANE
Problem: Crane are not test yet for move up and down also south-north or west-east
Action: see detail...
Status: done
2024-03-12
463-KL1-AND-473-CC1-PMR-CRITICAL-MOTOR-&-LSR
Problem: Area motor and filter motor are not clean up yet
Action: see detail...
Status: done
2024-03-12
423-2K1-PMR-SERVICE-CEMS
Problem: Filter PAU, swivel windows Dust Hunter, transducer Flowsic 100, filter cabinet MCS are dirt from dust process
Action: see detail...
Status: done
2024-03-12
FEED-BIN-WBI-ELECTRICAL-AND-INSTRUMENTATION-CHECK-INPUT-OUTPUT-PANEL
Problem: i/O panel area feed are dirty from dust process
Action: see detail...
Status: done
2024-03-12
443-PH1-PMR-SERVICE-TEMPERARUE-TAD-&-T-SCANNER-&-CCCTV-AND-CAMERA-BURNER
Problem: Lens of temperature TAD-Tscanner-CCTV and camera burner are not clean up yet
Action: see detail...
Status: done
2024-03-08
363-CV2
Problem: Often speed failure
Action: see detail...
Status: done
2024-03-08
363-LD2
Problem: Can not close 0 %
Action: see detail...
Status: done
2024-03-08
473-EH5-CONNECT-TO-LCS-NEAR-483-BL7
Problem: Cable for power 473 EH5 is not connect yet
Action: see detail...
Status: done
2024-03-08
453-PF1-MONITOR
Problem: Problem 453 PF1 still exist
Action: see detail...
Status: done
2024-03-08
363-CV1-&-363-CV2
Problem: Often speed failure
Action: see detail...
Status: done
2024-03-07
TENT-OH-LAMP-LIGHT-INSIDE
Problem: Lamp light inside tent OH are not dismantle yet
Action: see detail...
Status: done
2024-03-07
363-MD1,-363-SR1,-463-MD1,473-FA2,-483-BL9,-433-W1-M3,-473-FN1-FN3-FN6
Problem: Monitoring motor are not action yet
Action: see detail...
Status: done
2024-03-07
473-EH5-AND-493-EH1
Problem: Move power to new panel are not ready yet
Action: see detail...
Status: done
2024-03-07
433-FA1,-5,5-KW-MOTOR-AND-45-KW-MOTOR-
Problem: Motor 433 FA1 is not move to ware house, motor 5,5 KW is not move to Mr. Dwiyan wh, motor 45 KW is not move from WS Electric Nr2 to WS Electric Nr1
Action: see detail...
Status: done
2024-03-06
453-PF1-MONITOR
Problem: Monitor functional 453 PF1
Action: see detail...
Status: done
2024-03-06
463-FX2-M2
Problem: Replace motor
Action: see detail...
Status: done
2024-03-06
363-MD1-AND-363-SR1
Problem: Temperature bearing over heat
Action: see detail...
Status: done
2024-03-06
463-MD1,-473-FA8,-483-BL9,-473-FN1-FN3-FN6
Problem: Do monitoring bearing motor
Action: see detail...
Status: done
2024-03-05
ER3-ER4--ER5-SETTING-MOTOR-DT
Problem: Motor much can not start because setting DT are abnormal
Action: see detail...
Status: done
2024-03-05
463-2K1-INLET-KILN-GAS-ANALYZER
Problem: Reading O2 is abnormal
Action: see detail...
Status: done
2024-03-05
443-PH1-CYCLONE-4-TEMPERATURE-SHOW-AND-453-PF1-AMPERE-HIGH-MOTOR
Problem: Temperature cyclone 4 material and gas are show abnormal, Ampere motor 453 PF1 is abnormal
Action: see detail...
Status: done
2024-03-05
393-FN5-&-HGA-SYSTEM
Problem: 393 FN5 is indication ampere also vibration high. HGA system is not start yet
Action: see detail...
Status: done
2024-03-05
ER3-363-SR1
Problem: Indication ready at CCR Operator is not appear
Action: see detail...
Status: done
2024-02-21
MCC-ER3-ACB
Problem: Peremajaan ACB
Action: see detail...
Status: done
2024-02-26
ER3-SWITCH-GEAR
Problem: Peremajaan VCS to VCB
Action: see detail...
Status: done
2024-03-04
L33-FN1
Problem: motor grouded
Action: see detail...
Status: done
2024-03-04
ER-5-TO-PLC-COOLER-PULLING-CABLE
Problem: Cable for PLC Cooler are not ready at site
Action: see detail...
Status: done
2024-03-03
493-BV2,-473-HS1,473-CV1,473-CV2,473-CV3,-473-CV4,473-CV5
Problem: Install S/V BV2, check miltronic sensor are not ready yet
Action: see detail...
Status: done
2024-03-01
393-3S3-AND-393-3S4-CLEAN-UP-LCS-AND-MOTOR
Problem: LCS and motor are dirty by dust process and not clean up yet
Action: see detail...
Status: done
2024-02-29
CLEAN-UP-PANEL-INPUT-OUTPUT-AREA-443-PH1-AND-BLENDING
Problem: Panel I/O are not clean up yet
Action: see detail...
Status: done
2024-02-28
CLEAN-UP-LCS-AND-MOTOR-AREA-BURNER-FLOOR
Problem: LCS and motor area burner floor are still dirty by dust process
Action: see detail...
Status: done
2024-02-27
ER5-CLEAN-UP-MCC-ALSO-REPLACE-TOR-TO-EOCR
Problem: TOR still applied at ER5
Action: see detail...
Status: done
2024-02-27
ER-3-NORMALISATION-CABLE-JUMPERE-ACB-AND-VCB
Problem: Cable jumpered for ACB and VCB still connecting at ER 3
Action: see detail...
Status: done
2024-02-26
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: Tools for electrical and welding are already expired tagging
Action: see detail...
Status: done
2024-02-23
ER3-SERVICE-MCC-AND-REPLACE-TOR-TO-EOCR
Problem: TOR are not replace yet to EOCR at MCC ER3
Action: see detail...
Status: done
2024-02-22
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: Tools for electrical and welding are already expired tagging
Action: see detail...
Status: done
2024-02-21
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: Tagging for electrical and welding tools of contractor already expire date and month
Action: see detail...
Status: done
2024-02-20
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: Tagging for electrical and welding tools of contractor already expired
Action: see detail...
Status: done
2024-02-19
ACCES-CONTROL-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: Tagging for electrical and welding tools of contractor already expired
Action: see detail...
Status: done
2024-02-16
HGA-SERVICE-ERROR-INSIDE-EQUIPMENT
Problem: Error still occure at HGA
Action: see detail...
Status: done
2024-02-17
INSTALL-POWER-BRIGHT-LAMP-AT-TOULET-TENT-OH
Problem: Power bright lamp are not ready at site toilet
Action: see detail...
Status: done
2024-02-15
INSTALL-BRIGHT-LAMP-AND-POWER-DISPENSER-NEAR-AREA-BLENDING
Problem: Bright lamp and power dispenser are not install at tent OH
Action: see detail...
Status: done
2024-02-15
WORK-SHOP-SERVICE-CAMERA-PYROMETER-
Problem: Camera pyrometer is not do service
Action: see detail...
Status: done
2024-02-15
393-FA7-CHECK-LCS
Problem: LCS 393 FA7 is not checking
Action: see detail...
Status: done
2024-02-15
ER3-MOVE-PART-PIPE-AC-OF-VSD
Problem: Part pipe AC of VSD and cover little beam are not do at ER3 bottom
Action: see detail...
Status: done
2024-02-15
463-MD1-M2-CHECK-MOTOR-INCHING-KILN
Problem: Motor inching kiln are not checking for vibration-noise and temperature for free side and load side
Action: see detail...
Status: done
2024-02-15
INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-SUPRA-BAKTI-&-QUADRO-INDONESIA-&-MEGAVOLT-PERKASA
Problem: Electrical and welding tools of Supra Bakti-Quadro Indonesia and Megavolt Perkasa are not inspection
Action: see detail...
Status: done
2024-02-13
ER3-BOTTOM-TIDY-UP-PIPE-OF-AC-VSD-OBSTRUC-CABLE-TRAY-VCB-
Problem: Pipe AC is not tidy up yet
Action: see detail...
Status: done
2024-02-13
CAMERA-PYROMETER-DISMANTLE-FROM-BIG-DOOR-OF-KILN
Problem: Camera pyrometer is not dismantle at location
Action: see detail...
Status: done
2024-02-13
463-MD1-M2-INSTALL-SHAFT-MOTOR-INCHING-KILN
Problem: Shaft motor is not installing at side
Action: see detail...
Status: done
2024-02-13
ER-3-JUMPERED-ACB-AND-VCB
Problem: Jumpered ACB and VCB are not do at ER3
Action: see detail...
Status: done
2024-02-12
INSPECTION-ELECTRICAL-AND-WELDING-TOOL-OF-PT-CAT-AND-JANTAN-SETIA-SAKTI
Problem: Tools for electrical and welding are already expired tagging
Action: see detail...
Status: done
2024-02-12
393-BF3-REPAIRE-OR-SERVICE-SOLENOID-VALVE
Problem: Solenoid valve for bag filter are not repaire and service
Action: see detail...
Status: done
2024-02-12
463-KL1-INSTALL-MOTOR-SHELL-COOLING-FAN
Problem: Motor shell cooling fan are not install yet after service at work shop
Action: see detail...
Status: done
2024-02-12
463-MD1-M2-CHECK-MOTOR-INCHING
Problem: Motor inching kiln is not checking yet
Action: see detail...
Status: done
2024-02-09
443-BF2-CHECK-MOTOR-FOR-BAG-FILTER-ACCOMPANY-SURVEYOR
Problem: There is no employee for accompany surveyor checking motor bag filter
Action: see detail...
Status: done
2024-02-09
443-CT1-T3-REPLACE-THERMOCOUPLE-
Problem: Replace thermocouple is not replacing yet
Action: see detail...
Status: done
2024-02-09
ER-3-INSTALL-CABLE-TRAY-FOR-CABLE-PANEL-CONTROL-START-&-STOP-VCB
Problem: Cable tray cable panel control VCB ER3 is not installing yet
Action: see detail...
Status: done
2024-02-09
WORK-SHOP-REPLACE-BEARING-FOR-SHELL-COOLING-FAN
Problem: Bearing shell cooling fan is not yet replace yet
Action: see detail...
Status: done
2024-02-09
WORK-SHOP-INSPECTION-ELECTRICAL-TOOLS-OF-TOTAL-PRIMA-ENGINEERING
Problem: Tagging electrical tools of Total Prima Engineering are already expired
Action: see detail...
Status: done
2024-02-07
393-SC6-PREPARE-CABLE-FOR-NEW-MOTOR
Problem: Cable power for new motor is not install yet
Action: see detail...
Status: done
2024-02-07
443-CT1-T3-REPLACE-THERMOCOUPLE-AND-RELOCATION-TRANSMITTER
Problem: Reloation for transmitter is not ready yet
Action: see detail...
Status: done
2024-02-07
ER3-CONNECT-CABLE-CONTROL-VCB-START-&-STOP
Problem: Cable of panel VCB start and stop is not install yet
Action: see detail...
Status: done
2024-02-07
463-KL1-SERVICE-AND-CLEAN-UP-MOTOR-SHELL-COOLING-FAN
Problem: Motor shell are not service and clean up yet
Action: see detail...
Status: done
2024-02-06
ER3-INSTALL-CONTROL-START-AND-STOP-VCB
Problem: Control start and stop VCB is not install yet for panel
Action: see detail...
Status: done
2024-02-06
WORK-SHOP-INSTALL-POWER-220-VAC-AT-FISH-POOL
Problem: Power 220 VAC at fish pool is ready yet
Action: see detail...
Status: done
2024-02-06
363-BC1-DISCONNECT-CABLE-POWER-MOTOR
Problem: Cable motor is not disconnect yet
Action: see detail...
Status: done
2024-02-06
363-RM1-DISMANTLE-SENSOR-AT-GEAR-BOX
Problem: Sensor vibration and temperature are not dismantle yet
Action: see detail...
Status: done
2024-02-06
463-KL1-CHECK-FUNCTIONAL-MOTOR-SHELL-COOLING-FAN
Problem: Motor shell cooling fan are not check yet functional
Action: see detail...
Status: done
2024-02-06
TENT-OH-INSTALL-BIRGHT-LAMP-AND-POWER-FOR-DISPENSER
Problem: Bright lamp and power dispenser are not ready inside tent
Action: see detail...
Status: done
2024-02-05
TENT-OVERHAUL-INSTALL-BRIGHT-LAMP
Problem: Bright lamp are not install at tent
Action: see detail...
Status: done
2024-02-05
363-RM1-DISMANTLE-SENSOR-AT-GEAR-BOX
Problem: Sensor are not dismntle from gear box
Action: see detail...
Status: done
2024-02-05
ER3-PREPARE-JUMPERED-CABLE-FOR-ACB-AND-VCB
Problem: Cable jumpered are not ready yet
Action: see detail...
Status: done
2024-02-02
423-2K1-FLOWSIC-ERROR-INDICATION
Problem: Flowsic 100 is not service yet
Action: see detail...
Status: done
2024-02-02
WORK-SHOP-COMPLETING-WIRING-CONTROL-START-&-STOP-VCB-ER3
Problem: Wiring control start and stop VCB ER3 is not ready yet
Action: see detail...
Status: done
2024-02-02
WORK-SHOP-COMPLETING--WIRING-CONTROL-393-SC6
Problem: Control wiring 393 SC6 is not ready
Action: see detail...
Status: done
2024-02-01
WORK-SHOP-CONTINUE-WIRING-CONTROL-START-AND-STOP-VCB-ER3
Problem: Wiring control for VC ER3 is not ready yet
Action: see detail...
Status: done
2024-02-01
363-RM1-WBI-FEED-BIN,-RM-&-BAG-FILTER
Problem: Area feed bin, RM and Bag Filter are dirty by dust process
Action: see detail...
Status: done
2024-02-01
393-SC6A-PREPARE-CABLE-POWER-NEW-MOTOR
Problem: Cable power for new motor is not prepare yet
Action: see detail...
Status: done
2024-02-01
473-FAC-PREPARE-CABLE-FOR-RELOCATION-BLOWER
Problem: Cable for relocation blower is not ready
Action: see detail...
Status: done
2024-02-01
WORK-SHOP-CIVA-TAGGING-ELECTRICAL-TOOLS
Problem: Electrical and welding tools are already expired for tagging
Action: see detail...
Status: done
2024-01-31
473-CC1-WBI-BOTTOM-BLENDING,-KILN,-COOLER-AND-CLINKER-SILO
Problem: Area motor is not clean up and measure vibration also noise
Action: see detail...
Status: done
2024-01-31
443-PH1-WBI-TOP-BLENDING,-PH,-CT-AND-KILN
Problem: Area motor is not clean up and measure vibration also noise
Action: see detail...
Status: done
2024-01-31
WORK-SHOP-WIRING-CONTROL-START-AND-STOP-VCB-ER3
Problem: Control VCB ER3 is not ready
Action: see detail...
Status: done
2024-01-31
WORK-SHOP-REPAIRE-LAMP-LIGHTING
Problem: Lamp lighting off is not repaire yet
Action: see detail...
Status: done
2024-01-31
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston dirt by dust process
Action: see detail...
Status: done
2024-01-30
463-KL1-PMR-SERVICE-IR-TAD,-TSCANNER,-PYROMETER,CCTV
Problem: Lens of IR TAD-CCTV-T scanner- pyrometer dirt by dust process
Action: see detail...
Status: done
2024-01-30
TPM-463-MD1-COMPLETING-DATA-AM,-AND-SAFETY
Problem: Data TPM for AM and safety are not ready yet
Action: see detail...
Status: done
2024-01-30
363-RM1-PMR-SERVICE-MOTOR
Problem: Area motor and filter motor dirt by dust process
Action: see detail...
Status: done
2024-01-29
WORK-SHOP-MECHANIC-NR1-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Electric and welding tools of mechanic already expired
Action: see detail...
Status: done
2024-01-30
WORK-SHOP-MECHANIC-NR1-CONTINUE-INSPECTION-TOOL-AREA--MR.SUDIHARTOYO
Problem: Electric and welding tools of mechanic already expired
Action: see detail...
Status: done
2024-02-01
363-RM1-WBI-AREA-FEED-BIN,-RAW-MILL,-BAG-FILTER
Problem: Area RM, BF, and feed bin are dirt by dust process
Action: see detail...
Status: done
2024-01-30
463-MD1-M2-HIGH-VIBRATION
Problem: Motor high vibration, greasing for free and load side are not yet do
Action: see detail...
Status: done
2024-01-30
463-KL1-PMR-SERVICE-MV-AND-DC-MOTOR
Problem: Area motor and filter motor dirt by dust process
Action: see detail...
Status: done
2024-01-30
423-2K1-PMR-SERVICE-CEMS
Problem: Filter purge air for dust hunter and flowsic 100, swivel window dust hunter, transducer flowsic, filter cabinet dirt by dust process
Action: see detail...
Status: done
2024-01-30
L63-RM1-PMR-SERVICE-ANALYZER-COAL-MILL
Problem: Flange probe, sample line, filter probe, membran pump, dryer gas, filter balston dirt by coal dust
Action: see detail...
Status: done
2024-01-26
WORK-SHOP-CONTINUE-FINNISH-TOOL-BOX-TPM-
Problem: Tool box TPM is not ready
Action: see detail...
Status: done
2024-01-26
WORK-SHOP-COMPLETING-SGIN-SAFETY-AREA-TPM
Problem: Sign safety are not install yet at area TPM 463 MD1
Action: see detail...
Status: done
2024-01-26
WORK-SHOP-COMPLETING-DATA-DASHBORAD-AM,-SAFETY-AND-ABSENT
Problem: Data dashboard AM, safety and absent are not ready yet
Action: see detail...
Status: done
2024-01-26
443-EL1-REPLACE-DOOR-BELT-WEST-SIDE
Problem: Belt door for west side need to replace for safety
Action: see detail...
Status: done
2024-01-26
463-MD1-HOUSE-KEEPING-TPM-AREA
Problem: Area TPM is need to clean, dashboard TPM and lamp are not install yet
Action: see detail...
Status: done
2024-01-25
363-BE1-M2-STRENGTEN-SUPPORT-LCS
Problem: Support LCS is not streng enough
Action: see detail...
Status: done
2024-01-25
433-BF2-MAKE-DATA-PART-PROJECT-LIKE-MOTOR,-PLC,-MAGNAHELIC-CABLE,-MCC,-LCS
Problem: Data part project is not ready for company of work
Action: see detail...
Status: done
2024-01-25
WORK-SHOP-COMPLETING-DATA-TPM
Problem: Data TPM is not complete yet at data electrical nr1
Action: see detail...
Status: done
2024-01-25
443-EL1-REPLACE--OR-REPAIRE-V-BELT-2ND-FLOOR
Problem: V belt separated for west and east side are not replace
Action: see detail...
Status: done
2024-01-25
ER6-CLEAN-UP-FLOOR,-TOP-PANEL,-SPIDER-HOME,-OUTSIDE-ROMMOF-ELECTRICAL-
Problem: Floor electrical inside and outside, top panel dirt by dust of coal
Action: see detail...
Status: done
2024-01-24
WORK-SHOP-INSTALL-CAMERA-BACK-&-FRONT-SIDE,-SPARE-PART-AND-TOOLS-ROOM
Problem: Camera is not install yet
Action: see detail...
Status: done
2024-01-24
363-BE1-M2-REPAIRE-SUPPORT-LCS
Problem: Support LCS is not ready for support failing
Action: see detail...
Status: done
2024-01-24
473-EH5-INSTALL-STICK-STOPPER-TRAVEL
Problem: Stick stopper is not ready yet
Action: see detail...
Status: done
2024-01-24
423-2K1-PMR-SERVICE-CEMS
Problem: Filter purge air unit, swivel window dust hunter, transducer flowsic 100 dirt by dust process
Action: see detail...
Status: done
2024-01-24
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Flange probe, sample line, filter probe,membran pump dirt of dust coal
Action: see detail...
Status: done
2024-01-23
463-KL1-PMR-SERVICE-PYROMETER,-T-SCANNER,-TAD,-CCTV
Problem: Flange pyrometer, lens IR TAD, lens CCTV and Tscanner are dirt
Action: see detail...
Status: done
2024-01-23
473-EH5-CONTINUE-INSTALL-REMOTE
Problem: Remote for hoist is not ready yet
Action: see detail...
Status: done
2024-01-23
463-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, sample line, filter probe,membran pump, dryer gas filter balston dirty
Action: see detail...
Status: done
2024-01-23
WORK-SHOP-ELECTRIC-NR1
Problem: service lamp off
Action: see detail...
Status: done
2024-01-22
WORK-SHOP-FABRICATION-SUPPORT-LORI-TYRE
Problem: Tyre lori is not ready yet
Action: see detail...
Status: done
2024-01-22
443-EH2-TEST-WEIGHT-2-TON
Problem: Hoist is not test for weight
Action: see detail...
Status: done
2024-01-22
473-EH4-CONTINUE-CONNECTION-CABLE-AND-REPLACE-REMOTE
Problem: Cable is not connection yet
Action: see detail...
Status: done
2024-01-22
433-EH1-REPLACE-OR-INSTALL-LAMP-AREA-BOTTOM-HOIST-
Problem: Lamp is off still not replace yet
Action: see detail...
Status: done
2024-01-22
463-KL1-AND-363-RM1-PMR-SERVICE-MC-AND-DC-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2024-01-22
WORK-SHOP-PLANT-BUILDING--INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: tagging for electrical and welding tools by plant building already expired
Action: see detail...
Status: done
2024-01-19
423-2K1-CALIBRATION-SO2-
Problem: Reading SO2 gas upnormal
Action: see detail...
Status: done
2024-01-19
443-BE1-BOTTOM-REPLACE-LAMP-THAT-IS-OFF
Problem: Lamp off is not replace
Action: see detail...
Status: done
2024-01-19
443-PH1-CONTINUE-ADJUST-BREAKER-HOIST
Problem: Breaker is noy adjust properly
Action: see detail...
Status: done
2024-01-19
473-EH4-CONTINUE-REMOTE-STILL-CAN-NOT-USE
Problem: Remote hoist can not use properly
Action: see detail...
Status: done
2024-01-19
463-KL1-TYRE-1-HOUSE-KEEPING-FOCUS-AREA
Problem: Tyre 1 is not clean up yet
Action: see detail...
Status: done
2024-01-19
WORK-SHOP-PLANT-BUILDING-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Tagging electrical and welding tools of plant building already expired
Action: see detail...
Status: done
2024-01-18
393-SC5-INSTALL-MOTOR-AND-TEST-RUN
Problem: Installing motor is not ready at local
Action: see detail...
Status: done
2024-01-18
WORK-SHOP-PLANT-BUILDING-INSPECTION-ELECTICAL-AND-WELDING-TOOLS
Problem: Electrical and welding tools are already expired tagging
Action: see detail...
Status: done
2024-01-17
PMR-CLEANUP-MCC-ER4
Problem: MCC ER4 are not clean up yet
Action: see detail...
Status: done
2024-01-17
WBI-HOIST-BURNER-FLOOR-AND-CLINKER-SILO
Problem: Hoist are not check yet for functional
Action: see detail...
Status: done
2024-01-17
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Sample line, filter, flange probe full material of coal, also filter balston
Action: see detail...
Status: done
2024-01-17
PPUP-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Electrical and welding tools are already expired for tagging
Action: see detail...
Status: done
2024-01-16
393-SC5-CHECK-EOCR-MCAND-BREAKER-MAKE-SURE-ALL-ARE-NORMAL-CONDITION
Problem: EOCR, MC and breaker are not check for normal condition
Action: see detail...
Status: done
2024-01-16
393-SC5-CHECK-HARP-MOUNT-MOTOR-AND-PREPARE-REPLACE-FOOT-MOTOR
Problem: HARP motor is not still check yet, motor replacement foot is not prepare yet
Action: see detail...
Status: done
2024-01-18
423-2K1-PMR-SERVICE-CEMS
Problem: CEMS analyzer are not service yet
Action: see detail...
Status: done
2024-01-16
463-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston dirt by dust process
Action: see detail...
Status: done
2024-01-15
473-EH4-CONTINUE-INSTALATION-POWER-HOIST
Problem: Power HOIST is not install yet
Action: see detail...
Status: done
2024-01-15
PPUP-WORK-SHOP-INSPECTIONELECTRICAL-AND-WELDING-TOOLS
Problem: tagging for electrical and welding tools by PPUP already expired
Action: see detail...
Status: done
2024-01-15
363-RM-L63-RM-443-PH-WBI-HOIST
Problem: HOIST for area RM,COAL MILL, and PH are not check yet
Action: see detail...
Status: done
2024-01-15
463-KL1-PMR-SERVICE-MEDIUM-VOLTAGE-AND-DC-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2024-01-15
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2024-01-12
473-EH4-CONNECT-POWER-HOIST
Problem: Power HOIST is not connecting
Action: see detail...
Status: done
2024-01-12
473-HS3-INSTALL--MODULE-MC
Problem: Module MC of 473 HS3 is not install
Action: see detail...
Status: done
2024-01-12
463-KL1-TPM-TYRE-2-PREPARING
Problem: TPM for tyre 2 at 463 KL1 still not prepare
Action: see detail...
Status: done
2024-01-12
IDO-L1C-BC4-L1C-BC5-CHECK-AUTOMATIC-SUMP-PUMP
Problem: Functional automatic sump pump is still not service
Action: see detail...
Status: done
2024-01-12
L63-RM1-PMR-SERVICE-CM
Problem: Flange probe, sample line, filter probe,membran pump dirt of dust coal
Action: see detail...
Status: done
2024-01-12
473-FA1-FA2-FA3-FA4-FA5-FA6
Problem: Check and service memolube
Action: see detail...
Status: done
2024-01-11
473-EH4-CONTINUE-INSTALL-POWER-HOIST
Problem: Power hoist is not install yet
Action: see detail...
Status: done
2024-01-11
L1C-BC7-CHECK-AND-SERVICE-WATER-SPRAY
Problem: Functional for water spray is not test yet
Action: see detail...
Status: done
2024-01-11
433-BE1-AND-COOLER-FAN-REFILL-MEMOLUBE
Problem: Memolube is not refill yet
Action: see detail...
Status: done
2024-01-11
423-2K1-CONTINUE-TROUBLE-SHOOTING-
Problem: Problem at analyzer CEMS still exist
Action: see detail...
Status: done
2024-01-11
L63-RM1-WBI-ELECTRICAL-&-INSTRUMENTATION
Problem: Area motor and panel LCS are dirt by dirt of coal
Action: see detail...
Status: done
2024-01-10
473-EH4-CONTINUE-INSTALL-RELL-AND-POWER-PREPARE-PIPE-CONDUIT
Problem: RELL hoist and power are not install yet
Action: see detail...
Status: done
2024-01-10
423-2K1-CONTINUE-TROUBLE-SHOOTING-
Problem: Problem at analyzer CEMS still exist
Action: see detail...
Status: done
2024-01-10
HRG-REPAIRE-OR-REPLACE-MC-POWER
Problem: MC power failed is still not replace yet
Action: see detail...
Status: done
2024-01-10
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe dirt by dust process
Action: see detail...
Status: done
2024-01-09
473-EH4-INSTALL-RELL-HOIST-AND-REWAIRING-CONTROL-HOIST
Problem: Rell hoistis not install yet and wiring control hoist is not ready
Action: see detail...
Status: done
2024-01-10
L1C-BC7-REPPAIRE-WATER-SPRAY
Problem: Water spary is not working well
Action: see detail...
Status: done
2024-01-09
L1C-BC4-&-BC5-CHECK-AUTOMATIC-SUMP-PUMP-IDO
Problem: Automatic sump pump is no working well
Action: see detail...
Status: done
2024-01-09
423-2K1-PMR-SERVICE-CEMS
Problem: Analyzer CEMS is not service yet
Action: see detail...
Status: done
2024-01-09
L1C-BC1-BC2-BC3-REPLACE-LAMP-OFF
Problem: Lamp LED lot off still are not replace
Action: see detail...
Status: done
2024-01-08
443-Z4A--T1-&-T2-443-2ZB-T1-&-T2--CROSS-CHECK-TEMPERATURE-READING
Problem: Temperature are making doubt for operator CCR
Action: see detail...
Status: done
2024-01-08
463-2K1-AND-443-2K1-SERVICE-ANALYZER
Problem: Some reading are making doubt at CCR operator
Action: see detail...
Status: done
2024-01-08
BURNER-FLOOR-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-TRUBA-JAGA-CITA
Problem: Electrical and welding tools of PT TRUBA JAGA CITA already expired for tagging
Action: see detail...
Status: done
2024-01-08
LIC-BC2-FABRICATION-PROPELLER-MOTION-AND-REPAIRE-CONNECTION--AND-PIPA-CONDUIT-PIPE
Problem: Propeller motion is not ready
Action: see detail...
Status: done
2024-01-08
L1C-BC1-REPAIRE-LAMP
Problem: lamp off and blinking are still not repaire
Action: see detail...
Status: done
2024-01-08
473-EH5-INSTALL-RELL-HOIST
Problem: Rell hoist is not install yet at location
Action: see detail...
Status: done
2024-01-08
463-KL1-PMR-SERVICE-CRITICAL-MOTOR
Problem: Area motor and filter motor dirt by dust
Action: see detail...
Status: done
2024-01-08
363-RM1-PMR-SERVICE-CRITICAL-MOTOR
Problem: Area motor and filter motor dirt by dust process
Action: see detail...
Status: done
2024-01-05
ER-4-COVERED-LEAKAGE-AT-WALL--AND-ROOF-FOR-BOTTOM-ROOM
Problem: Leakage wall and roof still exist
Action: see detail...
Status: done
2024-01-05
473-EH4-INSTALL-RELL-FOR-CABLE
Problem: Rell for cable hoist is not ready
Action: see detail...
Status: done
2024-01-05
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, sample line, membran pump, filter balston, dryer gas dirt by dust process
Action: see detail...
Status: done
2024-01-05
WBI-TOP-BLENDING-CT-PRE-HEATER-AND-KILN
Problem: Area motor dirt by dust
Action: see detail...
Status: done
2024-01-05
473-EH4-PREPARE-CABLE-PLAT-OF-HOIST
Problem: Cable plat for hoist is not ready at work shop
Action: see detail...
Status: done
2024-01-04
WORK-SHOP-MECHANIC-NR1-CONTINUE-CONNECT-CABLE-CAMERA-TO-SERVER-NETWORK
Problem: Cable camera is not connecting to server network
Action: see detail...
Status: done
2024-01-04
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Filter probe, sample line, membran pump, balston filter, dryer gas dirt of coal
Action: see detail...
Status: done
2024-01-04
473-GQ1-WBI-BOTTOM-BLENDING-KILN-COOLER-CLINKER-SILO
Problem: Area motor for bottom blending, kiln, cooler, clinker silo are dirt by dust process
Action: see detail...
Status: done
2024-01-04
463-KL1-PMR-SERVICE-IR-TAD-TSCANNER-CCTV-PYROMETER
Problem: Lens of IR TAD, T scanner, CCTV, and Pyrometer are dirt by dust
Action: see detail...
Status: done
2024-01-04
363-RM1-WBI--AREA-FEED-BIN-RM-BAG-FILTER
Problem: Area feed bin, RM, and Bag Filter are dirty of dust process
Action: see detail...
Status: done
2024-01-03
CKD-LAMP-BRIGHT-IS-OFF
Problem: Replace bright lamp is really important
Action: see detail...
Status: done
2024-01-03
WORK-SHOP-MECHANIC-NR1-CONNECT-CABLE-TO-SERVER-NETWORK
Problem: Cable camera CCTV is need to connect to server network
Action: see detail...
Status: done
2024-01-03
443-W1-M3-SUPPORT-ALIGNTMENT
Problem: Job alignment need support
Action: see detail...
Status: done
2024-01-03
443-FN1-MONITOR-NEW-VIBRATION-SENSOR
Problem: Reading of new vibration sensor is fluctuative
Action: see detail...
Status: done
2024-01-03
463-2K1-CHECK-FILTER-HUMIDITY
Problem: Filter humidity often give error to CCR
Action: see detail...
Status: done
2024-01-03
FEED-BIN-WBI-ELECTRICAL-AND-INSTRUMENTATION-AND-CHECK-IO-PANEL-FEED-BIN
Problem: I/O panel are not yet clean up
Action: see detail...
Status: done
2024-01-03
L63-RM1-REPACE-BRIGHT-LAMP-THAT-ARE-OFF
Problem: bright lamp that are off not yet replace with good lamp
Action: see detail...
Status: done
2024-01-02
463-2K1-CHECK-READING-OF-GAS-CO--0.0052-VOL%
Problem: Filange probe, probe,filter probe dirt by dust process
Action: see detail...
Status: done
2024-01-02
443-W1-M1-MONITOR-VIBRATION-NOISE-AND-TEMPERATURE-FOR-FREE-SIDE-AT-LOAD-SIDE
Problem: Vibration, noise and temperature is not monitor very well
Action: see detail...
Status: done
2024-01-02
WORK-SHOP-MECHANIC-INSTALL-CCTV-FOR-2-EACH
Problem: CCTV at work shop is not install yet
Action: see detail...
Status: done
2024-01-02
463-KL1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor,filter motor dirt by dust process
Action: see detail...
Status: done
2024-01-02
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor,filter motor dirt by dust process
Action: see detail...
Status: done
2024-01-02
443-Z2B-PREPARE-SPARE-THERMOCOUPLE
Problem: Spare T/C is not ready at work shop
Action: see detail...
Status: done
2024-01-02
333-WF1-CALIBRATION-ZERO-AND-SPAN
Problem: weigh feeder is need to calibration for zero and span
Action: see detail...
Status: done
2023-12-29
443-FN1-INSTALL-NEW-VIBRATION-SENSOR-PULLING-NEW-CABLE-SENSOR-TO-ER4-WRAP-SENSOR-USE-ASBESTOS
Problem: New vibration sensor is not install ye
Action: see detail...
Status: done
2023-12-29
363-MD1-PM-RAW-MILL-MEASURE-RMEGGER-LINE-TO-GROUND-AND-CLEAN-UP-CARBON-BRUSH-ROOM-FROM-DIRT-OF-DUSTESISTANCE-
Problem: Carbon brush room need to be clean up and resistance from line to ground need to be check with megger
Action: see detail...
Status: done
2023-12-29
BURNER-FLOOR-WEST-SOUTH-SIDE-CONNECT-CABLE-POWER-220-VAC-REPAINTING-EX-WELDING-AT-PIPE-CABLE-POWER
Problem: Cable power input 220 VAC still not connecting
Action: see detail...
Status: done
2023-12-22
LA3-VA1-TPM-GUN-SOLAR-CLEAN-UP-AREA-INSTALL-SIGN-SAFETY-AND-PAINTING
Problem: Area TPM dirt by dust need to be clean up, sign safety is not install yet, paint for area TPM is not good view
Action: see detail...
Status: done
2023-12-28
WORK-SHOP-TOOL-BOX-TPM-ONTINUE-FABRICATION-AND-PAINTING
Problem: Tol box for TPM is not ready yet and need to be painting yellow color
Action: see detail...
Status: done
2023-12-28
L3A-BC2-COMPLETED-NUT-COVER-FAN-REPAIRE-GLAND-TERMINAL-BOX-TLS-AND-CONDUIT
Problem: Cover fan is missing nut 3 each, cable gland at terminal box TLS also conduit
Action: see detail...
Status: done
2023-12-28
L63-LQ1-TIDY-UP-CABLE-OUT-FROM-CABLE-GLAND-MOTOR-AND-CABLE-POWER-SUPPLY
Problem: Cable is not tidy because out form cable gland motor and cable power supply
Action: see detail...
Status: done
2023-12-28
473-EH5-CONTINUE-CONNECT-CABLE
Problem: Cable power is still not connecting
Action: see detail...
Status: done
2023-12-28
L1C-BC1-NUT-COVER-FAN-MISS-2-EACH-ACTIVATED-MOTION-DETECTOR
Problem: Motion detector is not active yet. Nut cover need to be replace
Action: see detail...
Status: done
2023-12-28
363-RM1-REWIRING-FOR-SAFETY-UPPER-HOIST
Problem: Wiring safety upper HOIST still is not doing
Action: see detail...
Status: done
2023-12-28
L63-RM1-PMR-SERVICE-ANALYZER-COAL-MILL
Problem: Flange probe, sample line, filter probe, membran pump, dryer gas, filter balston dirt by coal dust
Action: see detail...
Status: done
2023-12-26
463-KL1-PMR-SERVICE-MEDIUM-VOLTAGE-AND-DC-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2023-12-26
BURNER-FLOOR-WEST-AND-SOUTH-SIDE-INSTALL-POWER-220-VAC
Problem: Power 220 VAC at burner floor is not ready yet
Action: see detail...
Status: done
2023-12-26
393-SC7-&-L1C-TR1-ASSEMBLING-MOTOR
Problem: Motor spare are still not assembling and do test run
Action: see detail...
Status: done
2023-12-26
433-W1-M3-MOTOR-BRING-TO-WS-MR.DWI-FOR-REBUSHING-HOUSING-BEARING-DISMANTLE-SPARE-MOTOR-FOR-LATHEAT-SHAFT
Problem: Motor existing housing bearing is not enough for inside bearing
Action: see detail...
Status: done
2023-12-27
HRG-REPLACE-SIRCULATION-PUMP
Problem: Sirculation pump is bad condition
Action: see detail...
Status: done
2023-12-27
463-KL1-PMR-SERVICE-IR-TAD-TSCANNER-PYROMETER-CCTV
Problem: Lens IR TAD and Tscanner dirt by dust. Camera CCTV and pyrometer also not clean enough
Action: see detail...
Status: done
2023-12-27
463-2K1-REPAIRE-MIDDLE-FRAME
Problem: Middle frame is not good condition
Action: see detail...
Status: done
2023-12-27
463-2K1-AND-443-2K1-PMR-SERVICE-ANALYZER
Problem: Filter probe, flange probe, probe, sample line, membran pump, dryer gas, filter balston dirty by dust process
Action: see detail...
Status: done
2023-12-27
BURNER-FLOOR-WEST-AND-SOUTH-SIDE-INSTALL-POWER-220-VAC
Problem: Pipe for cable power 220 VAC still not install yet, cable power is not connecting
Action: see detail...
Status: done
2023-12-27
363-CA1-SERVICE-CONTROL-HOIST-TIGHTENING-TERMINATION-BLOW-OUT-PANEL-ALSO-TIGHTENING-MOTOR-TERMINATION
Problem: Control Hoist still and termination are still not service and check. Panel dirt from dust
Action: see detail...
Status: done
2023-12-27
LA3-VA1-AREA-TPM-CLEAN-UP-AREA-BEFORE-ASSESMENT
Problem: Area gun solar very dirty from dust, beam also dirt
Action: see detail...
Status: done
2023-12-26
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor and filter motor dirty from dust. Vibration and noise for DE also NDE need to be check
Action: see detail...
Status: done
2023-12-22
473-EH4-INSTALL-CONTROL-AND-DO-COMISIONING
Problem: Cable power still is not connecting
Action: see detail...
Status: done
2023-12-22
433-PG1-INSTALL--SOLENOID-VALVE-MANUAL-PG-FROM-CCR
Problem: Solenoid valve manual is not install yet
Action: see detail...
Status: done
2023-12-22
473-EH4-INSTALL-CONTROL-HOIST
Problem: Control Hoist is not istalling yet
Action: see detail...
Status: done
2023-12-22
L63-RM1-WBI-REPAIRE-OR-REPLACE-FAIL-ELCB
Problem: ELCB fail is not replacing yet
Action: see detail...
Status: done
2023-12-21
OHS-TRAINING-SAFETY-OHIH-MOBILE-EQUIPMENR-HOT-WORK-BASIC-SAFETY-RISK-ASSESMENT
Problem: Module safety are not taking yet
Action: see detail...
Status: done
2023-12-11
WORK-SHOP-DRAWING-INPUT-OUTPUT-PANEL-
Problem: I/O panel drawing is not drawing yet
Action: see detail...
Status: done
2023-12-11
L1C-RE1-TAKE-NEW-MOTOR-SPARE-AT-WARE-HOUSE
Problem: New motor spare for L1C-RE1 is not ready yet
Action: see detail...
Status: done
2023-12-11
433-PF1-CALIBRATION-ZERO-AND-SPAN
Problem: Pfister feeder need to be calibrate
Action: see detail...
Status: done
2023-12-11
393-SC6-TEST-RUN-WAIRING-PANEL
Problem: Panel screw is not yet test run
Action: see detail...
Status: done
2023-12-19
393-BF1-MEMBRAN-DEFLATED-4-EACH
Problem: Deflated membran bag filter
Action: see detail...
Status: done
2023-12-12
L1C-BC7-INSTALL-SUPPORT-LIGHT-POLE
Problem: Support light pole is not install yet
Action: see detail...
Status: done
2023-12-12
423-2K1-PMR-SERVICE-CEMS
Problem: Filter purge air unit, swivel windows, transducer A-B dirty
Action: see detail...
Status: done
2023-12-12
363-RM1-&-463-KL1-PMR-SERVICE-MV-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2023-12-12
423-2K1-MONITOR-JOB-WELDING-AT-STACK
Problem: Welding job at stack need monitor from sbi's employee
Action: see detail...
Status: done
2023-12-13
483-BL7-CHECK-GREASE-TUBE
Problem: Grease tube un normal condition
Action: see detail...
Status: done
2023-12-13
463-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, sample line, filter probe,membran pump, dryer gas filter balston dirty
Action: see detail...
Status: done
2023-12-15
433-PG1-PREPARE-REPLACEMENT-PART
Problem: Spare part replacement PG is not prepare
Action: see detail...
Status: done
2023-12-15
493-AC1-INSTALL-COVER-PROPELLER-SPEED-SENSOR
Problem: Cover propeller speed sensor is not install yet
Action: see detail...
Status: done
2023-12-20
473-GQ1-REPAIRE-OR-REPLACE-FAIL-ELCB
Problem: ELCB is not function well
Action: see detail...
Status: done
2023-12-20
443-PH1-REPAIRE-OR-REPLACE-FAIL-ELCB
Problem: ELCB is not function well
Action: see detail...
Status: done
2023-12-20
473-EH4-CONTINUE-INSTALL-RELL-AND-CABLE-POWER
Problem: Rell and cable power for hoist are not install yet
Action: see detail...
Status: done
2023-12-19
463-2K1-&-443-2K1-PMR-SERVICE-ANALYZER
Problem: Flange probe, probe, filter probe, membran pump filter balston, dryer gas dirty
Action: see detail...
Status: done
2023-12-19
363-EH1-CHECK-AND-SERVICE-BOTTOM-HOIST-CYCLONE
Problem: Functional hoist is not working well
Action: see detail...
Status: done
2023-12-18
463-KL1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2023-12-18
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor dirty, filter motor, measure vibration, noise, temperature motor for free side and load side
Action: see detail...
Status: done
2023-12-18
WORK-SHOP-MAKE-PPT-AND-UPDATE-VIDEO-ELEVATOR
Problem: PPT elevator after finish send to Mr Iwan Kurnia
Action: see detail...
Status: done
2023-12-20
L63-RM1-PMR-SERVICE-ANALYZER-
Problem: Flange probe, sample line, filter probe,membran pump dirt of dust coal
Action: see detail...
Status: done
2023-12-19
363-RM1-FEED-BIN-423-BF1-BLENDING-EAST-AND-WEST
Problem: Check ELCB, repaire or replace fail socket at panel welding
Action: see detail...
Status: done
2023-12-18
ER-5-PMR-MCC-LOAD
Problem: MCC LOAD NEED TO CHECK FOR SAFETY INFORMATION COLLECTING AND WRITE AT FORM
Action: see detail...
Status: done
2023-12-15
443-PH1-REPAIRE-HANDLE-LIMIT-SWITCH-USE-SLING-OR-ROPE
Problem: Original handle too heavy so make limit switch is not funcion
Action: see detail...
Status: done
2023-12-14
363-FN1-CLEAN-PIPE-CHILLER-MOTOR
Problem: pipe chiller motor dirt by dust from plant
Action: see detail...
Status: done
2023-12-13
L63-RM-WBI-COAL-MILL-TRIPPER-TRUCK-LIFT-RECLAIMER
Problem: Area motor, RF, SR dirt of coal
Action: see detail...
Status: done
2023-12-12
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Filter probe, sample line, membran pump, balston filter, dryer gas dirt of coal
Action: see detail...
Status: done
2023-12-11
WIRING-MCC-393-SC6-WORK-SHOP-ELECTRIC-NR1
Problem: Panel MCC 393 SC6 need to be test run without load
Action: see detail...
Status: done
2023-12-08
ASSEMBLING-MOTOR-7.5-KW-AT-WORK-SHOP
Problem: motor 7.5 kw still not assembling
Action: see detail...
Status: done
2023-12-08
LA3-VA1-TPM
Problem: Hand rail and sensor pneumatic color are not good condition
Action: see detail...
Status: done
2023-12-07
393-SC6-WIRING-ELECTRICAL-AT-CUBICAL
Problem: there is no wiring electrical for 393 SC6 at cubical
Action: see detail...
Status: done
2023-12-07
L63-RM1-ANALYZER-L63-2K2-L63-2K1&L63-2K3
Problem: AC room of analyzer room are not function well
Action: see detail...
Status: done
2023-12-06
443-PH1-8TH-FLOOR-CHECK-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-PT-TRUBA-JAGA-CITA
Problem: Tagging for electrical and welding tools of PT TRUBA JAGA CITA already expired
Action: see detail...
Status: done
2023-12-05
463-KL1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area and filter motor dirt by dust
Action: see detail...
Status: done
2023-12-04
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Sample line, filter, flange probe full material of coal, also filter balston
Action: see detail...
Status: done
2023-12-01
WBI-ELECTRIC-&-INSTRUMENTATION-&-CHECK-I_O-CM-TRUCK-LIFT-TRIPPER
Problem: panel I/O are need check condition at field
Action: see detail...
Status: done
2023-12-01
443-PH1-TPM-PAINTING-TANK-INSTUREMENT-AIR-PIPE-WAY,-HSUPPORT-PANEL-BASE-PLATE-LA3-VA1-AND-INSTALL-SIGN-SAFTEY-METERIAL-HOTAND-RAIL-
Problem: Tank instrument air and pipe are not yet painting with blue color, support panel also base plate LA3 VA1 are not painting with grey color
Action: see detail...
Status: done
2023-11-30
L1C-EH1-L1C-EH2
Problem: WBI Electric Hoist L1C EH1 and L1C EH2
Action: see detail...
Status: done
2023-11-29
443-PH1-3RD-FLOOR-TPM-
Problem: Sign Exit, House keeping tools, tube for water and air are not install yet
Action: see detail...
Status: done
2023-11-28
443-PH1-3RD-FLOOR-TPM-
Problem: Clean up area gun solar LA3 VA1-hand rail-ducting pre heater from dirt dust
Action: see detail...
Status: done
2023-11-27
463-2K1-AND-443-2K1-PMR-ANALYZER
Problem: Filter probe dirty, sampling line , diaphragm pump, dryer gas dirty from dust
Action: see detail...
Status: done
2023-11-24
443-PH1-3RD-FLOOR-TPM-GUN-SOLAR
Problem: Clean up area hand rail, trash bin
Action: see detail...
Status: done
2023-11-23
CHECK-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-MECHANIC-KILN-NR1
Problem: Tagging equipment electrical and welding tools of mechanic kiln nr1 already expired
Action: see detail...
Status: done
2023-11-23
363-RM1-CHECK-PANEL-LIGHTING-&-WELDING,-MCC-DOOR-ROOM-MUST-BE-LOCK,-ALSO-PANEL-INPUT-OUTPUT-PANEL-MUST-BE-LOCK-CHECK-EMERGENCY-LAMP-ER3-
Problem: Panel lighting and welding not lock tight worry water and dust come inside. MCC door also is not lock properly, functional lamp emergency is off
Action: see detail...
Status: done
2023-11-22
443-W1-M3-MONITOR-NOISE-BEARING;-L1C-BC7-LAMP-ALL-BC-OFF-CHECK
Problem: noise bearing for motor is high check, check lamp at L1C BC7 are off when start manual on
Action: see detail...
Status: done
2023-11-21
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Sample line, filter, flange probe full material of coal
Action: see detail...
Status: done
2023-11-17
INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-MECHANIC-KILN-NR2
Problem: tagging for electrical and welding tools of mechanic kiln nr2 already expired
Action: see detail...
Status: done
2023-11-16
MECHANIC-KILN-NR2-INSPECTION-TOOLS-HG-AND-PPUP
Problem: tagging for electrical and welding tools of mechanic kiln nr2 already expired
Action: see detail...
Status: done
2023-11-15
INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-MECHANIC-KILN-NR2
Problem: tagging for electrical and welding tools of mechanic kiln nr2 already expired
Action: see detail...
Status: done
2023-11-14
INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-MECHANIC-NR1
Problem: tagging for electrical and welding tools by mechanic nr1 already expired
Action: see detail...
Status: done
2023-11-13
WORK-SHOP-MECHANIC-NR1
Problem: tagging for electrical and welding tools of mechanic already expired
Action: see detail...
Status: done
2023-11-09
INSPECTION-ELECTRICAL-TOOLS-AND-ASSEMBLING-PORTABLE-LAMP-AT-WORK-SHOP
Problem: LED Lamp still don't have cable power and electrical tools tagging already expired
Action: see detail...
Status: done
2023-11-08
WOTK-SHOP-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS
Problem: Tagging of electrical and welding tools for Electrical Nr1 need new tagging
Action: see detail...
Status: done
2023-11-07
COMPLETING-LAMP-CABLE--LED-LAMP-POWER-AND-INSPECTION-ELECTRCIAL-TOOLS-OF-PT-ASC
Problem: LED Lamp still don't have cable power, Electrical tools of PT ASC still don't have full fill requirement of PT SBI
Action: see detail...
Status: done
2023-11-07
COMPLETING-LAMP-CABLE--LED-LAMP-POWER
Problem: LED Lamp still don't have cable power
Action: see detail...
Status: done
2023-11-03
LED-LAMP-CONNECT-CABLE-POWER
Problem: LED lamp completing cable power around 20 meter every lamp
Action: see detail...
Status: done
2023-11-02
393-SC7
Problem: check motor condition
Action: see detail...
Status: done
2023-11-01
COMPLETING-DATA-SHEET-WBI
Problem: Completing data sheet WBI 363 MD1, Trafo & UPS 2023
Action: see detail...
Status: done
2023-10-31
COMPLETING-DATA-CHECK-SHEET-WBI-&-PMR-2023
Problem: Completing data check sheet WBI and PMR 2023
Action: see detail...
Status: done
2023-10-30
COMPLETING-DATA-CHECK-SHEET-WBI-2023
Problem: Completing data check sheet WBI Welding and Lighting panel 2023; WBI CM-TR-Tripper 2023 for October & September; WBI Bottom Blending-Kiln-Cooler-Clinker Silo 2023 for October & September; WBI Switchgear 2023
Action: see detail...
Status: done
2023-10-30
443-PH1-3-FOOR-303-FA5-A
Problem: Gemba Focus Area, Installing new motor spare
Action: see detail...
Status: done
2023-10-26
393-FA5-A
Problem: replace motor with spare motor and replace bearing existing motor
Action: see detail...
Status: done
2023-10-25
493-3S1-473-FA4-473-FA6
Problem: Clean up area sensor VEGA, clean up area motor
Action: see detail...
Status: done
2023-10-24
COMPLETING-DATA-WBI-
Problem: completing data WBI Feed Bin-RM-Dust Transport and BF; Data stop PM WF
Action: see detail...
Status: done
2023-10-24
L93-BF1
Problem: Install cable power lamp to existing cable power
Action: see detail...
Status: done
2023-10-19
L93-BF1
Problem: replace lamp off
Action: see detail...
Status: done
2023-10-18
463-BU1-PANEL-WELDING
Problem: dismantle original panel welding that is burned
Action: see detail...
Status: done
2023-10-18
L63-RM1-PMR-ANALYZER
Problem: Filter probe, flange, sample line, membran pump, filter balston dirty from dirt of coal, check humidity sensor
Action: see detail...
Status: done
2023-10-16
473-EH2
Problem: Travel switch cable is not connecting
Action: see detail...
Status: done
2023-10-13
443-PH1-24BT1-AND-Z4A-T1
Problem: Cross check temperature indication
Action: see detail...
Status: done
2023-10-12
363-RM-CKD,-463-KL1,443-PH1-7TH-FLOOR
Problem: Inspection electrical and welding tools of PT TRUBA JAGA CITA
Action: see detail...
Status: done
2023-10-10
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: clean up area motor, measure vibration and noise for Load Side and Free Side Motor
Action: see detail...
Status: done
2023-10-09
463-KL1-PMR-IR-TAD,CCTV,TSCANNER,CAMERA-BURNER
Problem: Lens and flange IR TAD dirt, Lens of CCTV dirt, Surface lens of T_Scanner dirt, Lens and flange Camera Burner also dirt
Action: see detail...
Status: done
2023-10-06
ER3-ER4-ER5
Problem: Filter drive cabinet dirty with dirt
Action: see detail...
Status: done
2023-10-05
493-AC3
Problem: Repaire TLS sensor
Action: see detail...
Status: done
2023-10-04
L63-RM1-PMR-ANALYZER
Problem: Filter probe, flange, sample line, membran pump, filter balston dirty from dirt of coal
Action: see detail...
Status: done
2023-10-03
483-BL7-483-BL5-453-BL1
Problem: Install support LOTO at ER 4
Action: see detail...
Status: done
2023-09-25
363-RM,443-PH1,L63-RM-WBI-HOIST
Problem: area motor dirt from dust
Action: see detail...
Status: done
2023-09-22
473-LD1-GEMBA-TPM
Problem: area motor, hand rail, plat form dirt
Action: see detail...
Status: done
2023-09-21
363-MW1-SG1
Problem: Slide gate can not function when ask open or close from CCR
Action: see detail...
Status: done
2023-09-21
REFRESHING-TRAINING-SAFETY-SCHOOL
Problem: confine space equipment, work at height, LOTOTO
Action: see detail...
Status: done
2023-09-19
L63-RM1-WBI-ELECTRIC-&-INSTRUMENTATION-I_O-SUMP-PUMP
Problem: Area motor, LCS, Panel I/O dirty, check Belt Drive
Action: see detail...
Status: done
2023-09-18
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: Area motor dirty, measure vibration, noise and temperature for Load Side and Free Side
Action: see detail...
Status: done
2023-09-15
473-LD1-GEMBA-TPM
Problem: Hand rail floor 5 still not paint
Action: see detail...
Status: done
2023-09-14
L63-RM1-PMR-ANALYZER
Problem: Flange, sample line, filter probe, filter balston filter, humidity sensor filter, dryer gas dirt
Action: see detail...
Status: done
2023-09-13
443-KL1-WBI-TOP-BLENDING,-PRE-HEATER,-CT,-KILN
Problem: found some noise>2 gE and vibration > 4mm/s
Action: see detail...
Status: done
2023-09-12
483-BL5-CATRIDGE-GREASE-
Problem: Catridge grease 483 BL5 empty
Action: see detail...
Status: done
2023-09-12
463-KL1-PMR-IR-TAD,CCTV,-T-SCANNER-CAMERE-BURNER
Problem: Lens IR TAD, CCTV, Camera Burner, T Scanner dirty. Camera Burner room lamp off
Action: see detail...
Status: done
2023-09-11
363-RM-1-WBI-AREA-FEED-BIN,-BF,-RM,CT
Problem: area BF, motor dirty from dirt
Action: see detail...
Status: done
2023-09-08
L1C-BC5-WATER-SPRAY-BELT-CONVEYOR
Problem: water spray L1C BC5 is not function
Action: see detail...
Status: done
2023-09-07
443-PH1-8TH-FLOOR-
Problem: Automatic water spray can not function
Action: see detail...
Status: done
2023-09-05
L63-RM1-PMR-SERVICE-ANALYSER
Problem: filter,sample line,flange are dirty plug from coal, filter balston many water inside
Action: see detail...
Status: done
2023-09-01
473-LD1-TPM-
Problem: painting hand rail and wall of 473 LD1
Action: see detail...
Status: done
2023-08-31
ER-8
Problem: install Limit Switch for lamp and replace lamp inside electric room that are off
Action: see detail...
Status: done
2023-08-30
473-LD1-PAINTING-HANDRAIL-YELLOW-CALOUR
Problem: area hand rail dirty from dust
Action: see detail...
Status: done
2023-08-29
463-KL1
Problem: add grease for noise > 2 gE and vibration > 4 mm/s
Action: see detail...
Status: done
2023-08-28
WORK-SHOP,363-RM1,AFR
Problem: garbage are not put at same garbage tank for ER3 top and bottom, ER4 top and bottom, Work Shop
Action: see detail...
Status: done
2023-08-25
473-LD1-GEMBA-TPM
Problem: Clean up area motor, hand rail, motor
Action: see detail...
Status: done
2023-08-24
483-BL7-PANEL-WELDING-REPLACE-ELCB-63A
Problem: ELCB 63 A is bad condition
Action: see detail...
Status: done
2023-08-23
ER-3-3TR-301
Problem: Install indiction KW at I/O and Digital Input
Action: see detail...
Status: done
2023-08-22
423-FN1-443-FN1-CHECK-NOISE-FS-AND-LS
Problem: measure vibration, noise and temperature for fix side and load side
Action: see detail...
Status: done
2023-08-21
363-RM1-PMR-SERVICE-MEDIUM-VOLTAGE-MOTOR
Problem: measure vibration, noise, and temperature for load side also free side
Action: see detail...
Status: done
2023-08-16
L63-RM1-PMR-SERVICE-ANALYSER
Problem: sample line at L63 2K1 and L63 2K3 plug from material coal, inject by water to tube sample line and clean use instrument air
Action: see detail...
Status: done
2023-08-15
363-RM1-473-AREA,L63-RM1;443-PH1
Problem: WBI HOIST AND CRANE some can not run do dirty at rail, clean up rail use instrument air supply
Action: see detail...
Status: done
2023-08-14
463-MD1-473-FN7-CLEAN-UP-MOTOR-AND-CARBON-BRUSH
Problem: motor must off condition while clean up Carbon Brush room
Action: see detail...
Status: done
2023-08-11
443-PH1-TPM-PAINTING-FOR-CLEANING-TOOL-AND-INSTRUMENT-AIR,INSTALL-SIGN-SAFETY
Problem: make decision place for cleaning tools
Action: see detail...
Status: done
2023-08-10
WORK-SHOP-INSPECTION-RLECTRICAL-AND-WELDING-TOOLS
Problem: Some cable power is bad condition
Action: see detail...
Status: done
2023-08-09
463-KL1-PMR-SERVICE-IR-TAD,T-SCANNER,CCTV-CAMERA-BURNER
Problem: ccctv need some tools to reach lens CCTV, film T scanner at panel east side crack
Action: see detail...
Status: done
2023-08-08
WORK.SHOP-DATA-ENTRY-SPARE-PART,-DATA-ENTRY-FORM-PMR-SERVICE-CRTITICAL-MOTOR-KILN
Problem: Problem some spare part quantity not same with actual
Action: see detail...
Status: done
2023-08-07
WORK-SHOP-INSPECTION-ELECTRICAL-TOOL
Problem: Some tools are bad condition
Action: see detail...
Status: done
2023-08-04
443-WI1-M3-REPLACE-BEARING-MOTOR
Problem: Bearing is bad condition now when motor test run manual
Action: see detail...
Status: done
2023-08-03
L63-FN1-CLEAN-UP-BODY-MOTOR.-443-PH1-6THAUTO-FILLINF-WATER
Problem: L63 FN1 body dirty need to clean every PMR, 443 PH1 replace motor
Action: see detail...
Status: done
2023-08-02
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Connector tube at L63 2K3 need to be replace because is already bad comndition
Action: see detail...
Status: done
2023-08-01
363-RM1-WBI-PANEL-WELDING-AND-LIGHTING-WBI-PANEL-LAMP-AREA-FEED-BIM-&-333-BC1
Problem: Lamp at 333 WF3 lamp 1 off from 3, 363 RM botton south 1 lamp off and north 2 lamp off
Action: see detail...
Status: done
2023-07-31
393-FA-5A-MOTOR-ABNORMAL-VIBRATION
Problem: Check at local FS 17 mm/s, LS 24 mm/s
Action: see detail...
Status: done
2023-07-28
443-PH1-4TH-FLOOR-TPM-CLEAN--UP-AREA-BLOWER-FAN-AND-HANDLING-
Problem: Many stuck dirty need equipment clean up
Action: see detail...
Status: done
2023-07-27
363-RM1-INSTALL-BOX-PANEL-AND-PULLING-CABLE
Problem: Found cable tray
Action: see detail...
Status: done
2023-07-26
363-RM1-PREPARE-CABLE-6PX0.75,BOX-JUNCTION,PULL8NG-CABLE-FROM-INPUT-OUTPUT--PANEL-333-BC1-TO-2ND-FLOOR-RM
Problem: Found cable 6Px0.75 at Ware House
Action: see detail...
Status: done
2023-07-25
WORK-SHOP-DATA-ENTRY-SPARE-ELECTRIC-AND-INSTRUMENTATION
Problem: Delete spare part are empty stock
Action: see detail...
Status: done
2023-07-24
L63-RM1-PMR-SERVICE-ANALYSER-COAL-MILL
Problem: Clean up sample line, flange, filter probe, filter balston, membran pump, check filter humidity
Action: see detail...
Status: done
2023-07-21
ER3,ER4,ER5,ER6-WBI-SWITCH-GEAR-AND-TRAFO
Problem: Write ampere,voltage,kWTOT
Action: see detail...
Status: done
2023-07-20
463-KL1-WB1-BOTTOM-BLENDING,KILN,COOLER,CLINKER-SILO
Problem: Clean area motor,add grease 5 times and 20 times
Action: see detail...
Status: done
2023-07-18
363-RM1-WBI-FEED-BIN,-CT,423-BF1
Problem: Clean area motor, apron conveyor from dirty
Action: see detail...
Status: done
2023-07-17
423-BF1-ADD-RAIL-HOST
Problem: Spare needed cable power for motor Hoist
Action: see detail...
Status: done
2023-07-14
443-PH1-LANTAI-4-TPM-HOUSE-KEEPING
Problem: House keeping
Action: see detail...
Status: done
2023-07-07
423.2K1-CEMS-
Problem: Bagi ilmu tentang CEMS analiser dan cara servicenya dengan EVE Rzqi
Action: see detail...
Status: done
2023-07-05
WORK-SHOP-ASSEMBLING-EX-MOTOR-433-W1-M1-AND-DISMANTLE-MOTOR-EX-393-PP1
Problem: Clean up motor 433 W1 M1 assembling do test run measure ampere result R-S-T 16 A. Dismantle motor ex 393 PP1 found shaft and winding many water and are not good condition
Action: see detail...
Status: done
2023-07-05
TENT-OH-DISMANTLE-ALL-LAMP-AND-CABLE-POWER
Problem: Dismantle for all lamp at tent over haul and disconnect power cable
Action: see detail...
Status: done
2023-06-27
L63-RM1-PMR-SERVICE-ANALYZER
Problem: Clean up filter, probe,sample line
Action: see detail...
Status: done
2023-06-26
363-RM1-WBI-AREA-FEED-BIN,CT,RM,BAG-FILTER
Problem: Area motor clean up, clean up panel I/O
Action: see detail...
Status: done
2023-06-23
KALIBRASI-PRESSURE-TRANSMITTER-AREA--PH,COOLER,CM,RM
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-22
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PH,COAL-MILLCOOLER
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-21
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PH,CM,COLER.,RM
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-20
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PH,COOLER,COAL-MILL,RM
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-19
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PH,COOLER,COAL-MILL,-RM
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-18
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PH,COOLER,COAL-MILL,RAW-MILL
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-16
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PREHEATER,.COOLER-AND-COAL-MILL
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-15
KALIBRASI-PRESSURE-TRANSMITTER-AREA-PRE-HEATER,COOLER,COAL-MILL
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-14
KALIBRASI-PRESSURE TRANSMITTER
Problem: Kaliibrasi pressure transmitter zero dan span agak susah karena tidak stabil
Action: see detail...
Status: done
2023-06-13
KALIBRASI-PRESSURE-TRANSMITTER
Problem: Penggantian pressure transmitter karena ketika saat span tidak respon
Action: see detail...
Status: done
2023-06-12
CHECK-INSPECTION-ELECTRICAL-AND-WELDING-TOOLS-OF-CONTRACTOR
Problem: elektik kontraktor menyelesiakan kabel tidak sesuai dengan standar perusahaan
Action: see detail...
Status: done